6. INSTALLATION
On receipt, check the state of the material and notify forthwith your insurance company or your distributor in the event of
damage occurring during transport. If necessary, proceed with the repairs.
ATTENTION! SAFETY INSTRUCTIONS!
1. The installation personnel must follow all laws and standards applicable to the gate installation site.
2. When installing the gate, all operations must be done by qualified personnel. All the safety instructions indicated in this
section and in Chap. 1, page 4 must be followed.
3. The gate must be installed with permanent wiring as required by local codes.
4. To reduce the risk of injuries, the grounding connection must be done in accordance to the local codes.
5. To reduce the risk of entrapment, the gate must be installed in a location with sufficient clearance between the gate and
adjacent structures when opening and closing. (600 mm minimum)
6. Controls intended for user activation must be located at least 2 meters away from any moving part of the gate and where
the user is prevented from reaching over, under, around, or through the gate to operate the controls. Outdoor or easily
accessible controls shall have a security feature to prevent unauthorized use.
14
BL 229
Need help?
Do you have a question about the BL 229 and is the answer not in the manual?