Download Print this page

Floor Preparation - Post Glover SMARTPULSE MV Installation, Operation And Maintenance Instructions

Medium voltage high resistance grounding system

Advertisement

SMARTPULSE™ MV INSTRUCTION MANUAL

2.5 Floor Preparation

The equipment's foundation must be designed with suitable strength and levelness. The purchaser is responsible for
anchoring the unit to the floor with anchors of suitable strength.
WARNING: When mounting on or over a combustible surface, a floor plate of at least 1.43 mm galvanized steel
2.6 Grounding... CAUTION!
To reduce the possibility of electric shock, the unit must be properly grounded before making any system power
connections. Connect the system ground to the ground bus located in the lower portion of the free-standing units. Make
sure that all ground conductors are sized per the NEC (NFPA 70).
NEMA 1
Ground Bus Location
NEMA 3R
Ground Bus Location
2.7 Line and Control Connections
1369 Cox Avenue • Erlanger, KY 41018 • USA
Phone: 800-537-6144 / 859-283-0778 • Fax: 859-283-2978
www.postglover.com
Serving the Electrical Industry Since 1892
© 2025 Post Glover Resistors, Inc. • PGR Document #HR550-25
10

Advertisement

loading
Need help?

Need help?

Do you have a question about the SMARTPULSE MV and is the answer not in the manual?

Subscribe to Our Youtube Channel