Avocent® MP1000
Management Platform
Quick Installation Guide
Rack Rail Installation
Management Platform Rack
Installation
1. Installing the rail assemblies
Determine the 1U space in the rack
where you will install the
management platform and ensure
the rack depth is sufficient.
NOTE: Each rail assembly is marked
with a label denoting the side of the
server cabinet on which it is to be
installed as well as which rail end is
considered the front.
Align the front upper and lower pins
of one of the rail assembly ends with
the corresponding 1U holes on the
rack upright. The latch tongue hook
will be aligned with the 1U's center
hole.
Push the pins into the upright holes
until the latch tongue hook clicks in
place.
NOTE: The pins are designed to work
with round or square upright holes.
For round upright holes, the first
PROPRIETARY AND CONFIDENTIAL ©2024 VERTIV GROUP CORP.
1
Upright
Extending the Inner Rail Sections
2
Rail pin
Latch tongue hook
2
590-2345-501E 1
Need help?
Do you have a question about the Avocent MP1000 and is the answer not in the manual?
Questions and answers