Download Print this page

AT&T Bell System Plant Series Adjustment Procedure page 13

Hide thumbs Also See for Bell System Plant Series:

Advertisement

_:,__
REVERSE (REAR)
I
LOOP SENSE
VACUUM
CHAMBER
-
SUPPLY
()
TAKE-UP
VACUUM
CHAMBER
Fig. 9-Vacuum
Chambers-Shown
with
Chamber
Area Overlay
Plate
Removed
ISS 1, SECTION
034-368-701
(2)
Install
a reel of magnetic
tape and stop the
tape with the BOT marker
positioned
airay
from the photosense
head ( Fig. :3).
(3) Adjust
potentiometer
1-{;3
(
Fig. G) on the
photosense and interlock printed
cireuit
board
PIB.
Adjust R:3 until the
\'Oltmeter
indieates
a
trans1t1on
from a high
state
(
+
12
volts)
to a
low
state
(0 volts).
(.J)
l\Iove the
tape
until
the
BOT
marker
is
beneath
the photosense
head.
Counting
the
number
of
turns, adjust R3 in
a countercloekv\'ise
direction until the
voltmeter
indicates
a
transition
from a low
state
(0
volts)
to
a
high
state
(
+
12
volts).
The potentiometer
adjustment
should
require
approximately
three
turns
before
the
transition
occurs.
(5) Readjust
R:-3 in
a clockwise
direction
halfwa.,·
back to the transition
point
of
(:3).
(6) Connect the voltmeter to TPl-21 using TP2-:35
as the 0-volt reference.
Repeat the proeedure
in
(2),
(:3),
(4), and
{:)), adjusting
potentiometer
R21
on
printed
circuit
board
PIB
and
plaeing
the
EOT marker
under
the
photosense
head
during
(--1).
Page
13
13 Pages

Advertisement

loading
Need help?

Need help?

Do you have a question about the Bell System Plant Series and is the answer not in the manual?

This manual is also suitable for:

Bell system ks-19829