Download Print this page
AKG CS 5 Quick Start Manual
Hide thumbs Also See for CS 5:

Advertisement

Quick Links

CS 5 Conference System
Quick Start Guide
1. Place the CS 5 BU Base Unit, CS 5 VU Voting Stations, CS 5 DU Delegate Stations, CS 5 IU
Interpreter Stations (if any), and CS 5 IRT 1 or CS 5 IRT 2 Infrared Radiators at their intended
locations.
Screw the microphone capsules on the goosenecks.
Connect the microphones to the microphone inputs on the microphone stations.
2. Make all audio, system bus, and infrared connections.
Use the supplied system cables to wire the system bus (if you use your own CAT5 cables take care that they
are SHIELDED – please understand that AKG takes responsibility only for AKG cables):
Connect the "ring" to the system connectors on the rear of the CS5BU and daisy chain all stations.
Use no cables that are longer than 330 feet (100 m) to connect one microphone station to another.
Make sure to connect the last microphone station in the chain to the unused SYSTEM connector on
the Base Unit rear panel.
AKG Acoustics GmbH A-1230 Wien, Lemböckgasse 21-25,
Tel.: +43-1-866 54-0, Fax: +43-1-866 54-8800
www.akg.com

Advertisement

loading

Summary of Contents for AKG CS 5

  • Page 1 Use the supplied system cables to wire the system bus (if you use your own CAT5 cables take care that they are SHIELDED – please understand that AKG takes responsibility only for AKG cables): Connect the “ring” to the system connectors on the rear of the CS5BU and daisy chain all stations.
  • Page 2 Please download the manual from our home page www.akg.com more details. If you would like to share your experience with us please write to us under: thomas.giczy@harman.com AKG Acoustics GmbH A-1230 Wien, Lemböckgasse 21-25, Tel.: +43-1-866 54-0, Fax: +43-1-866 54-8800 www.akg.com...