  • Page 1 2mm Drill bit...
  • Page 2: Any Questions

    PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.
  • Page 3 ACCESSING VIDEO GUIDES... ACCESSING VIDEO GUIDES... 3. Scan QR code... Some steps within this set of instructions come with an added video guide for your convenience. These can be accessed via the QR code and used to aid you in constructing that step.
  • Page 4 Before assembly Roof Support - 28x28x1133mm QTY 1 please make sure you have a suitable base ready to erect your F2828-1133mm building Door Frame - 28x28x1085mm QTY 2 F2828-1085mm Door Side Frame - 28x28x1118mm QTY 1 F2828-1118mm MADE IN GREAT BRITAIN Eaves Frame - 28x28x969mm QTY 2 Overall Dimensions: Base Dimensions:...
  • Page 5 Step 2 IMPORTANT: Pre-drill before xing screws. Pre Assembly PLEASE SCAN HERE: Parts Needed - No. 4 QTY 2 Before assembling remove the transportation blocks from the bottom of each panel. - No.2 QTY 1 Take care removing the blocks as to not damage the panels. Tap with a at headed Place the back panels (No.4) and screwdriver and hammer.
  • Page 6 Step 4 Step 6 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 9 QTY 1 Parts Needed - No. 9 QTY 1 - No. 19 QTY 1 rst door frame (No.9) Place the Using 2x20mm screws x the “L” inbetween the gable and the front bracket (No.19) to one end of the panel and secure in place using...
  • Page 7 Step 10 Step 8 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 12 QTY 2 Align each door (No.6) into the door gap - No. 13 QTY 1 and secure at either side using using 3x30mm screws per hinge (No.18).
  • Page 8 Step 12 Step 14 IMPORTANT: Pre-drill before xing screws. Cut the felt (No.21) into two strips measuring Once the roof is xed, secure the building 2050mm (L) x 1000mm (W) and lay onto the with15x50mm screws. roof in the order shown in the diagram. *Ensure to screw through the * Ensure there is approximately 50mm of framing into the oor bearers.
  • Page 9 Step 17 Step 15 IMPORTANT: Pre-drill before xing screws. IMPORTANT: Pre-drill before xing screws. Parts Needed - No. 22 QTY 1 Parts Needed - No. 14 QTY 2 Screw the Staple (No.22) to the left Fix the cover trims (No.14) to the back Door, Make sure the Hasp (No.22) is corners of the building and across the joint at the back, securing each trim...
  • Page 10 PLEASE SCAN HERE: ANY QUESTIONS? Scan code contact us via our customer portal.