SATA AE5005 User Manual

4t 2 post lift base plate

Advertisement

Quick Links

4 吨手动双边解锁双柱举升机
4T 2 Post Lift Base Plate
AE5005/AE5005-3
使用说明书 \ User's Manual
中文
EN

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the AE5005 and is the answer not in the manual?

Questions and answers

Summary of Contents for SATA AE5005

  • Page 1 4 吨手动双边解锁双柱举升机 4T 2 Post Lift Base Plate AE5005/AE5005-3 使用说明书 \ User’s Manual 中文...
  • Page 3: Table Of Contents

    中文 AE5005/AE5005-3 目 录 第一章 安全注意事项 ............................4 第二章 产品特性和参数 .............................5 第三章 安装准备 ..............................8 第四章 安装指导 ..............................9 第五章 保养指导 ..............................15 第六章 常见问题 ..............................15 第七章 液压系统图及部件清单 ........................16 第八章 电气原理图 ...............................17 第九章 产品爆炸图 .............................. 18 Chapter Ⅰ Safety Precautions ..........................22 Chapter Ⅱ Product Features and Parameters ....................23 Chapter Ⅲ...
  • Page 4: 第一章 安全注意事项

    中文 AE5005/AE5005-3 第一章 安全注意事项 - 当您使用举升机时,必须保证您已经完全阅读了此说明书,包括安装,操作,安全等相关内容。 - 发现举升机有任何异常问题,停止使用。 - 不要超载使用举升机,本产品额定负载 4000KG. - 当车辆准备开往上车位置前,先将四个托臂摆开,保证车辆通道没有任何障碍,不要用脚踹托臂, 这样会损坏托臂齿。 - 只有接受过培训的人才可以操作举升机,禁止让汽车客户或者没有操作经验的人随意操作举升机。 - 举升机托臂的橡胶托盘必须与车辆的支撑点接触,否则会损坏车辆底盘。(不清楚支撑点位置的情 况下,建议电话咨询车辆生产厂家) - 举升车辆前,必须确保所有托臂齿成功啮合。 - 必须使用 4 个托臂同时举升汽车,禁止使用少于 4 个托臂举升汽车。 - 当举升完汽车后,必须执行机械落锁动作,禁止在没有机械落锁的情况下,在车辆下方工作。 - 当需要拆装汽车部件或者需要前后推动车辆时,车辆重心会偏离,为了保证安全,需要使用四个独 立的支架来加强车辆稳定性。 - 举升机周边必须干净,整洁,任何油污等障碍物都是安全隐患。 - 禁止在车内有人员的情况下将车辆举起。 - 下降车辆前,确保下方没有任何障碍物,主、副立柱的保险都已打开。 - 车辆驶出举升机前,先将托臂摆回初始位置,确保不会与车辆干涉。...
  • Page 5: 第二章 产品特性和参数

    中文 AE5005/AE5005-3 第二章 产品特性和参数 2. 1 产品特点 - 二节托臂设计,适应车型广泛 - 双边手动解锁,安全可靠 - 托盘高度螺纹调节,可调高度 40mm - 最低举升高度 110mm,适应低底盘汽车 2.2 产品技术参数: 额定举升重量 4000KG 立柱内宽 2800mm 整机高度 2824mm 举升最低高度 110mm 托盘调节高度 40mm 举升最高高度 1800mm 二节短托臂伸缩范围 720mm-1050mm 二节长托臂伸缩范围 820mm-1225mm 1PH,220VAC,2.2KW, 铁壳电机 电源 AE5005 3PH,380VAC,2.2KW, 铁壳电机...
  • Page 6 中文 AE5005/AE5005-3 产品示意图(单位:mm)...
  • Page 7 中文 AE5005/AE5005-3 主要部件简介: - 本机主要由主立柱, 副立柱, 滑台, 托臂, 锁臂装置, 托臂锁, 机械锁, 油缸, 动力单元, 龙门架等组成。 (看下图) 立柱:基础部件,用于安装滑台,油缸等驱动装置 滑台:举升部件,装在立柱内,上下滑动 托臂:举升部件,与滑台安装在一起,与汽车支撑点接触,举升汽车 锁臂装置:安全部件,锁止托臂,使其无法转动 保险锁:安全部件,油压泄油,保险块上顶保险条,滑台静止 油缸:传动部件,液压站工作,将高压油打入油缸下腔,活塞杆上升,通过链条带动滑台上升 链条:传动部件,液压站工作,将高压油打入油缸下腔,活塞杆上升,通过链条带动滑台上升 动力单元:动力部件,电机工作,带动泵工作,通过过滤网吸油,推出高压油 底梁:过桥部件,平衡钢丝绳,油管,保险绳通过龙门架从主立柱到副立柱...
  • Page 8: 第三章 安装准备

    中文 AE5005/AE5005-3 第三章 安装准备 3.1 拆卸包装 - 将包装箱拆开,去掉周围的包装材料,检查机器有无在运输中受损,对照装箱单检查主、配物件是 否齐全。将包装材料远离儿童放置,以免造成危险;若包装材料会造成污染,应将其妥善处理。 3.2 地基 - 用户有责任确保地基的稳固,混凝土的最小厚度为 500mm,最小强度为 21MPa,混凝土必须在安装日 15 天之前完成。与膨胀螺栓相距 350mm 内不允许有其它任何地基设备以免破坏地基强度。用户有责 任提供安全的电源,气源,以及电源连接线等连通部件。 注意 : - 以总长度 3385mm,宽 520mm 为基准,在混凝土板上面画一长方形,误差要在 3mm 之内。分别以两 对角画两条对角线保证对角线误差要在 3mm 之内。所有的尺寸都以底板的外边界为基准,确保总体 误差控制在 6mm 之内,这样就能消除在最后组装中出现的困难,或者链条过早磨损或不对齐。画线 布局是非常重要的,如果不准确,在最后装配和操作中将会出现问题。 膨胀螺栓固定孔位图工具...
  • Page 9: 第四章 安装指导

    中文 AE5005/AE5005-3 - 5m 卷尺 - 4m 高扶梯 - 石粉笔 - 合适的螺丝刀 - 合适的冲击钻和钻头(膨胀螺栓 M18X160mm) - 100mmx100mm 的木砌(用于平放立柱,保护 油漆表面) - 锤子 - 合适的扳手 - 1.2m 的水平尺 - 撬棍 第四章 安装指导 - 首先选择好要安装的区域,尽量靠墙,离电源近的地方 - 清理干净安装举升机区域,地面不可以有任何油污 - 产品安装空间尺寸图供参考...
  • Page 10 中文 AE5005/AE5005-3 空间示意图:...
  • Page 11 中文 AE5005/AE5005-3 - 将主立柱放置好,用冲击钻打孔,将螺栓孔内残余的灰尘用吸尘器清理干净,用锤子将膨胀螺栓敲 入孔内,膨胀 螺栓露出地面高度不可大于 50mm, 螺母不要拧紧。 - 将副立柱固定,方法参照主立柱,同时确认两立柱底板对角线距离差在 3mm 以内。 - 两边立柱各准备好扶梯推车,用吊带拴好龙门架两边,将龙门架吊起,固定好连接螺栓。 注意:安装龙门架时,举升机周围不可以有其他人员。 - 拧紧膨胀螺栓(参考扭力 203N.m),同时用水平尺确认立柱的垂直,如有必要,用垫片塞入立柱底部, 调整水平,龙门架上表面也用水平尺确保水平。 注意:如果拧紧膨胀螺栓的时候无法达到 203N.m,应该重新确认混凝土的强度。...
  • Page 12 中文 AE5005/AE5005-3 - 安装平衡钢丝绳 保证左右两边滑台在第一档保险处,将平衡钢丝绳按图示轨迹安装好。先不要拧紧螺母,等调试同 步性的时候,再调整两根钢丝绳的松紧。注意:单边钢丝绳螺杆必须拧紧,调节时必须确保两边滑 台锁在同一高度的锁上。...
  • Page 13 中文 AE5005/AE5005-3 - 机械锁检查 检查机械锁在运行过程中是否能很好地落锁、解锁。通过拧动内六角圆柱头螺钉进行调整,如下图 所示,以防机械锁不能正常工作。(如果机械锁无法解锁,顺时针拧紧,顺时针拧紧,以防机械锁 无法接合。) - 托臂安装 通过销轴将四个托臂装入滑台,前端用二节短臂,后端用二节长臂。 (注意:车头方向使用二节短臂, 每个托臂轴需要装好卡簧)...
  • Page 14 中文 AE5005/AE5005-3 - 动力单元装配 将动力单元安装于主立柱电机板上,用螺栓螺母固定。安装好限位开关,连接电线。 - 液压系统连接 a. 拧开油箱盖,倒入 10L---46# 抗磨液压油。(首选 46# 抗磨液压油,温度 -10° C 以下,考虑 32#) b. 连接好液压接头,将油管连接于主副油缸出油口接头处。 - 空载测试调整 a. 清理场地,地面不可以有油污,举升机空载。 b. 接通电源,按上升按钮,滑台上升,任意位置停止上升,按回油手柄,将左右滑台落入同档保险 c. 拧紧平衡钢丝绳螺母,使两根平衡钢丝绳松紧度基本一致。 d. 按上升按钮,使滑台上升一段距离,脱离保险,左手拉保险手柄,右手按回油手柄使滑台下降到 最低处。 e. 按上升按钮,全程举升,任意位置触动限位开关,电机停止运转,达到极限位置时溢流阀打开, 液压系统回油,滑台停止上升,举升过程观察左右滑台托臂同步性,如果有明显差异,继续调整 平衡钢丝绳螺母松紧达到左右滑台同步性。 f. 安装车门防撞橡胶垫。 - 负载测试调整 a. 将四个托臂完全打开,确保车道空间无任何障碍。...
  • Page 15: 第五章 保养指导

    中文 AE5005/AE5005-3 第五章 保养指导 - 每日检查项目 检查所有液压接头,油管,油缸是否存在漏油。 检查所有电气连接线是否有破损。 检查所有运动部件是否有过劳磨损。 清理橡胶托盘上的油污,观察橡胶托盘是否有过渡磨损。 - 每 2 个月检查项目 更换立柱滑道内的润滑脂 更换托臂销轴的润滑脂 检查并锁紧膨胀螺栓螺母 - 每 6 个月检查项目 更换链条钢丝绳润滑脂 调节平衡钢丝绳,保险绳 检查钢丝绳是否有毛刺 - 每 2 年检查项目 更换液压油 第六章 常见问题 序号 常见问题 解决方案 按钮无法工作 更换按钮 接触器通电不吸合 更换接触器 接触器无法得电吸合 检查按钮与限位开关...
  • Page 16: 第七章 液压系统图及部件清单

    中文 AE5005/AE5005-3 第七章 液压系统图、油管接法图...
  • Page 17: 第八章 电气原理图

    中文 AE5005/AE5005-3 第八章 电气原理图 电源引入电机上的接触器进入端,并根据电器原理图与控制线相连,有限位开关的举升机还需要连接 限位开关。连接电源需根据所购电机进行引入电源,必须依照当地或相关国家有关规定安装,并符合 有关国家和地区的法律法规。 接线说明: - 单相 220V 电机使用三线制铜芯电缆线(火、 零、 接地)线径 ≥4 平方毫米,电缆线长度不超过 5 米 - 三相 380V 电机使用四线制铜芯电缆线(火、 火、 火、 接地)线径 ≥2.5 平方毫米,电缆线长度不超 过 5 米 - 电机上的电源线是调试引导线,正式安装时,请将电源线直接接入交流接触器 - 外部电源线需要直接接入空开(空开规格 C63),不要用插座接线 注意:拆下液压站上电气盒的封盖并按电路图连线,要求举升机旁装有电源开关,以便维修和应急时 切断电源。由于错误连线而导致的电机损坏不在质保范围之内。与电气连接有关的问题请与厂家联系。 确保油箱里有油,不要在无油状态下运行液压站。按上升按钮测试,如果马达未运行,或发生不正常 的噪音及发热,此时应马上停机并检查电气连接是否正确。...
  • Page 18: 第九章 产品爆炸图

    中文 AE5005/AE5005-3 第九章 爆炸图...
  • Page 19 中文 AE5005/AE5005-3 序号 世达编号 名称 序号 世达编号 名称 主立柱焊接 长油管组件 2825 PAE5005-01 PAE5005-10 副立柱焊接 油缸油管组件 1220 PAE5005-02 PAE5105-82 绳轮 108 油缸短接头 3/8-M14*1.5*35 PAE5105-03 PAE5005-11 接套支架 泵站螺钉接头 PAE5105-12 PAE5105-78 检视孔盖板 直角接头 PAE5105-08 PAE5005-12 绳轮挡片 泵站直接头 55 PAE5105-04 PAE5105-76 绳轮垫圈 顶板焊接 PAE5105-06 PAE5005-13 自润滑轴承...
  • Page 20 中文 AE5005/AE5005-3...
  • Page 21 中文 AE5005/AE5005-3 序号 世达编号 名称 序号 世达编号 名称 2.2Kw 电机(380V) 回油管 PAE5105-92 PAE5105-106 2.2Kw 电机(220V) 缓冲阀 PAE5105-93 PAE5105-107 联轴器 节流杆 PAE5105-94 PAE5105-108 堵头 手动下降阀 PAE5105-95 PAE5105-109 溢流阀 下降阀手柄 PAE5105-96 PAE5105-110 中间阀块 单向阀 PAE5105-97 PAE5105-111 油箱密封圈 电机盒带按钮(380V) PAE5105-98 PAE5105-112 电机固定螺栓 电机盒带按钮(220V)...
  • Page 22: Chapter Ⅰ Safety Precautions

    中文 AE5005/AE5005-3 Chapter I Safety Precautions - Make sure that you have read the User's Manual completely including relevant instructions on installation, operation and safety before operating the lift. - Do not use the lift if any abnormality is found in the lift.
  • Page 23: Chapter Ⅱ Product Features And Parameters

    中文 AE5005/AE5005-3 Chapter II Product Features and Parameters 2. 1 Product Features: - Three sections of bracket arms, suitable for a wide range of models - Unilateral manual unlocking, safe and reliable - Tray height adjusted by thread, with the adjustable height of 40mm - Minimum lifting height of 110mm, suitable for low riders 2.2 Technical parameters:...
  • Page 24 中文 AE5005/AE5005-3 Diagram of product (unit: mm)
  • Page 25 中文 AE5005/AE5005-3 2.3 Description of main components xPost: Basic component, carrying sliding table, cylinder and other drive devices Bracket arm: Lifting component, installed together with the sliding table, having contact with the support point of the vehicle to lift the vehicle Arm lock: Safety component, locking the bracket arm to prevent it from rotation Mechanical safety lock: Safety component.
  • Page 26: Chapter Ⅲ Preparation For Installation

    中文 AE5005/AE5005-3 Chapter III Preparation for Installation 3.1 Unpacking - Open the packing case, remove the surrounding packing materials, inspect the machine for damage during transportation, and inspect the main components and accessories for completeness as per the packing list. Keep packing materials away from children so as not to pose any danger, and properly dispose them if they may cause pollution.
  • Page 27 中文 AE5005/AE5005-3 3.3 Tools a. 5m tape b. Chalk c. Proper impact drill and bit (expansion bolt M18X160mm) d. Hammer e. Proper wrench f. 1.2m spirit level g. Crowbar h. 4m ladder i. Proper screwdriver j. 100mmx100mm woodwork (for laying the post flat to protect the paint surface)
  • Page 28: Chapter Ⅳ Installation Instructions

    中文 AE5005/AE5005-3 Chapter IV Installation Instructions - Determine the mounting position, which shall be close to wall and power as much as possible. - Thoroughly clean the mounting position of the lift, which shall be free from oil stains. - The dimension diagram of mounting space of the product is given below for reference only.
  • Page 29 中文 AE5005/AE5005-3 Schematic diagram...
  • Page 30 中文 AE5005/AE5005-3 - Properly position the main post, drill holes with the impact drill, remove the dust in the bolt hole with a vacuum cleaner, and hammer the expansion bolt into the hole. The length of the expansion bolt protruding from the ground shall not exceed 50mm, and the nut shall not be tightened.
  • Page 31 中文 AE5005/AE5005-3 - Installation of balance wire rope Make sure that the left and right sliding tables are at the first safety position, and then install the balance wire rope as per the track shown in the figure. Do not tighten the nut temporarily as the tension of two wire ropes will be adjusted for synchronization later on.
  • Page 32 中文 AE5005/AE5005-3 - Installation of bracket arm Install four bracket arms into the sliding table through the pin, with two-section short straight arms at the front end and two-section long straight arms at the back end. (Note: The two-section short straight arms shall be installed at the front end and each arm is required to be installed with a circlip.)
  • Page 33: Chapter Ⅴ Maintenance Instructions

    中文 AE5005/AE5005-3 f. Press the UP button to lift the vehicle slowly until all tires are off the ground. Gently push the rear of the vehicle to check that the vehicle is fixed firmly and the bracket arm locks are completely engaged.
  • Page 34: Chapter Ⅵ Common Faults

    中文 AE5005/AE5005-3 Chapter VI Common Faults S/N Common Faults Solution Button fails to work Replace the button Contactor fails to operate after energization Replace the contactor The contactor fails to be energized and Inspect the button and limit switch operate...
  • Page 35: Chapter Ⅶ Hydraulic System Diagram And Oil Pipe Routing Diagram

    中文 AE5005/AE5005-3 Chapter VII Hydraulic System Diagram and Oil Pipe Routing Diagram...
  • Page 36: Chapter Ⅷ Electrical Schematic Diagram

    中文 AE5005/AE5005-3 Chapter VIII Electrical Schematic Diagram The power supply is introduced into the contactor entry terminal on the motor and connected to the control line according to the electrical schematic, and the lift of the finite switch also needs to be connected to the limit switch.
  • Page 37: Chapter Ⅸ Exploded Views

    中文 AE5005/AE5005-3 Chapter IX Exploded Views...
  • Page 38 中文 AE5005/AE5005-3 Part No. Name Part No. Name PAE5005-01 Main column welding PAE5005-10 Pattern plate Tubing Assembly 2825 PAE5005-02 Secondary column welding PAE5105-82 Tuning 1220 PAE5105-03 Rope wheel 108 PAE5005-11 Cylinder short joint 3/8-M14*1.5*35 PAE5105-12 Socket bracket PAE5105-78 Joint PAE5105-08...
  • Page 39 中文 AE5005/AE5005-3...
  • Page 40 中文 AE5005/AE5005-3 Part No. Name PAE5105-92 2.2Kw Motor (380V) PAE5105-93 2.2Kw Motor (220V) PAE5105-94 Coupling PAE5105-95 Plugs PAE5105-96 Relief valve PAE5105-97 Intermediate valve block PAE5105-98 Tank seals PAE5105-99 Motor fixing bolts PAE5105-100 Gear pumps PAE5105-101 Gear pump fixing bolts PAE5105-102...
  • Page 41 中文 AE5005/AE5005-3 Date...
  • Page 42 AE5005/AE5005-3 版本号 / Version No: V-AE-5005-202206 世达汽车科技(上海)有限公司 SATA Automotive Technology (Shanghai) Co., Ltd 客户服务:上海市嘉定区南翔镇静唐路 988 号 5-12 幢 Customer service: Building 5-12, No. 988, Jingtang Road, Nanxiang Town, Jiading District, Shanghai 邮编 / Post: 201802 电话 / Tel.: (86 21) 6061 1919...

This manual is also suitable for:

Ae5005-3

Table of Contents