PHS THOR 9 Installation, Operation & Maintenance Manual

Hammer throw cage
Hide thumbs Also See for THOR 9:

Advertisement

Quick Links

THOR 9 HAMMER
2/02/25
THROW CAGE
Installation, Operation &
Maintenance Manual
PLAY HARD SPORTS EQUIPMENT
13 Alex Fisher Drive
Burleigh Heads, QLD 4220

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the THOR 9 and is the answer not in the manual?

Questions and answers

Summary of Contents for PHS THOR 9

  • Page 1 THOR 9 HAMMER 2/02/25 THROW CAGE Installation, Operation & Maintenance Manual PLAY HARD SPORTS EQUIPMENT 13 Alex Fisher Drive Burleigh Heads, QLD 4220...
  • Page 2: Table Of Contents

    P a g e Table of Contents Introduction ..............................2 Key features ............................2 Safety Information for the Installer: ......................3 Important Safety Information ......................3 Assembly Precautions ........................3 Site Specific Precautions: ....................... 3 Installation Instructions ..........................4 Identification of Supplied Items ..................4 Footing Details ........................
  • Page 3: Introduction

    P a g e Introduction The most revolutionary throw cage design in 50 years; the Thor 9 hammer throw cage is a World Athletics certified (E-15-0822) cage and the smaller of two hammer cages certified for competition use by World Athletics that Playhard Sports Equipment, Australia, is fabricating. The cage has a three-pole erected structure that is structurally certified by engineers.
  • Page 4: Safety Information For The Installer

    P a g e Safety Information for the Installer: Important Safety Information • Read the Manual: Ensure you read this manual in full before beginning assembly or installation. • Supervision: Children should be supervised around the tower location during and after installation.
  • Page 5: Installation Instructions

    Please refer to the parts lists provided to check if you have received all the items required for the installation of the cage. Contact us immediately if any parts are missing. Fig: Thor 9 Packaged Item Lists 13 Alex Fisher Drive, Burleigh Heads, QLD 4220 (Australia)
  • Page 6: Footing Details

    P a g e B. Footing Details The details for the footing layout of the Thor 9 Hammer cage system are shown in the image below. Please ensure that you have the required number of footings as listed for the ease...
  • Page 7: Assembly Instructions

    P a g e C. Assembly Instructions 1. Place the ground sleeves and the anchors as shown in the footing details and let it set. 2. Once the ground sleeves are set, you can start the assembly of the cage. A.
  • Page 8 P a g e H. Use the winch to lift the hinged poles. Once the G. Ensure that all the joining pieces whole pole assembly is in an upright position, are properly bolted and ensure the holes at the base of the pole align together and fix them together with M20 x 60 mm Hex Bolt, Nut, and Washer.
  • Page 9: Rope Attachment

    P a g e D. Rope attachment Fig: Rope Details 13 Alex Fisher Drive, Burleigh Heads, QLD 4220 (Australia) Ph: 1300 851 518 | +61 7 5593 4494 Email: email@playhardsports.com.au | W: www.playhardsports.com.au...
  • Page 10 P a g e Fig: Rope Attachment 13 Alex Fisher Drive, Burleigh Heads, QLD 4220 (Australia) Ph: 1300 851 518 | +61 7 5593 4494 Email: email@playhardsports.com.au | W: www.playhardsports.com.au...
  • Page 11: Instructions To Attach Ropes

    P a g e | 10 E. Instructions to attach ropes: 1. Attach ‘D’ Shackles to the Net Support Rails (2 per Rails/ one each end). a. 2 x gate rails (3.2m) b. 1x rear rails (3.25m) c. 2 x adjacent to rear rails (2.85m) d.
  • Page 12: Operation

    P a g e | 11 Operation: The cage is quick and easy to operate. The gates are adjusted by pulling the colored rope on each gate pole. Unhook the net retaining ropes at the gate ground anchor and swing the gate by pulling the white braid blue fleck rope to either open or close the gate arm.
  • Page 13: Maintenance

    P a g e | 12 Maintenance 1. The net retaining ropes should always be tensioned to restrict the net from blowing. 2. Do not tie the net back to the poles. 3. Do not tie the gate back to increase the opening. 4.
  • Page 14: Certificate Of Compliance

    P a g e | 13 Certificate of Compliance: All our products have been structurally designed and are made using structural-grade steel. All the workmanship is completed following the relevant Australian Standards. Our Products comply with the following Australian Standards. 1.
  • Page 15: Warranty Certificate

    P a g e | 14 Warranty Certificate: When you purchase a Play Hard Sports Equipment product you have the peace of mind in knowing that your product is covered by Play Hard Sports Equipment’s manufacturer’s warranty against faulty workmanship and materials. The metal components of the product have a 10-year warranty against defective materials and workmanship.
  • Page 16: Maintenance Checklist

    P a g e | 15 Maintenance Checklist To make a warranty claim, maintain a record of the regular maintenance carried out and any defects noticed. While performing maintenance work ensure all the standard conditions are met, if not take necessary action. Non-compliance with the maintenance checklist may void the warranty on the product.

Table of Contents