• Avoid upsizing electrical service
• Fully integrated solutions
• Efficient installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ReliaHome ABBHEM2 and is the answer not in the manual?

Questions and answers

Summary of Contents for ABB ReliaHome ABBHEM2

  • Page 1 — I N S TA L L AT I O N M A N UA L ReliaHome™ Smart Panel ABBHEM2 • Avoid upsizing electrical service • Fully integrated solutions • Efficient installation...
  • Page 3: Table Of Contents

    — Table of contents Introduction Warnings Read before use System design considerations Installation Configuration and account setup Troubleshooting and repairs Operational information Product specifications Limited warranty for ABB ReliaHome smart panel Radio frequency statement...
  • Page 4: Introduction

    Introduction Welcome and congratulations on your purchase of the ABB ReliaHome™ Smart Panel. The ABB ReliaHome™ Smart Panel (ABBHEM2) is a standalone product that extends the capability of an existing circuit breaker panel (or “electrical panel”) by providing measurement and remote control of up to twelve (12) 120V circuits or six (6) 240V circuits in a home or building.
  • Page 5: Warnings

    W A R N I N G S — Warnings Danger: hazardous voltages present during installation and servicing that, if not avoided, could result in death or serious injury. Precautions and qualifications required. Refer to the following page. Peligro: voltajes peligrosos presentes durante la instalación y el mantenimiento que, si no se evitan, podrían provocar la muerte o lesiones graves.
  • Page 6: Read Before Use

    • ABB offers (2) whole-house surge protectors, product labeling, observe the following THQLSURGE2 and THOMESURGE. These can be safety precautions: purchased through online or in store from the •...
  • Page 7: System Design Considerations

    For voltage drop calculations, assume • The ABBHEM2 does not replace the need for ABBHEM2 conductors add 15 one-way-feet to standard circuit breakers. The ABB smart panel the circuit. does not provide overcurrent protection, ground fault protection, arc fault detection, or other •...
  • Page 8: Installation

    • Cable ties (Optional) backfed solar PV is present) Note: Additional items include an antenna, installation hardware, ABB • Electrical tape (Optional) Identifier Sticker Sheet, Current Setting sticker, and an smart panel Circuit Label & CT Table.
  • Page 9 I N S TA L L AT I O N Required Tools • Drill • Stud-finder (optional) • Flathead screwdriver • Drywall saw (optional) • Pliers • Knockout punch or hole saw for 2″ conduit (2 1/2 hole size) • Phillips screwdriver •...
  • Page 10 R E L I A H O M E S M A R T PA N E L I N S TA L L AT I O N M A N U A L Hardware installation overview Hardware installation steps •...
  • Page 11 I N S TA L L AT I O N Step 2: (Flush-mount only) Cut and remove drywall. Step 3: Knock out or punch one hole for 2” conduit fit. Tools: Tape measure, level (optional), stud finder (optional), and drywall saw or suitable alternative. Tools: Screwdriver, pliers, drill (optional), and knockout punch (optional).
  • Page 12 R E L I A H O M E S M A R T PA N E L I N S TA L L AT I O N M A N U A L Step 4: Measure and mark hole locations Step 5: (Surface-mount only) Secure mounting for mounting.
  • Page 13 I N S TA L L AT I O N Step 6: Attach ABBHEM2 antenna and guide smart Step 7: Secure smart panel to wall/bracket and panel wire whip into electrical panel. electrical panel. Lockring Lockring Lockring Conduit and Conduit and Conduit bushing bushing...
  • Page 14 Tools: Screwdriver and pliers (optional). EGC to ground bar Warning: High voltage. Ensure main Note: For purposes of ABB installation, breaker is off. Main service lines are the top row of breakers will always be always live. Ground wire must be classified as “A”.
  • Page 15 (split phase). Mark the breaker with a clearly identifying label (ex. “ABB Smart Panel Power”). if using a GFCI breaker, ensure that the Lumin neutral is connected to the breaker and the breaker neutral is terminated on the neutral bar.
  • Page 16 R E L I A H O M E S M A R T PA N E L I N S TA L L AT I O N M A N U A L Step 12: Connect smart panel wire labeled “line 1# Step 13: Connect smart panel wire labeled “line 1# breaker”...
  • Page 17 I N S TA L L AT I O N Step 14: Record circuit name and breaker row (A/B) Step 15: Repeat steps 11-14 until all smart panel with corresponding smart panel line number. line # wires are connected. Tools: Screwdriver, wire stripper, and wire Breaker Breaker splice connectors.
  • Page 18 (ABBHEM1CT) which is available for purchase from If the panel includes a main circuit breaker, note ABB and only used when solar is backfed into the that the main breaker may contain crossover electrical panel as shown below. When auxiliary CTs busing, with the result that the feeder on the left are not used, the unused “aux”...
  • Page 19 Step 18: Test for crossover before Current Transformer placement. Tools: Multimeter. REMINDER: In a ABB installation, the top* row of breakers in an electrical panel is always designated “A”. Whichever conductor supplies breaker Row A will be designated “Line A.”...
  • Page 20 R E L I A H O M E S M A R T PA N E L I N S TA L L AT I O N M A N U A L Step 20: Record the Placement of Current Step 21: If the ReliaHome Smart Panel is to be used Transformers.
  • Page 21 Certified Installer training. Changes to this setting can only be entered locally, while connected to the same network as the ABB ReliaHome™ Smart Panel. Complete the rest of the current limiting label, including the list of controlled loads/circuits connected to the ABB ReliaHome™...
  • Page 22 R E L I A H O M E S M A R T PA N E L I N S TA L L AT I O N M A N U A L Step 24: Apply Labels Warning: Electrical codes may require additional labeling.
  • Page 23: Configuration And Account Setup

    WiFi connection and is not affected by replacing Knowledge Base the router or resetting the WiFi password. 3. Download the ABB mobile app (https://electrification.us.abb.com/products/ load-centers-accessories/reliahome-smart-panel). In the Apple App Store or Google Play Store, search for “ReliaHome Smart Panel App”.
  • Page 24: Troubleshooting And Repairs

    ABB. Toujours débrancher panel. Case-specific authorization and instruction l'alimentation électrique avant will be provided by ABB if applicable. Do not open d'effectuer des réparations. cover or attempt repairs otherwise – even with breakers off hazardous voltages may be present.
  • Page 25: Operational Information

    Ensure that the ABB smart panel is not in Setup Mode and that WiFi connectivity is enabled on the mobile device.
  • Page 26: Product Specifications

    60 A per Line × 6 Lines and Ratings up to 50 °C 30 A per Line × 6 Lines Only 1 ABB Smart Panel per electrical panel for service Load Breaker 50 A per Line × 6 Lines and...
  • Page 27: Limited Warranty For Abb

    This limited warranty does not cover any damage state to state. ABB warrants that during the war- due to: (a) transportation; (b) storage; (c) improper ranty period, the product will be free from defects in installation;...
  • Page 28 R E L I A H O M E S M A R T PA N E L I N S TA L L AT I O N M A N U A L What Are Your Remedies Under This Warranty? Limitation of Liability With respect to any defective product during the ap- The remedies descried above are your sole and ex-...
  • Page 29: Radio Frequency Statement

    R A D I O F R E Q U E N C Y S TAT E M E N T — Radio frequency statement Note: This equipment has been Changes or modifications not expressly approved by the party responsible for compliance could void tested and found to comply with the user’s authority to operate the equipment.
  • Page 30 With regard to purchase orders, the agreed particulars shall prevail. ABB AG does not accept any responsibility whatso- ever for potential errors or possible lack of information in this document.
  • Page 32 We reserve all rights in this document and in the subject matter and illustrations contained therein. Any reproduction, disclosure to third parties or utilization of its contents – in whole or in parts – is forbidden without prior written consent of ABB Inc. Copyright© 2024 ABB...