Download Print this page
Eaton Newport Harbor Mate Installation Instructions
Eaton Newport Harbor Mate Installation Instructions

Eaton Newport Harbor Mate Installation Instructions

Advertisement

Quick Links

Installation Instructions for the Newport Harbor Mate
Rev. 5 3/23/2020
Hazardous voltage. Can cause severe in-
jury or death.
Turn off main power before opening panel.
Eaton Electrical Inc. strongly recommends that these
products be installed by a qualified electrician.
IMPORTANT - INSTALL EQUIPMENT IN CONFORMANCE
WITH CODES
This product must be installed in accordance with the National
Electric Code (NEC) or the Canadian Electrical Code (CEC0 and
any applicable local codes. Before installing equipment, check
with your local electrical inspector for requirements and infor-
mation. If you have questions or need assistance, contact a
qualified electrician.
Turn off or disconnect the power supplying this
equipment before beginning work.
This may require that you contact your electric utility to
disconnect power to an existing load-center. The line
side of the main breaker is energized unless power is
disconnected upstream. Eaton Electrical, Inc. will not
assume responsibility for property damage or personal
injury resulting from misuse of the information in this
publication.

Advertisement

loading
Need help?

Need help?

Do you have a question about the Newport Harbor Mate and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Eaton Newport Harbor Mate

  • Page 1 Installation Instructions for the Newport Harbor Mate Rev. 5 3/23/2020 Hazardous voltage. Can cause severe in- Eaton Electrical Inc. strongly recommends that these Turn off or disconnect the power supplying this jury or death. products be installed by a qualified electrician.
  • Page 2 Power can now be connected to the 1⁄4” stud In the cases where mechanical lugs buss bars. Eaton - Marina Power and Lighting produces instead of the stud-lug buss assembly are Note units that are designed to withstand the harsh...
  • Page 3 Eaton Corporation Our Quality Pledge Marina Power and Lighting Insert the proper end of the shore power cord Eaton is dedicated to developing and manu- into the boat’s power inlet connection, twist 149 Warwick Court facturing the highest quality products while...
  • Page 4 Buss Bar Assembly Mounting Plate Detail Telephone and Cable TV Assembly MPL-PG-011 Rev. 5 3/23/2020 NEWPORT HARBOR MATE www.marinapower.com 1-800-723-8009 Installation Guide #70-8629 Rev.3...