Chapter 2 Hardware Installation; Installation Scenarios; Figure 2-1 Attaching Rubber Feet; Desktop Installation Procedure - ZyXEL Communications Dimension GS-3012F User Manual

Gigabit ethernet switch
Hide thumbs Also See for Dimension GS-3012F:
Table of Contents

Advertisement

2.1 Installation Scenarios

The switch can be placed on a desktop or rack-mounted on a standard EIA rack. Use the rubber feet in a desktop
installation and the brackets in a rack-mounted installation.
For proper ventilation, allow at least 4 inches (10 cm) of clearance at the front and 3.4 inches (8
cm) at the back of the switch. This is especially important for enclosed rack installations.
2.1.1

Desktop Installation Procedure

Make sure the switch is clean and dry.
1.
Set the switch on a smooth, level surface strong enough to support the weight of the switch and the
2.
connected cables. Make sure there is a power outlet nearby.
Make sure there is enough clearance around the switch to allow air circulation and the attachment of cables
3.
and the power cord.
Remove the adhesive backing from the rubber feet.
4.
Attach the rubber feet to each corner on the bottom of the switch. These rubber feet help protect the switch
5.
from shock or vibration and ensure space between switches when stacking.
Do not block the ventilation holes. Leave space between switches when stacking.
Hardware Installation
Hardware Installation
This chapter shows two switch installation scenarios.

Figure 2-1 Attaching Rubber Feet

GS-3012F User's Guide
Chapter 2
2-1

Advertisement

Table of Contents
loading

Table of Contents