Page 1
User Manual Single Phase Hybrid All In One ESS FA5120-3K / FA10240-5K / FA15360-6K User Manual...
Page 2
About This Manual Change History The manual primarily encompasses product information, along with installation, operation, Changes between document issues are cumulative, meaning that each subsequent and maintenance guidelines. document issue includes all the changes made in earlier issues. It will refer to the device as the "ESS" unless otherwise specified. V1.0 (2023-09-15) Target Group This version is the first official release.
Page 4
User Manual User Manual flyfine flyfine 1 Safety Instructions Upon receiving the product, conduct a thorough inspection to verify the condition of the device's appearance and structural components. Additionally, compare the contents of the packaging with the ordered product to Before using please read all instructions and cautionary markings on the unit and this manual.
Page 5
User Manual User Manual flyfine flyfine Even if the ESS is shut down, it may still be hot and cause burns. Wear protective gloves before operating the DANGER ESS after it cools down. Batteries deliver electrical power and can cause burns or fire hazards when short-circuited or incorrectly installed.
Page 6
Model Description Depending on different power situations, this energy storage system is designed to generate The model description is follows (take FA5120-3K as an example): continuous power from PV solar modules (solar panels), battery, and the utility. When MPP All-in-one Energy Storage System,And Power level is 6kW input voltage of PV modules is within acceptable range (see specification for the details),...
Page 7
The following table shows the dimensions of the ESS 2.4.1 LED Panel The LED panel with a display screen and an indicator is on the front of the inverter Model W(mm) H(mm) D(mm) FA5120-3K 1008 FA10240-5K 1350 FA15360-6K 1692 2.3 Symbols on the Product...
Page 8
User Manual User Manual flyfine flyfine 2.5.2 BMS Comm. Address WARNING After all wiring installation is complete, set up ID for each battery module. The ID code for Please be aware that voltage may still be present in the AC side circuits even after the each battery module MUST be unique.
Page 9
User Manual User Manual flyfine flyfine 2.5.4 SOC Indicator & Status Indicator Guides BMS LED Status Mode: O: LED OFF Battery Status: F1:LED Flash1 F2:LED Flash2 F3:LED Flash3 L:LED Light SOC Indicator Alarm On/Off BMS LED flash and buzzer mode:...
Page 10
Scenario 1: PV power generation > Load power consumption: All in one ESS FA5120-3K / FA10240-5K / FA15360-6K - First,PV power is prioritized for the EPS loads first, followed by normal loads and then the battery. Metering device Meter cupboard with power distribution system.
Page 11
User Manual User Manual flyfine flyfine 3.2.1 Power Derating By combining the discharge capability of the battery and the EPS power from the grid, the system ensures reliable and continuous power supply during nighttime operations. Power derating is implemented as a protective measure to safeguard the ESS against potential overload or faults.
Page 12
User Manual User Manual flyfine flyfine The import power refers to the total power obtained from the grid, which encompasses the power used to charge the battery from the grid through the ESS, the power consumed by local loads, and the power supplied to loads connected to the ESS's EPS port from the grid.
Page 13
User Manual User Manual flyfine flyfine 4 Unpacking and Storage 4.2 Scope of Delivery Hybrid Inverter: 4.1 Unpacking and Inspection The product undergoes comprehensive testing and rigorous inspection prior to shipment. However, there is still a possibility of damage occurring during transit. Therefore, it is essential to conduct a thorough inspection upon receiving the product.
Page 14
User Manual User Manual flyfine flyfine Battery: RS485 PV1- PV1+ BAT- DRM-COM BAT+ PV2- PV2+ GRID LOAD GRID METER LOAD 12 13 4.3 Product Storage To ensure the proper storage of the ESS Product when it is not immediately installed, please adhere to the following guidelines: Store the ESS Product in its original packing case, ensuring the desiccant is kept inside.
Page 15
User Manual User Manual flyfine flyfine 5 Mechanical Mounting 5.2.1 Environment Requirements Ensure an installation environment free from flammable or explosive materials. Choose a location that is not accessible to children to ensure their safety. WARNING Ensure that the ambient temperature and relative humidity of the installation site meet the specified requirements.
Page 16
User Manual User Manual flyfine flyfine 5.3 Installation Tools 5.5 Installing the ESS Installation tools include but are not limited to the following recommended ones. If necessary, use other auxiliary tools on site. Note: This ESS should be installed battery modules first on the bottom and then inverter module on the top.
Page 17
User Manual User Manual flyfine flyfine Step 6: ESS installation: two people are required to lift the ESS, install it on the hanger and insert it with the battery pack output terminal. The left side of the ESS is fixed with the screw lock, and the right side is fixed with the connection plate lock:...
Page 18
User Manual User Manual flyfine flyfine 6 Electrical Connection 6.2 Utility Grid Connection 6.2.1. Preparation 6.1 Safety Instructions Before connecting to AC utility, please install a separate AC circuit breaker between surge protection device (SPD) and AC utility. This will ensure the ESS can be securely disconnected during maintenance DANGER and fully protected from over current of AC input.
Page 19
User Manual User Manual flyfine flyfine 6.3 PV Module (DC) Connection NOTICE 1. Before connecting to PV modules, please install separately DC circuit breakers between ESS and PV modules. 2. Please use 750VDC/30A circuit breaker. 3. The over-voltage category of the PV input is II.
Page 20
User Manual User Manual flyfine flyfine Prepare the cable and follow the connector assembly process: Step 5: ESS Communication Function: Strip one cable 8 mm on both end sides and be careful NOT to nick conductors. PV1- PV1+ DRM-COM PV2-...
Page 21
User Manual User Manual flyfine flyfine 7.3 Download App 7.5 Create a Plant If you are a residential user, please scan the QR code provided below to download the SOLARMAN Click "Add Now" to create your solar installation. Smart app. Alternatively, you can visit the website https://home.solarmanpv.com...
Page 22
User Manual User Manual flyfine flyfine 7.7 Network Configuration 7.8 Stick Logger Installation Step 1: Click on "Go to Configure" to access the network settings. Assemble the logger to the ESS communication interface according to the diagram provided. (Ensure that Bluetooth and WiFi are turned ON.) 7.9 Logger Status...
Page 23
User Manual User Manual flyfine flyfine 8 System Decommissioning (Note: Use the table below after the stick logger has been powered on for at least 2 minutes.) 8.1 Disconnecting the ESS READY Fault Description Fault Cause Solution Any state Slow flash Communicate with 1.
Page 24
Certain components of the ESS may pose a risk of environmental pollution. Please adhere to the disposal regulations for electronic waste that are applicable at your installation site when disposing of these components. Model FA5120-3K FA10240-5K FA15360-6K PV Input (DC) 8.1 Decommissioning the Battery...