rg59 mini quick steps
Calibrate Cable
Once the cable is prepared,
connect VoD unit then press and
hold the ON/OFF button for 8
seconds. This process will take
around 5 mins.
Cable Installation
Disconnect the VoD unit, and
replace the connector in the
center of the cable
roll,
otherwise as you pull cable
the end with the BNC
connector will spin and break.
Cable Installation
following holes
For the following holes, the
cable must be looped down
and back up the hole, record
the meter markers in and out
of the holes, leaving slack in-
between holes.
For further queries get in touch:
info@shottrack.com.au
STEP
01
Check Settings
STEP
02
Once calibrated, make sure the
unit reads approximately 305m.
Cable Installation
STEP
03
The end of the cable must be
looped at least 3 meters, then
lowered down the first fired hole.
STEP
04
STEP
05
Connect and Set
Before the blast, connect VoD
unit, turn on device, make sure it
STEP
06
reads approximately 305m. The
unit will arm itself after a few
First hole
minutes.

Advertisement

loading
Need help?

Need help?

Do you have a question about the RG59 MINI and is the answer not in the manual?

Questions and answers

Summary of Contents for ShotTrack RG59 MINI

  • Page 1 STEP Calibrate Cable Check Settings STEP Once the cable is prepared, connect VoD unit then press and Once calibrated, make sure the hold the ON/OFF button for 8 unit reads approximately 305m. seconds. This process will take around 5 mins.
  • Page 2 RG59 Mini quick steps Look for the orange dot and cut the tape to open the box STEP Open up and remove frame STEP STEP Retrieve cable and STEP connector from centre hole Push the cable back through the frame and replace...