CLEARANCES/INSTALLATION SPECIFICATIONS
0
0
INSTALLATION
MINIMUM CLEARANCES TO COMBUSTIBLE MATERIAL.
14"
(MIN)
Utilize 2
bolts (min)
per bracket.
10-1/4"
96"
(MIN)
Side View
Gas Pipe
Gas Shut-off
(installer supplied)
Valve
(installer supplied)
1/2" Conduit
(installer supplied)
Utilize 2
bolts (min)
Drip Leg
per bracket.
7-3/4"
21"
(MIN)
FLOOR
5
Combustible
Surface
Four Bolts Two
On Each Side
(installer supplied)