Summary of Contents for SolarEast PowerCool-LFP5000 Series

  • Page 1 PowerCool-LFP5000 series Operation Manual Version No.: V1.0 Jiangsu SolarEast Energy Storage Technology Co., Ltd...
  • Page 2 Jiangsu SolarEast Energy Storage Technology Co., Ltd Disclaimer Copyright © SolarEast Energy Storage Technology Co., Ltd. 2023. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of SolarEast Energy Storage Technology Co., Ltd.
  • Page 3: Table Of Contents

    Jiangsu SolarEast Energy Storage Technology Co., Ltd CONTENTS Introduction ......................1 Content and Structure of this Document ............1 Target Group ....................1 Levels of Warning Messages ................1 Definition of Abbreviations and Nouns ............2 Safety ........................3 Safety Instruction ..................3 Battery precautions ..................3...
  • Page 4: Introduction

    Jiangsu SolarEast Energy Storage Technology Co., Ltd 1. Introduction 1.1 Content and Structure of this Document This document is valid for Powercool-LFP5000 battery. This document describes the product information, and guidance for installation, as well as APP configuration and commissioning.
  • Page 5: Definition Of Abbreviations And Nouns

    Jiangsu SolarEast Energy Storage Technology Co., Ltd CAUTION CAUTION indicates a hazardous situation which, if not avoided, could result in minor or moderate injury. NOTICE NOTICE indicates a situation which, if not avoided, can result in property damage. Warning electric shock.
  • Page 6: Safety

    Jiangsu SolarEast Energy Storage Technology Co., Ltd 2. Safety 2.1 Safety Instruction This product is designed and tested in accordance with international safety requirements IEC 62619, IEC 63056, and IEC 62040, but as with all electrical and electronic equipment, certain precautions must be observed when installing and operating the product.
  • Page 7: Emergency Situation

    Jiangsu SolarEast Energy Storage Technology Co., Ltd reasons. 2.3 Emergency situation DANGER This product is designed with multiple safety strategies to prevent hazards resulting from failure. However, hazards and dangers could emerge in few uncertain situations. 2.3.1 Fire The battery pack may catch fire when heated over 150°C.
  • Page 8: Product Introduction

    Jiangsu SolarEast Energy Storage Technology Co., Ltd 3. Product Introduction 3.1 Technical Data Model PowerCool-LFP5000 Total energy 5.22 kWh Usable Energy* 4.9 kWh Voltage Range 44.8~57.6 Vd.c Nominal Voltage 51.2 V Max. Charge Voltage 57.6 V Max. continuous charging current 50 A Max.
  • Page 9: Product Appearance

    Jiangsu SolarEast Energy Storage Technology Co., Ltd measured with a standard test method: 0.2C Charge and Discharge. 3.2 Product Appearance...
  • Page 10: Battery Interface Instruction

    Jiangsu SolarEast Energy Storage Technology Co., Ltd 3.3 Battery Interface Instruction All the ports and indicators are shown in the picture below and detailed in the following table. Object Name Description Power switch The switch of the battery Grounding protection...
  • Page 11: Application Scenario

    Jiangsu SolarEast Energy Storage Technology Co., Ltd 3.4 Application scenario 3.5 Features  The battery is non-toxic, pollution-free and environmental-friendly.  Anode material is made from LiFePO with safety performance and long cycle life.  Support upgrade BMS software via APP.
  • Page 12: Installation

    Jiangsu SolarEast Energy Storage Technology Co., Ltd 4. Installation 4.1 Tools and safety gear The displayed tools are recommended and could be used in the installation of battery or batteries. And the safety gear should be worn correctly during installation.
  • Page 13 Jiangsu SolarEast Energy Storage Technology Co., Ltd b. Parallel connection power cables*2 (Only for slaves, 4AWG) c. RJ45 communication cable for parallel configuration*1 (Only for slaves) d. Power cables to inverter*2 (Only for master) e. RJ45 communication cable to inverter*1 (Only for master)
  • Page 14: Installation Location

    Jiangsu SolarEast Energy Storage Technology Co., Ltd g. Bracket*2 h. User Manual & Warranty card *1 4.3 Installation location Make sure that the installation location meets the following conditions:  The area is completely waterproof;  The floor is flat and level;...
  • Page 15: Installation Direction

    Jiangsu SolarEast Energy Storage Technology Co., Ltd humidity or temperature.  According to the on-site situation, the equipment should be fixed to the wall during installation against the wall.  The battery system should be used in PD2 environment. CAUTION If the ambient temperature is out of the operating range, the battery stops operating to protect itself.
  • Page 16 Jiangsu SolarEast Energy Storage Technology Co., Ltd 2) Use 4 location holes, stack the batteries together. 3) And connect the 4 lockers together. 4) Maximum 5 in stack.
  • Page 17: Parallel Connection

    Jiangsu SolarEast Energy Storage Technology Co., Ltd 4.6 Parallel connection 1) Please check the voltage of each battery and make sure the voltage difference is less than 1V. 2) Connect communication cables to M/S communication terminal interface between batteries. 3) Connect the orange parallel connection power cables to the BAT+ terminals of adjacent batteries.
  • Page 18 Jiangsu SolarEast Energy Storage Technology Co., Ltd BAT number Group DIP 1 DIP 2 DIP 3 DIP 4 Master Slave Master Slave 1 Slave 2 Master Slave 1 Slave 2 Slave 3 Master Slave 1 Slave 2 Slave 3 Slave 4...
  • Page 19 Jiangsu SolarEast Energy Storage Technology Co., Ltd Slave 5 Slave 6 Master Slave 1 Slave 2 Slave 3 Slave 4 Slave 5 Slave 6 Slave 7 Master Slave 1 Slave 2 Slave 3 Slave 4 Slave 5 Slave 6 Slave 7...
  • Page 20: Connect To Inverter

    Jiangsu SolarEast Energy Storage Technology Co., Ltd professional personnel; DIP8: CAN communication 120 resistance switch: 0 represents OFF, while 1 represents ON. Keep in ON when there is no parallel connection. Under the circumstance of parallel connection, turn DIP8 of first and last batteries ON and keep all others in-between OFF.
  • Page 21: Power On

    Jiangsu SolarEast Energy Storage Technology Co., Ltd CAUTION I. A rated 160A overcurrent and safety cut-off device has to be installed between the battery system and the inverter to isolate all charged conductors (positive and negative) II. In Australia installations should be conducted in accordance with AS/NZS 3000 and AS/NZS 5139.
  • Page 22: Power Off

    5. APP configuration and commissioning 5.1 Download our APP: APP for iOS: Open up the APP Store, type in 'SolarEast PowerCool' in the Search tab to search and download. APP for Android: Open up the Google Play, type in 'SolarEast PowerCool' in the Search tab to search and download.
  • Page 23 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.3 Click ‘Register’ and go to this page to select identity...
  • Page 24 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.4 Go to this page after selecting identity, insert the email address to be signed in and click ‘Next step’.
  • Page 25 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.5 Click ‘get a verification code’ and retrieve it from the mailbox. Insert the verification code received on this page, set the password, check ‘I agree’ and click ‘Enter’.
  • Page 26 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.6 Click ‘Service Agreement’ or ‘Privacy Agreement’, you may view the details of such agreement.
  • Page 27 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.7 Click to switch language...
  • Page 28 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.8 Click ‘Retrieve the password’ and go to this page, you may insert the account number, obtain a verification code via email, input the verification code and click ‘Next step’.
  • Page 29 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.9 On this page, you can reset password by inserting the new password twice, and then click and go to the front page.
  • Page 30 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.10 The picture demonstrates a distributor ’ s account. It shows such figures as the number of devices installed, total installed capacity, newly increased clients this month and total number of clients.
  • Page 31 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.11 Click ‘System installed’ on the front page, you can view the systems you created. You may search by system name, email or address.
  • Page 32 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.12 On the ‘system list’ page, you may add new systems by clicking ‘+’ button. Then fill in information as instructed and save.
  • Page 33 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.13 Click any item on the system list, you will go to the ‘System information’ page, where you may view and edit system information.
  • Page 34 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.14 Click ‘Battery device’ on the ‘System information’ page and go to ‘Battery list’, where you may add device and view battery information.
  • Page 35 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.15 Click ‘+’ on the ‘Battery list’ page and then you may add a new device by scanning its tag code. 5.16 Find our label code on the side of the device and scan it.
  • Page 36 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.17 Scan tag code and go to ‘Add device’ page, and then click ‘Wireless connection’ for WIFI configuration.
  • Page 37 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.18 Click on "How to Add a Device" to view the step-by-step instructions for adding a device.
  • Page 38 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.19 On the system WIFI page, you can find the device WIFI name based on its SN code. Device WIFI name: SOLAREAST-(device SN code) Click ‘connect’ and then you are given the options of ‘Connect only this time’ and ‘Always connect’.
  • Page 39 Jiangsu SolarEast Energy Storage Technology Co., Ltd b) On this page, click on "Wireless LAN" to access the Wi-Fi configuration page and connect to the device's Wi-Fi.
  • Page 40 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.20 When the cellphone is truly connected to device WIFI, click ‘Return’ on the system WIFI page of the APPP and it will jump to ‘Start to configure network’ page. You may then select a WIFI on the list and input its password, and click ‘Connect’.
  • Page 41 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.21 When the network is successfully configured, a prompt will pop out. Click ‘Bind device information’ button, and return to device list page when the binding is done.
  • Page 42 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.22 Click any item on the battery list you will go to the device details page, where you can view such data as battery SOC, battery temperature, voltage, power, current, operating information, cell monitoring, alarm data and statistics.
  • Page 43 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.23 You may check the operating information of the device and view the upgrade protocol. 5.24 View alarm data...
  • Page 44 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.25 View cell running data...
  • Page 45 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.26 [Distributor account] ‘My’ page features the following functions: checking personal information, viewing messages, viewing installers, viewing clients, switching language, switching temperature unit, submitting feedback and setting the system. ‘My service’ mainly include viewing FAQ, operation manual, APP version information and...
  • Page 46 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.27 You are allowed to change avatar, name and contact on ‘Account settings’ page.
  • Page 47 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.28 On ‘Installer management’ page, you may view installers under your name. Click each installer to view the details.
  • Page 48 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.29 You may view client details by clicking ‘Client management’. By clicking the system list, you may view the system information.
  • Page 49 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.30 Language and temperature unit switching 5.31 On this page you may report problems encountered and view historical feedback.
  • Page 50 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.32 On ‘FAQ’ page you may view the list of common alarm problems. Click any item to view details. 5.33 View APP version details.
  • Page 51 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.34 ‘About us’ pages shows company profile and contact information of the supplier. 5.35 On this page, you may change password or email address. You may also view list of shared information, log off, view service agreement and privacy agreement, clear cache and...
  • Page 52 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.36 On ‘Account and security’ page, you may change password and email address. 5.37 On account cancellation page, you are allowed to cancel your account.
  • Page 53 Jiangsu SolarEast Energy Storage Technology Co., Ltd 5.38 View alarm list and alarm description.
  • Page 54: Maintenance

    6. Maintenance 6.1 Capacity calibration It is better to fully charge-discharge the battery for the capacity calibration at least once every six months (if available). Please conduct the calibration maintenance according to the following steps: 1) Make sure there is a relatively stable power supply source to charge the battery at a maximum charge current of 50A, e.g.

Table of Contents