Advertisement

Quick Links

FORTRESS
2/3/2025
HOCKEY GOALS
Installation, Operation &
Maintenance Manual
PLAY HARD SPORTS EQUIPMENT
13 Alex Fisher Drive
Burleigh Heads, QLD 4220

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Fortress Hockey Goals and is the answer not in the manual?

Questions and answers

Summary of Contents for PHS Fortress Hockey Goals

  • Page 1 FORTRESS 2/3/2025 HOCKEY GOALS Installation, Operation & Maintenance Manual PLAY HARD SPORTS EQUIPMENT 13 Alex Fisher Drive Burleigh Heads, QLD 4220...
  • Page 2: Table Of Contents

    P a g e Contents Introduction ..............................2 Product Details: ............................2 Certificate of Compliance: ..........................3 Installation Instructions: ..........................4 Operating Instructions ............................ 7 Maintenance: ..............................8 Safety Guidelines ............................8 Warranty Certificate: ............................9 13 Alex Fisher Drive, Burleigh Heads, QLD 4220 (Australia) Ph: 1300 851 518 | +61 7 5593 4494 Email: email@playhardsports.com.au...
  • Page 3: Introduction

    This manual provides detailed information on the installation, maintenance, usage, and warranty details of Fortress Hockey Goals supplied by Play Hard Sports Equipment Australia. Our Fortress Goals are designed for durability and performance, suitable for both amateur and professional use.
  • Page 4: Certificate Of Compliance

    Welding of aluminium structures 3. AS/NZS 2311:2017 Guide to the paintings of buildings The Fortress Hockey Goals meet the FIH regulation for field hockey. All our products are designed and manufactured here in Australia. 13 Alex Fisher Drive, Burleigh Heads, QLD 4220 (Australia)
  • Page 5: Installation Instructions

    P a g e Installation Instructions: 1. Unboxing the pallet: • The goals are flat packed in either a single pallet or 2 pallets. • Please read the instructions manual before commencing the assembly work. • Refer to the supplied packing lists and account for all the items listed in the packing list. •...
  • Page 6 P a g e 2. Assembling the frame: • Lay the two Side Frames upright and place the Weighted Back Panel at the Side Frames using M10 x 30mm S/S Hex Bolt and Spring Washer. • Then, Insert the Straight Joiner on top of the Side Frames and attach them using M10 x 30 mm S/S Hex Bolt and Spring Washer.
  • Page 7 P a g e 3. Attaching the net: 1. To attach the net, use the rods supplied to feed across the groove in the frame. – 1830 mm Back Panel and Cross Bar – 1145mm Side Panel – 840mm Upright Section 4.
  • Page 8: Operating Instructions

    P a g e Operating Instructions • Please refer to the instructions before moving the goals. • Moving the goal is a two-person operation. • The goal can be moved by tipping the goal backwards onto the two wheels at the rear of the backboard.
  • Page 9: Maintenance

    P a g e Maintenance: All our Goals are designed to require a minimal level of maintenance. However, it is advisable to • Regular Inspections: Check for any signs of wear or damage. Tighten bolts and replace nets or padding as needed. •...
  • Page 10: Warranty Certificate

    P a g e Warranty Certificate: When you purchase a Play Hard Sports Equipment product you have the peace of mind in knowing that your product is covered by Play Hard Sports Equipment’s 5-year manufacturer’s warranty against faulty workmanship and materials. The warranty covers damage or failure of the product during normal intended use.

Table of Contents