Wall base connection with dry contact (boi-
ler consent)
CALDAIA
Alimentazione
Collegamento caldaia
220/230Vac
•
Connect the two power wires to termi-
nals 1 (N) and 2 (L).
•
•
Connect the boiler (or air conditioner) to
terminals 4 (COM) and 6 (NO).
8
Plikc S.r.l. - Via del Lago Terrione, 83 - 00165 Roma - info@plikc.com - www.plikc.com
Wall base connection with zone valve or
other 220/230V AC load
VALVOLA
DI ZONA
230Vac
Alimentazione
220/230Vac
WARNING:
The illustrated wiring diagram
represents only one of the possible con-
nections. For installation, contact a quali-
fied technician.
Installation with recessed base
1
The recessed base included in the package is required for in-
stallation on a 503 box (3 modules);
2
Remove the wall base from the display module.
3
Take the recessed base and connect the boiler following the
wiring diagram in the next section.
Note: Once the base is screwed onto the 503 box, attach
the display module by snapping it into place with light pres-
sure on the sides of the base, never in the center, to avoid
damaging the LCD display.
Plikc S.r.l. - Via del Lago Terrione, 83 - 00165 Roma - info@plikc.com - www.plikc.com
9
Need help?
Do you have a question about the NEVE PRO W and is the answer not in the manual?