Download Print this page

Danfoss Termix Solar A+ Operating Manual page 16

Advertisement

Operating Guide Termix Solar A+/B+/S+
7.0 Troubleshooting
7.1 Troubleshooting in general
In the event of operating disturbances, the following basic features
should be checked before carrying out actual troubleshooting:
the substation is connected to electricity,
the strainer on the DH supply pipe is clean,
the supply temperature of the DH is at the normal level
(summer, at least 60 °C - winter, at least 70 °C),
the differential pressure is equal to or higher than the normal
(local) differential pressure in the DH network – if in doubt, ask
the DH plant supervisor,
pressure on the system - check the HE pressure gauge.
16 | © Danfoss | 2024.01
Authorized personnel only
Assembly, start-up and maintenance work must be performed by
qualified and authorized personnel only.
AQ173986472867en-010501 / LUK38016

Advertisement

loading
Need help?

Need help?

Do you have a question about the Termix Solar A+ and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Termix solar b+Termix solar s+