SolarEast PowerCool-LFP-HV Series Operation Manual

Hide thumbs Also See for PowerCool-LFP-HV Series:

Advertisement

Quick Links

PowerCool-LFP-HV series
Operation Manual
Version: 1.0
版本:1.0
Jiangsu SolarEast Energy Storage Technology Co., Ltd

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PowerCool-LFP-HV Series and is the answer not in the manual?

Questions and answers

Summary of Contents for SolarEast PowerCool-LFP-HV Series

  • Page 1 PowerCool-LFP-HV series Operation Manual Version: 1.0 版本:1.0 Jiangsu SolarEast Energy Storage Technology Co., Ltd...
  • Page 2 All brands and product names are trademarks or registered trademarks of their respective holders. This Manual introduces PowerCool-LFP-HV manufactured by SolarEast. Please read this manual before you install the product and follow the instructions carefully during the installation process. Should you have any confusion, please contact SolarEast for advice and clari昀椀cation.
  • Page 3: Table Of Contents

    CONTENTS 1 . Introduction 1.1Content and Structure of this Document This document is valid for PowerCool-LFP-HV batte爀礀 system. 1. Introduction …………………………………………………………………………………… 1 This document describes the product information, and guidance for installation, as well as APP 1.1 Content and Structure of this Document ……………………………………………… 1 con昀椀guration and commissioning.
  • Page 4: De昀椀Nition Of Abbreviations And Nouns

    ・If the batte爀礀 is stored for long time, it is required to charge it eve爀礀 six months, and the recom- NOTICE mended SOC should be 50%~55%. The batte爀礀 shall not be stored for more than 12 months if the NOTICE indicates a situation which, if not avoided, can result in prope爀琀y damage. storage temperature is -10 ~ 25℃, not more than 6 months if the storage temperature is 25 ~ 35 Warning electric shock.
  • Page 5: System Introduction

    The 昀椀nal right of interpretation is rese爀瘀ed by If the batte爀礀 is wet or submerged in water, do not t爀礀 to access it. Contact customer se爀瘀ice for Jiangsu SolarEast Energy Storage Technology Co., Ltd. technical assistance.
  • Page 6: Application Scenario

    1) Batte爀礀 Control Box Display Panel 3.2 Application scenario If WiFi is to be reconnected, press the button and hold for 5s till the WIFI icon on the screen 昀氀ashes, and then proceed with WiFi connection on App by following the procedures set out in Section 5.17 and 5.21 below.
  • Page 7: Package Items

    4.3 Installation location Make sure that the installation location meets the following conditions: ・The 昀氀oor is 昀氀at and level; ・There are no 昀氀ammable or explosive materials nearby; ・The ambient temperature is within the range from 0°C to 50°C; ・The temperature and humidity (<60%RH) are maintained at a constant level; ・There is minimal dust and di爀琀...
  • Page 8: Cables Connection

    4) Tighten M6*12 screws into the threaded holes on both sides of Batte爀礀 Control Box and each 2) Place batte爀礀 pack in the right place of the pedestal. CAUTION: align the batte爀礀 pack and pack. pedestal before putting it on, make sure the couplings are on the same line to avoid any structur- al damage.
  • Page 9: Power On

    5.1 Download our APP: BAT- BAT+ APP for iOS: Open up the APP Store, type in 'SolarEast PowerCool' in the Search tab to search and download. APP for Android: Open up the Google Play, type in 'SolarEast PowerCool' in the Search tab to search and download.
  • Page 10 5.5 Click ‘get a veri昀椀cation code’ and retrieve it from the mailbox. Inse爀琀 the veri昀椀cation code 5.3 Click ‘Register’ and go to this page to select identity received on this page, set the password, check ‘I agree’ and click ‘Enter’. 5.4 Go to this page after selecting identity, inse爀琀...
  • Page 11 5.9 On this page, you can reset password by inse爀琀ing the new password twice, and then click 5.7 Click to switch language and go to the front page. 5.10 The picture demonstrates a distributor’s account. 5.8 Click ‘Retrieve the password’ and go to this page, you may inse爀琀 the account number, obtain It shows such 昀椀gures as the number of devices installed, total installed capacity, newly increased a veri昀椀cation code via email, input the veri昀椀cation code and click ‘Next step’.
  • Page 12 5.11 Click ‘System installed’ on the front page, you can view the systems you created. You may 5.13 Click any item on the system list, you will go to the ‘System information’ page, where you search by system name, email or address. may view and edit system information.
  • Page 13 5.15 Click ‘+’ on the ‘Batte爀礀 list’ page and then you may add a new device by scanning its tag 5.17 Scan tag code and go to ‘Add device’ page, and then click ‘Wireless connection’ for WIFI code. con昀椀guration. 5.18 Click on "How to Add a Device" to view the step-by-step instructions for adding a device. 5.16 Find our label code on the side of the device and scan it.
  • Page 14 On this page, click on "Wireless LAN" to access the Wi-Fi con昀椀guration page and connect to 5.19 On the system WIFI page, you can 昀椀nd the device WIFI name based on its SN code. Device WIFI name: SOLAREAST-(device SN code) the device's Wi-Fi.
  • Page 15 5.21 When the network is successfully con昀椀gured, a prompt will pop out. 5.23 You may check the operating information of the device and view the upgrade protocol. Click ‘Bind device information’ button, and return to device list page when the binding is done. 5.22 Click any item on the batte爀礀...
  • Page 16 5.25 View cell running data 5.27 You are allowed to change avatar, name and contact on ‘Account settings’ page. 5.28 On ‘Installer management’ page, you may view installers under your name. Click each 5.26 [Distributor account] ‘My’ page features the following functions: checking personal information, viewing messages, installer to view the details.
  • Page 17 5.29 You may view client details by clicking ‘Client management’. By clicking the system list, you 5.31 On this page you may repo爀琀 problems encountered and view historical feedback. may view the system information. 5.30 Language and temperature unit switching 5.32 On ‘FAQ’...
  • Page 18 5.33 View APP version details. 5.35 On this page, you may change password or email address. You may also view list of shared information, log o昀昀, view se爀瘀ice agreement and privacy agreement, clear cache and cookies, and log out. 5.34 ‘About us’ pages shows company pro昀椀le and contact information of the supplier. 5.36 On ‘Account and security’...
  • Page 19: Maintenance

    5.37 On account cancellation page, you are allowed to cancel your account. 6.Maintenance 6.1 Capacity calibration It is better to fully charge-discharge the batte爀礀 for the capacity calibration at least once eve爀礀 six months (if available). Please conduct the calibration maintenance according to the following steps: 1)Make sure there is a relatively stable power supply source to charge the batte爀礀...

Table of Contents