5. Please ensure that the used device and any relevant accessories are disposed of in accordance with applicable regulations. 6. Afore inverter should be placed upwards and handled with care in delivery. Pay attention to waterproof. Do not expose the inverter directly to water, rain, snow or spray.
Safety & Symbols 2.2 Explanations of Symbols Afore inverter strictly comply with relevant safety standards. Please read and follow all the instructions and cautions during installation, operation and maintenance. Danger of electric shock The inverter contains fatal DC and AC power. All work on the inverter must be carried out by qualified personnel only.
Introduction 3. Introduction 3.1 Basic Instruction The Afore AF-SLP series hybrid inverters are designed to increase energy independence for homeowners. Energy management is based on time-of-use and demand charge rate structures, significantly reduce the amount of energy purchased from the public grid and optimize self-consumption.
Page 7
Introduction Energy flow: PV → Load → Battery → Grid Note: Advance Setting When select 0 W under P_Feed menu, the inverter will export zero energy to the grid. When select xx W under P_Feed menu, the inverter will export customized energy to the grid.
Page 8
Introduction 3.2.4 Maintain The Maintain mode is suitable for situations where the battery capacity is small, and the battery is charged and discharged at the specified power. Warning: Energy flow: The Maintain mode is only PV → Load → Grid → Battery available for some inverter.
Introduction 3.2.6 ExtEms ExtEms mode requires customized external control accessories that can remotely control the operation of the inverter. It is not recommended to use it without professional personnel. 3.2.7 PeakShave In PeakShave mode, the charging and discharging of the battery are controlled by setting the AC power to reduce the peak load of the power grid.
Page 10
Introduction A. Charge Setting PV Charge Mode 4 periods of time charge setting. Energy flow: PV → Battery → Load → Grid AC Charging 4 periods of time charge setting. Energy flow: PV and Grid → Battery → Load Note: After select AC charge, the AC will also charge the battery when the PV is low...
Page 11
Introduction B. Forced Discharging 4 periods of time discharge setting Energy flow: Battery and PV → Load → Grid C. Forbidden Discharge 4 periods of time discharge setting, the battery will be charged firstly. Energy flow: PV → Battery → Load → Grid...
Installation 4. Installation 4.1 Pre-installation 4.1.1 Unpacking & Package List Unpacking On receiving the inverter, please check to make sure the packing and all components are not missing or damaged. Please contact your dealer directly for supports if there is any damage or missing components. Package List Open the package, please check the packing list shown as below.
Installation Inverter Terminals Items Items DC Switch 1 DC Connectors ( + ) For PV Strings DC Connectors ( + ) For PV Strings DC Connectors ( − ) For PV Strings DC Connectors ( − ) For PV Strings AC Port &...
Page 15
Installation The inverter should be installed vertically on the wall, or lean back on plane with a limited tilted angle. <15° >0° Leave the enough space around inverter, easy for accessing to the inverter, connection points and maintenance. 300mm 300mm 300mm 500mm...
Installation 4.3.1 PV Connec�on The AF-SLP series hybrid inverter has one/two MPPT channels, can be connected with one/two strings of PV panels. Please make sure below requirements are followed before connecting PV panels and strings to the inverter: • The open-circuit voltage and short-circuit current of PV string should not exceed the reasonable range of the inverters.
Page 19
4.3.2 Ba�ery Connec�on AF-SLP series hybrid inverters are compatible with lithium battery. For lead acid battery or batteries with other brands, please confirm with local distributor or Afore for technical support. Note: Set battery type and manufacturer, please refer to Chapter 5.3.
Page 20
Installation Step 1 The battery wires are threaded through waterproof sleeves and placed into the iron core according to the diagram. 20-25mm Note: Battery cable suggestion Cross-section 1 AWG,40-50mm. Step 2 Use a hex wrench to lock the battery wire and ensure that the fastening screw locks the metal wire tightly.
Page 21
Installation Step 3 Insert the iron core into the battery port and tighten clockwise until it cannot rotate.. Step 4 Insert the waterproof adhesive sleeve into the battery terminals, pay attention to sealing to prevent water from entering and causing equipment damage.
Installation 4.3.2.1 BAT-CAN/RS485 P i n87654321 P in123454 67 8 CAN/RS485 Lithium 12345678 12345678 T568B T568B Assignment Assignment CANH_BAT1 BAT-485-A BAT-485-B CANL_BAT1 BAT-485 CAN-485...
Page 23
Installation 4.3.3 Mul� Inverter Parallel Grid Meter Load 12345678 RJ45 Plug Assignment 485-A2 485-B2 Smart Load Cri�cal Load 12345678 RJ45 Plug 485A 485B Assignment 485-A2 485-B2 Smart Load Cri�cal Load 12345678 RJ45 Plug Assignment 485-A2 485-B2 Note: The meter only communicates with the host and does not communicate with the machine.
Installation 4.3.4 AC Connec�on The AC terminal contains “GRID” and “EPS”, GRID for load, and EPS for emergency load. Before connecting, a separate AC breaker between individual inverter and AC input power is necessary. This will ensure the inverter be securely disconnected during maintenance and fully protected from current of AC input.
Installation 4.3.5 CT or Meter Connec�on Meter and a current sensor(CT for short below) are used to detect current power direction of the local load and the grid. The output control function of the inverters will be activated based on the detected data. Meter Note: In a pure off-grid system, electrical energy is mainly generated and used...
Page 27
Installation Install the Meter Inverter Afore Meter Main Breaker Grid Grid Load Meter Port pin assignment Assignment RS485 A RS485 B Meter Note: Please follow below pin order RS485A to single-phase meter (Pin 24) RS485B to single-phase meter (Pin 25)
Installation EPS Power Inverter Emergency light Three -phase load Afore Meter Main Breaker L1 L2 L3 N Grid Grid Load Meter Port pin assignment Assignment RS485 A RS485 B Meter Note: Please follow below pin order RS485A to single-phase meter (Pin 24) RS485B to single-phase meter (Pin 25) 4.4 Communication Connection...
Page 29
Installation Step 1 Wifi/GPRS Step 2 Wifi/GPRS Turn on the DC switch and AC circuit breaker, and wait until the LED indicator on the monitoring module flashes, indicating that the monitoring module is successfully connected.
Operation 5. Operation 5.1 Control Panel Pwron 20xx-xx-xx 24:00:00 week xxxxxxxxxxxxxxxxxxxxx Inv: Pv: Gen: Bat: Soc: Grid: Load: Eps: EPS Info Explanation Explanation Time Status ID PV Info Information Inverter Info GEN Info BAT Info Grid Info EPS Info Load Info Operating Status Setting Inverter SN...
Operation 5.2 Menu Overview AF-SLP hybrid inverter has a LCD for clearly operating, and menu of the LCD can be presented as following: System information Safty PV information Prated Bat information VRated Inv information IRated Grid infommation Wifi lP Display Menu Gen information Wifi SN Eps information...
Operation 5.3.1 Safety Setting Sys Set System parameters setting Safety Safety Specifications Com-50Hz Com-60Hz Note: China Japan-50 Select the safty Japan-60 US_240S according to the US_240D US_208S requirements of the installation site. US_208D Australia UK-G99 UK-G98 ..5.3.2 Time & Date Setting System Set System parameters setting...
Operation 5.3.3 PV Mode Setting PV Mode NoPV 1. No PV connection Independent 2. “Independent” and “Parallel” setting Parallel for professional installers. 5.3.4 Bat Setting 5.3.4.1 Bat type Setting Battery parameters setting Bat Setting Battery Type Type None Lithium LeadAcid Simulated 5.3.4.2 Lithium battery brand Setting...
Page 34
Operation Lithium Afore Talsu Note: Sunplus Taico Please select the right Pylon Rita batterybrand to your use. Dyness CALB ....5.3.4.3 Lead Acid Setting Battery parameters setting Bat Setting Lead-acid 1.ON:NTC Diasble,OFF:NTC Enable NTCDisable 2.Capacity 10-1000AH Capacity: 0.0AH 3.ResComp:Resistance compensation ResComp: 0.0mΩ...
Operation DRMS 1. DRMS Enable. Ripplectrl 2. Ripple control 3.P:Maximum actie output power. 0.0% 4. P%: Active output limit. P(V) 5. Reduce power when the grid voltage P(F) is too high P(V) Setting 6. Reduce power when the grid frequency P(F) Setting is too high...
Operation 1.Q:Reactive power. 2. PF:Power Factor. 3.Q(V):The reactive power is adjusted 0Var according to the voltage. 0.000 4. PF(P):The power factor is adjusted Q(V) Setting according to the active power. PF(P) Setting 5.Q(P):The reactive power is adjusted according to the active power. Q(P) Setting Q(V)
Operation CT/Meter CT Ratio Meter Type None Af-Sp Af-Tp The CT Ratio ranges Meter from 0-100. Ukob418 Ukob115 Meter4 Meter5 5.3.9 Setting EpSEN ON:Eps Enable EpsEN EpSEN OFF:Eps Disable 5.3.10 Setting GenEN ON:Gen Enable GenEN GenEN OFF:Gen Disable 5.3.11 Com Setting 5.3.11.1 Com1 Setting Communication...
Page 39
Operation 5.3.11.2 Com2-4 Setting Communication Com Setting settings Com X X:2-4 1.Port:Meter/Modbus/sunspec/ Parallel/Bat Port 2.Address Addr 3.Baud rate: Baud 115200/57600/56000/38400/ 19200/9600 Note: When the port is selected as a Meter, the baud rate is 9600.When the port is selected as Parallel, the baud rate is recommended to be set to 9600. 5.3.11.3 Parallel Setting Communication...
Operation 5.3.12 Protection Parameters 5.3.12.1 Prot En Setting Protection The protection Prot Enable function enabled 1.Insulation resistance detection lsochk 2.Leakage current detection Gfcichk 3. Ground detection Earthchk 4. Rapid shutdowm enabled RsdEn 5.10-minute overoltage protection 10MinOvervolt 5.3.12.2 V Max Setting Protection Overvoltage V Max...
Page 41
Operation 5.3.12.3 V Min Setting Protection Under voltage V Min protection 0.0V 1. first level Voltage Lower limit 0.0V 2.second level Voltage Lower limit 0.00S 3. first level Voltage Lower limit time 0.00S 4.second level Voltage Lower limit time 5.3.12.4 F Max Setting Protection Over-frequency...
Operation Under-frecuency F Min protection 0.00HZ 1. frst level Frequency lower limit 0.00HZ 2.second level Frequency lower limit 0.00S 3. first level Frequency lower limit time 0.00S 4.second level Frequency lower limit time 5.3.12.6 T Conn Setting Protection T Conn 1.
Page 43
Operation Type of Fault Code Name Recommend Solution SelfUse 1.Self-Use Chgfst 2.Back-Up SellFst 3. seling First Maintain 4. Maintain (in development) cmdChar 5. Command charge and discharge ExtEms 6. ExtemalEMs dispatch PeakShave 7. Peak shaving 5.3.13.2 Cmd chg Setting Energy management system EMS Param parameters setting Command charge...
Page 44
Operation 1.Acchg :Ac charging enable/disable. SocMax: 0.0% 2.SocMax:AC charging maximum Soc. ACChg 3.P%:AC charging Percentage. 0.0% 4.Time1:Ac charging start time1-AC charging Time1: 00:00- 00:00 end time 1. 5.Time2:AC charging start time2-AC charging Time2: 00:00 - 00:00 end time 2 . Time3: 00:00-00:00 6.Time3:AC charging start time3-AC charging...
Page 45
Operation 1.Force Dchg :Forced discharging enable/disable. 2.SocMin: Forced discharging max Soc. SocMax: 0.0% 3.P%: Forced discharging power percentage. ForceDChg 4.Time1:Forced discharging start time1 -Forced 0.0% discharging end time 1. Time1: 00:00- 00:00 5.Time2:Forced discharging start time2 -Forced Time2: 00:00 - 00:00 discharging end time 2.
Page 46
Operation SOC1: 1. When the current SOc is less than SOC2: SOC1,stop supplying power to load 1. SOC3: 2. Up to four loads can be connected SOC4:...
Maintenance&Trouble Shooting 6.1 Power ON • Turn on DC switch. • After LCD lighting, hybrid inverter should be set following Chapter 5.3 at the first time. • When inverter running under normal mode, Running indicator will light up(Ref. to Chapter 5.1). 6.2 Power OFF •...
Page 48
Maintenance&Trouble Shooting Fault Code and Trouble Shooting Type of Fault Code Name Description Recommend Solution • Check PV modules connection PV connection type • Check PV Mode setup Ref. PvConnectFault different from setup Chapter 5.3. • Check PV modules wires, those wires are soaked or damaged, and then carry ISO check among PV out rectification.
Page 49
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution PV7ReverseFault PV8ReverseFault PV9ReverseFault PV10ReverseFault PV11ReverseFault PV12ReverseFault Pv1AbnormalFault Pv2AbnormalFault Pv3AbnormalFault Pv4AbnormalFault Pv5AbnormalFault Pv6AbnormalFault Pv7AbnormalFault Pv8AbnormalFault PV Fault Pv9AbnormalFault Pv10AbnormalFault • Check PV modules partial occlusion or Pv11AbnormalFault cells damaged. PV(+) and PV(-) reversed •...
Page 50
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution • Check inverters connected battery lines PcsBatOverVoltFault and connectors broken or loose connect. • Carry out rectification if broken or Battery voltage over or PcsBatUnderVoltFault loose. under • Checking battery voltage is abnormal or not, then maintenance or change new PcsBatInsOverVoltFaul battery.
Page 51
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution BatPreChaFault BmsBatChgMosFault BmsBatDChgMosFault BMSVolOVFault BMSVolLFault VolLockOpenFault VolLockShortFault ChgRefOVFault • Inverter will restart automatically when the grid return to normal. GridLossFault Grid lost (islanding) • Check inverter connected with grid connectors and cable normal or not. •...
Page 52
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution • Reduce loads. • If sometimes overload, it can be ignored, when generation power enough UpsOverPowerFault 0ff-grid load over can be recovery. • If those faults occurs continuously and frequently, please ask help for local distributors.
Page 53
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution Pv9SwOverCurrFault Pv10SwOverCurrFault Pv11SwOverCurrFault Pv12SwOverCurrFault Boost1SelfCheck(boost)Fault Boost2SelfCheck(boost)Fault Boost3SelfCheck(boost)Fault Boost4SelfCheck(boost)Fault Boost5SelfCheck(boost)Fault • Power off, then restart (Ref. Chapter8). PV boost circuit abnormal Boost6SelfCheck(boost)Fault • If those faults continuously and when self checking frequently, please ask help for local Boost7SelfCheck(boost)Fault distributors.
Page 54
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution • Change fuse. BDCFuseFault BiDC fuse broken • Power off, then restart (Ref. Chapter8). • If those faults continuously and BDCRelayFault BiDC relay abnormal frequently, please ask help for local distributors.
Page 55
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution UpsOverVoltFault Off-grid output voltage over or under UpsUnderVoltFault • Power off, then restart (Ref. Chapter8). • If those faults occurs continuously and UpsOverFreqFault AC Fault Off-grid output frequency frequently, please ask help for local over or under distributors.
Page 56
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution UpsSCurAdChanFault UpsTCurAdChanFault GenRCurAdChanFault GenSCurAdChanFault GenTCurAdChanFault UpsRDcvAdChanFault UpsSDcvAdChanFault UpsTDcvAdChanFault All temperature sensors TempAdChanFault abnormal The sample value of PV, VoltAdConflictFault battery and BUS voltage • Power off, then restart (Ref. Chapter8). inconsistent •...
Page 57
Maintenance&Trouble Shooting Type of Fault Code Name Description Recommend Solution EnvirTempAdChan- Warning • The warnings are not matter influence. • Power off, then restart (Ref. Chapter8). Some temperature sensors CoolingTempAdChan- • If those faults occurs continuously and abnormal Warning frequently, please ask help for local distributors.
Need help?
Do you have a question about the AF7K-SLP and is the answer not in the manual?
Questions and answers
При използване на олвно кисела батерия на кой "com" или по точно на кои пинове се връзва Ntc датчик става въпрос за модел afore AF8K-SLP. Монофазен