DCS -DRH48N Use And Care Manual And Installation Instructions page 8

Professional del rey heater
Hide thumbs Also See for DCS-DRH48N:
Table of Contents

Advertisement

CLEARANCES
0
0
& 30
0
INSTALLATION (MINIMUM CLEARANCES TO COMBUSTIBLE MATERIAL).
Heater Mounting
Body Assy.
18"
min
0
0
INSTALLATION (MINIMUM CLEARANCES TO NON-COMBUSTIBLE MATERIAL).
Utilize 2
bolts (min)
per bracket.
Make sure heater is level
(see warning on page 9)
Front View
Wall
(Combustible
Surface)
48"
SIDE VIEW
96"
min.
FLOOR
7
Wall
(Combustible
Surface)
18"
min
Four Bolts
Per Bracket
Non Combustible
Surface
Gas Pipe
(installer supplied)
Gas Shut-off
Valve
(installer supplied)
1/2" Conduit
(installer supplied)
Drip Leg

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents

Save PDF