Download Print this page

Advertisement

Quick Links

Geiger Rhythm
Right
Installation Principles
ON SITE
ROS-GRW Geiger Rhythm Wall
1BGRZ3
Note: Details apply, however the actual configuration of your product may vary from what is depicted here.
Tools Required
o Installation drawing of product layout
o Cordless drill
o #1, #2 & #3 Philips and Robertson Drill bits
o Level
o Measuring Tape
Page 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the Rhythm ROS-GRW and is the answer not in the manual?

Questions and answers

Summary of Contents for GEIGER Rhythm ROS-GRW

  • Page 1 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Tools Required o Installation drawing of product layout o Cordless drill o #1, #2 &...
  • Page 2 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Coat Cabinet to Wall Frame Connection 1. Attach (2x) coat to frame bracket (1BGP3K) to side wall of coat cabinet through pliot holes, using (8x) #8 x 1"...
  • Page 3: Installation Principles

    Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Wall Frame to Wall Frame Connection 1. Place frame connectors (1BGP3D) inside wall frame channel, aligning holes in wall frame with holes in connector.
  • Page 4 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Wall Frame to Building Wall Connection 1. Loosely attach stabilizer bracket (1BGCWX) to underside, top center of wall frame with 1/4-20 x 5/8" pan head machine screw (1BDV5L) through threaded nut so that the bracket can still move as required.
  • Page 5 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Wall Frame LED Light Strips (optional, check your installation drawings). 1. Feed supply cable(s) down along end of wall frame and snake through the hole in the face of the frame back to the interior of the wall frame.
  • Page 6 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Tiles 1. Attach hooks to tiles through pilot holes provided. TV tile and metal tiles will already have hooks attached.
  • Page 7 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. End Caps and Top Caps 1. Press top caps over wall frames. Top caps are the same length as the wall frames except when there is an adjacent end cap where they are slightly shorter.
  • Page 8 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Containers 1. For installations with height adjustable desks and credenzas, install height adjustable legs prior to interconnecting containers.
  • Page 9 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Containers - Interconnect 2. For wall frame installations, first interconnect storage components that will make up each frame width, otherwise interconnect storage to storage in sequence.
  • Page 10 Geiger Rhythm Right Installation Principles ON SITE ROS-GRW Geiger Rhythm Wall 1BGRZ3 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Connect Optional Task Light Mate LED Dimmer Receiver to Remote Control. See instructions below.
  • Page 11 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Table Desk 1BGRZ4 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Tools Required o Installation drawing of product layout o Cordless drill o #2 &...
  • Page 12 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Table Desk 1BGRZ4 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Two Sets Of Legs 1. Fasten wood leg to foot (1BGCWV) using (4x) using 1/4-20 x 1-1/4" Flanged Socket Cap Screws (1BGP3T).
  • Page 13 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Table Desk 1BGRZ4 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Frame And Attach To Top 1. On a protected surface, lay table top onto surface with underside of top facing up.
  • Page 14 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Tools Required o Installation drawing of product layout o Cordless drill o #2 &...
  • Page 15 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Outer Leg 1. Fasten wood leg to foot (1BGCWV) using (4x) using 1/4-20 x 1-1/4" Flanged Socket Cap Screws (1BGP3T).
  • Page 16 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Inner Leg 1. Fasten bracket (1BGP34) to frame (1BGCVV) using (4x) 1/4-20 x 5/8" button flange head machine screw (1BGP3B) through lock washer (1BC54H).
  • Page 17 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Frame 1. Insert C channels into inner frame assembly.
  • Page 18 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Lid Bracket and Power Well 1. If specified, attach simplex or dual USB component to power well. Drop component with cable down into round hole in power well, slide plastic nut over cable and tighten to power well.
  • Page 19 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Top 1. Lift desk top onto frame, centering top on frame assembly and offset from end by 3" as shown.
  • Page 20 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Lid Assembly 1. Peel double face tape protection from lower cup and press lower cup onto lid bracket, aligning pins on lower cup with holes on lid bracket.
  • Page 21 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Fixed Height Runoff Desk 1BGRZ5 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Monitor Arm Preparation 1. Screw M12 x 45mm threaded rod roughly half way down into bracket.
  • Page 22 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Tools Required o Installation drawing of product layout o Cordless drill o #2 &...
  • Page 23 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Outer Leg 1. Fasten offset brackets(1BGCWR & 1BGCWP) to height adjustable leg using (4x) lock washer and 1/4-20 x 5/8"...
  • Page 24 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Inner Leg 1. Fasten brackets (1BGP33 & 1BGCWR) to height adjustable leg using (4x) 1/4-20 x 5/8" button flange head machine screw (1BGP3B) through lock washer (1BC54H).
  • Page 25 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Inner Leg 1. Press fit height adjustable leg / frame assembly all the way through container column.
  • Page 26 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Frame 1. Insert C channels into inner frame assembly.
  • Page 27 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Lid Bracket and Power Well 1. If specified, attach simplex or dual USB component to power well. Drop component with cable down into round hole in power well, slide plastic nut over cable and tighten to power well.
  • Page 28 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Top and Power Unit 1. Lift desk top onto frame, centering top on frame assembly and offset from end by 3" as shown.
  • Page 29 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Lid Assembly 1. Peel double face tape protection from lower cup and press lower cup onto lid bracket, aligning pins on lower cup with holes on lid bracket.
  • Page 30 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Runoff Desk 1BGRZ6 Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Monitor Arm Preparation 1. Screw M12 x 45mm threaded rod roughly half way down into bracket.
  • Page 31 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Tools Required o Installation drawing of product layout o Cordless drill o #2 &...
  • Page 32 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Frames 1. Fasten brackets 1BGCWT and 1BGCWS to height adjustable legs using (4x) 1/4-20 x 5/8" button flange head machine screw (1BGP3B) through lock washer (1BC54H).
  • Page 33 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Shroud 1. Fasten left shroud (1BGP46) to left frame assembly using (4x) 1/4-20 x 5/8" pan head machine screws (1BGP3R).
  • Page 34 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Technical Containers 1. Press fit height adjustable leg / frame assembly all the way through container column.
  • Page 35 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Assemble Frame 1. Insert C channels into one of the frame assemblies.
  • Page 36 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Top and Power Unit 1. Lift desk top onto frame, centering top on frame assembly and offset fas shown.
  • Page 37 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Lid Bracket and Power Well 1. If specified, attach simplex or dual USB component to power well. Drop component with cable down into round hole in power well, slide plastic nut over cable and tighten to power well.
  • Page 38 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Top and Power Unit 1. Lift desk top onto frame, centering top on frame assembly and offset fas shown.
  • Page 39 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Lid Assembly 1. Peel double face tape protection from lower cup and press lower cup onto lid bracket, aligning pins on lower cup with holes on lid bracket.
  • Page 40 Geiger Rhythm Right Installation Principles ON SITE Geiger Rhythm Adjustable Height Credenza 1BHFPF Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Monitor Arm Preparation 1. Screw M12 x 45mm threaded rod roughly half way down into bracket.
  • Page 41 Geiger Rhythm Right Installation Principles ON SITE ROS-GRS Geiger Rhythm Storage 1BHFPG Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Tools Required o Installation drawing of product layout o Cordless drill o #1, #2 &...
  • Page 42 Geiger Rhythm Right Installation Principles ON SITE ROS-GRS Geiger Rhythm Storage 1BHFPG Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Power Modules and Phone Charger Guest Containers Personal Containers Remove top and bottom shelves. Feed plug cable Feed plug cable out of container towards power out of container towards power source.
  • Page 43 Geiger Rhythm Right Installation Principles ON SITE ROS-GRS Geiger Rhythm Storage 1BHFPG Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Interconnect containers and level Interconnect storage units through 1/4" end panel holes provided.
  • Page 44 Geiger Rhythm Right Installation Principles ON SITE ROS-GRS Geiger Rhythm Storage 1BHFPG Note: Details apply, however the actual configuration of your product may vary from what is depicted here. Attach Power Module Covers and Storage Tops Power Module Covers Angle power module cover slightly towards back, press and snap down.