Download Print this page
GEIGER One RightON SITE ROS-GRW Installation Principles

GEIGER One RightON SITE ROS-GRW Installation Principles

Wall frame

Advertisement

Quick Links

Advertisement

loading
Need help?

Need help?

Do you have a question about the One RightON SITE ROS-GRW and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GEIGER One RightON SITE ROS-GRW

  • Page 2 Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Wall Frames 1. Working sequentially per installation drawings, insert double ended bolt (1BG8JW) into cams (1BG8JY) on frame Slide frame 2 onto bolt from frame 1.
  • Page 3 Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attaching Wall Frames to Building Wall 1.
  • Page 4 Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. If Applicable, Attach Vertical Storage at Wall End(s) 1.
  • Page 5 Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Adding Light Jumper Cables (if applicable) Run light cord jumper(s) vertically inside the wall frame groove, leaving a few inches of cable above highest bracket cutout.
  • Page 6 Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attaching Mounting Clips to Wall Frames 1.
  • Page 7 Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attaching Tiles 1. Working from bottom up and left to right or right to left, lift tiles and overheads onto wall frame Z-clips.
  • Page 8 Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attaching Mounting Clips to Wall Frames 1.
  • Page 9 Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach leg plate to underside of fixed height or sdjustable height legs. Insert leg through grommet in utility cabinet or through grommet in pedestal top cap.
  • Page 11 Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Fixed Height or Adjustable Height Leg in Low Storage...
  • Page 18 Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Height Adjustable Electronic Set-Up To connect power to the height adjustable legs: Runoff Desk - Attach legs to the control box.
  • Page 19: Programming Remote Control

    Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Connect Optional Task Light Connect the LED light cord that exits through shelf and wall panel and down wall to the power supply. Up to 6 light cords and a total of 16 feet of lighting can be powered by 1 power supply.
  • Page 20: Operating Remote Control

    Geiger One Installation Principles Ri ght O N SI TE ROS-GRW Geiger One Wall Frame Installation 1BRR0T Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Programming Remote Control (continued) To program multiple power supplies to work with a single remote, briefly press the button of all power supplies that you want to program.

This manual is also suitable for:

Ros-grw