Moebelix SU-PS57-XD-V2 Owner's Manual

Metal garden shed

Advertisement

Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Requires two people and takes 1.5-2 hours for lnstallation.
Quick & Easy Assembly
Ridge Reinforced Walls
Available in Various Sizes
SU-PS57-XD-V2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SU-PS57-XD-V2 and is the answer not in the manual?

Questions and answers

Summary of Contents for Moebelix SU-PS57-XD-V2

  • Page 1 Metal Garden Shed OWNER'S MANUAL Instructions for Assembly SU-PS57-XD-V2 Requires two people and takes 1.5-2 hours for lnstallation. Quick & Easy Assembly Ridge Reinforced Walls Available in Various Sizes...
  • Page 2: Before You Start

    BEFORE YOU START Owner's Manual Prior to installation, it is important that you contact your local government authority to determine if building approval is required. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable.
  • Page 3: Important Notes

    PLAN AHEAD Site Selection Avoid overhanging trees as much as possible as leaves will make regular cleaning necessary and broken branches are a potential hazard. Small trees,bushes or fences nearby can be helpful,acting as a wind break. Site Preparation The site must be prepared so that the base of the shed is level all round and checking with a spirit level is required.
  • Page 4 Qty. Qty. PART PART 957mm 1860mm 937mm 1860mm 1260mm 1750mm 1260mm 1750mm 922mm 1750mm 922mm 1432mm 1750mm 1432mm 1750mm 1712mm 1915mm 1915mm 1987mm 1987mm 1462mm 1462mm 1961mm 1750mm 940mm 940mm 227mm 188mm 212mm 80mm...
  • Page 6: Assembly Overview

    ASSEMBLY OVERVIEW...
  • Page 7 ASSEMBLY OVERVIEW...
  • Page 8 Qty. PART Step 1: Side Walls (2X)
  • Page 9: Step 2: Rear Wall

    Qty. PART Step 2: Rear Wall...
  • Page 10: Step 3: Front Wall

    Qty. PART Step 3: Front Wall -10-...
  • Page 11 Qty. PART Step 3: Front Wall -11-...
  • Page 12 Qty. PART Step 4: Wall Assembly Above below -12-...
  • Page 13 Qty. PART Step 5: Gables and windows -13-...
  • Page 14 Qty. PART Step 5: Gables and windows -14-...
  • Page 15 Qty. PART Step 5: Gables and windows Endurance board installation -15-...
  • Page 16 Qty. PART Step 5: Gables and windows C1&C2 component installation C9 component installation After the C1&C2&C9 components are installed, push the P6 to the other side. -16-...
  • Page 17 Qty. PART Step 5: Gables and windows Install the C3 parts, remove the screws, and then replace them. -17-...
  • Page 18 Qty. PART Step 6: Roof f installation -18-...
  • Page 19 Qty. PART Step 6: Roof f installation -19-...
  • Page 20 Qty. PART Step 6: Roof f installation -20-...
  • Page 21: Step 7: Door Assembly

    Qty. PART Step 7: Door Assembly -21-...
  • Page 22 Qty. PART Step 7: Door Assembly Assembly the lock as shown -22-...
  • Page 23 Qty. PART Step 7: Door Assembly First pass B3 to the side Pass B3 on the other side -23-...
  • Page 24 Qty. PART Step 8: Installing the door and lock -24-...
  • Page 25 Step 8: Installing the door and lock -25-...

Table of Contents