Mercia Garden Products 01OSBA0307PB-V1 General Instructions Manual

3x7 osb apex exstension pack

Advertisement

Quick Links

General Instructions
01OSBA0307PB-V1 (01OSBA1007DDSW-V1 & 01OSBA1307DDSW-V1)
3x7 OSB Apex Exstension pack
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied)
including a Phillips screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm
bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions.
For the duration of heavy or extended periods of rain, swelling of the wood panels may
occur. Warping of the wood may also occur during excessive dry spells due to an interior
moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is
suggested that the outdoor building is sprayed with water during extended periods of
warm sunshine and sheltered as much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to protect
the product during transit and for upto 3 months against mould. To validate your
guarantee and ensure longevity of the product, it is ESSENTIAL the building is treated
with a wood preserver within the rst three months of assembly and thereafter in
accordance with the manufactures recommendations. Care must be taken to ensure
the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to
diagrams for the base dimensions, The base should be slightly smaller than the external
measurement of the building, i.e. The cladding should overlap the base, creating a run
o for water. It is also recommended that the oor be at least 25mm above the
surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in
the case of childrens products independently tested to EN71 level, we cannot accept
responsibility for your safety whilst erecting or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
For ease of assembly, you
will need a tape measure to
check dimensions of
components.
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.
P 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 01OSBA0307PB-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01OSBA0307PB-V1

  • Page 1 All building’s should be Winter = High Moisture = Expansion erected by two adults Summer = Low Moisture = Contraction 01OSBA0307PB-V1 (01OSBA1007DDSW-V1 & 01OSBA1307DDSW-V1) 3x7 OSB Apex Exstension pack BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY For ease of assembly, you...
  • Page 2 01OSBA0307PB-V1 (01OSBA1007DDSW-V1 & 01OSBA1307DDSW-V1) Please retain product label and instructions for future reference 10x7 13x7 Overall Dimensions: Nail Bag Overall Dimensions: Width = 2230mm Width = 2230mm Depth = 3198mm Depth = 4248mm 30mm Screw x 52 60mm Screw x 16...
  • Page 3 Please retain product label and instructions for future reference Step 1 Step 2 Place oor on rm and level base, ensure Place the 7x7 plain side at on the ground and x the the short plain panel with base has suitable drainage free from areas where water can collect.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 4 Place the 7x7 window side at on the Attach the gable ends as shown in the 7x7 ground and x the the short plain panel instructions and follow the steps to t the with 3x50mm screws.
  • Page 5 Please retain product label and instructions for future reference Step 5 Step 6 To make the building rigid, support truss’ To strengthen the building a second set of need to be built in position. Trusses need to be xed into postion. Create the Ridge bar using the 10x7 Pre drill...
  • Page 6 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 7 Step 8 10x7 Fix the Eaves framing to the Roof OSB ush to To secure the Roof to the building, start at the short edge with 3x30mm screws.
  • Page 7 Please retain product label and instructions for future reference Step 9 Step 10 Once the Roof is xed into position, x the Fix the Cover Trims to the building to the building to the oor with evenly spaced front and back as described in 50mm screws.
  • Page 8 Please retain product label and instructions for future reference Step 12 Step 11 Complete the building by following the Cut the felt into 3 even lengths. Lay onto 01OSBA0707DDSW-V1 instructions for roof as shown ensuring there is overhang attaching the fascias. around the sides then nail the felt tacks every 100mm.

This manual is also suitable for:

01osba1007ddsw-v101osba1307ddsw-v1

Table of Contents