Pre-Installation Checklist - GE JGP633SETSS Installation Instructions Manual

36″ sealed gas cooktop
Table of Contents

Advertisement

Available languages

Available languages

PRE-INSTALLATION CHECKLIST

When preparing cooktop opening,
A
make sure the inside of the cabinet and
the cooktop do not interfere with each
other. (See section on preparing the
opening.)
Remove packaging materials, grate
B
boxes, regulator with literature, and
literature package from the cooktop
before beginning installation.
Foam
Packaging
Cooktop
Installation Instructions
Literature Package
Grate boxes
Remove Installation Instructions from
C
literature pack and read them carefully
before you begin.
Be sure to place all literature, Use and
Care, Installations, etc. in a safe place
for future reference.
Make sure you have all the tools and
D
materials you need before starting the
installation of the cooktop.
Your home must provide the adequate
E
electrical service needed to safely and
properly use your cooktop. (Refer to
section on electrical requirements.)
When installing your cooktop in your
F
home, make sure all local codes and
ordinances are followed exactly as
stated.
G
Make sure the wall coverings,
countertop and cabinets around the
cooktop can withstand heat (up to
200°F) generated by the cooktop.
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jgp628Jgp630Jgp963Jgp970Jgp975Zgu36

Table of Contents