5. Tighten the nut back to the cable gland COM1.
6. Connect the grounding cable
Insert the grounding cable through the POWER AC_IN cable gland at the bottom of the eManager box.
1. Prepare an OT terminal.
a
Callout
Description
a
Cable
d
Hydraulic pilers
2. Locate the grounding bolt. Install the OT terminal to the bolt and tighten it by using the hexagon flange nut.
V0.0
b
Callout
Description
b
Heat shrink tubing
e
Heat gun
Callout
Description
a
OT grounding terminal
b
Hexagon flange nut
c
Callout
Description
c
OT terminal
/
/
7
d
b
a
© 2024 Sanjing. All rights reserved.
e
Need help?
Do you have a question about the eManager-C1 Pro and is the answer not in the manual?
Questions and answers