USER MANUAL E2 and Eaton Breaker Panel Installation and Operations Manual...
Page 2
Copeland 1065 Big Shanty Road NW, Suite 100 Kennesaw, GA 30144 USA 770-425-2724 • 1-800-829-2724 www.copeland.com Email: ColdChain.TechnicalServices@copeland.com...
E2 can communicate directly with Eaton's Breaker Control Bus (BCB) modules (Eaton Breaker Panel). Communication with the E2 will enable the user to use features such as Time The Breaker Control Bus (BCB) module is designed to fit in Schedules, Enhanced Lighting, and Logging. In addition, the...
24 V terminal of the BCB modules, and the other secondary wire connected to the 24 Com • Terminate at E2 with all three jumpers at one end of the terminal of the BCB modules. The side of the 24VAC network.
ON -> ON -> ON -> Panel 4 Panel 3 Panel 2 Figure 3-1 - E2 and Eaton Breaker Panel Layout with Example Left/ Right Rail Numbering ON -> ON -> ON -> ON -> Figure 3-2 - BCB Address Configuration...
connector on the COM port you wish to assign as MODBUS. 1. Press (System Configuration) Wire + on E2 to LAN - on BCBs. Wire - on E2 to LAN + on BCBs. 2. Press (Licensing) Polarity on BCB MODBUS connectors is the inverse ...
3.4.2 Set Up Network Ports Enter your license key to activate the Eaton Breaker Panel: Before setting up an Eaton Breaker Panel, the port on the E2 that has the MODBUS cable connected must be set up as a MODBUS port.
, select ETN Breaker Panel then Press access the Device tab. If on the E2 Home screen, press or to access the Lighting Schedule depending on whether a BX or CX E2 Rails Present must be set by the end user. Access C6:Device and select Rails Present, choose the number of rails and controller is being used.
application, press - EDIT and select 2. Set Multiple Outputs. Figure 4-4 - Single Breaker Proof Input Setup in E2 Lighting Change the PROOF IN format by pressing - EDIT Figure 4-5 - Set Multiple Breakers in E2 Lighting and then 1.
Lighting Panel, and for the Inputs Press or to access the Lighting Schedule from the property select the breaker numbers that are included in Home screen depending on whether a BX or CX E2 controller the group. is being used.
E2. Check the Lan + and Lan - cable jackets to make sure all network cable is Belden 2. Connect the Lan + and Lan - wires to the E2 RS485 #8761 or equivalent. MODBUS network.
Page 14
The contents of this publication are presented for informational purposes only and they are not to be construed as warranties or guarantees, express or implied, regarding the products or services described herein or their use or applicability. Copeland reserves the right to modify the designs or specifications of such products at any time without notice.
Need help?
Do you have a question about the E2 and is the answer not in the manual?
Questions and answers