Hexwrench 4mm Phillips Screwdriver Slotted Screwdriver Disclaimer The information in this document is subject to change without notice and should not be construed as a commitment by RAEDIAN. RAEDIAN assumes no responsibility for any errors that may appear in this document.
Page 3
Preparing 1.1 Power Cable Planning 1.2m BOTTOM ENTRY TOP ENTRY REAR ENTRY 1.2 Ethernet Cable Planning Ethernet cable CAT5 or higher; Cable length depends on the distance between wallbox TOP ENTRY REAR ENTRY and distribution board.
Page 5
Wiring Hexwrench 5mm BOTTOM ENTRY TOP ENTRY REAR ENTRY 1 Phase Connection 16mm 3 Phase Connection 16mm An external at least Type A RCD is required to be installed in the upstream. Ensure the installation comply with all applicable laws and regulations.
Installing Hexwrench 4mm 4.1 Connect Ethernet Cable (for Home Balance and Solar Charging) Recommended Ethernet cable length: 45 cm Top entry: 35 cm Rear entry: 4.2 Complete Installation ”Clip!” Be sure to be fastened Be sure to be fastened...
Page 7
CT/SC Kit Installation 5.1 CT Clamp Positioning(Home Balance ) Single phase Power Distribution Board Grid Meter Power cable CAT5 cable 00623 RAEDIAN Wallbox Load Three phase Power Distribution Board Grid Meter Power cable CAT5 cable 00623 RAEDIAN Wallbox Load...
5.2 Install CT Kit Wire CT clamp to adaptor 3- A 1- 3- A 1- 0023 0023 CT3 CT2 CT1 wiring sequence for straight through cable wiring sequence for crossover cable Close CT clamp Connect adaptor Get Started 6.1 LED Indicators LED Status Definition White...
Page 9
6.2 OLED Display V1.3.4 0FA6B1B1 15/05/2024 11:48:28 R E A D Y 00,000.00 kWh ∑ Booting Available Error Code Faulted FW Version V1.3.4 0FA6B1B1 Checksum 15/05/2024 11:48:28 R E A D Y Date Time 00,000.00 kWh ∑ Accumulative Energy Delivered Available...
Page 10
Connectivity Wi-Fi Charging 4G (optional) +000.000 kWh Schedule 00:00:07 30/11/2023 08:43:34 Energy Delivered(Current session) 229V 00/32A 00,000kW Charging Duration (Current session) 00,000.00 kWh ∑ Date Time Phase 1 Phase 3 Phase Voltage Load Management Real-time Charging Current/ Home Balance activated Current Available Waiting for grid capacity restored...
Page 11
Access 7.1 Plug And Charge (Default) 7.2 Authorization (Set In APP) Paring with APP PIN Code:XXXX Start Product Code:EAXXXXXX RAEDIAN APP Authorized with RFID...
Page 12
Cable hook Safe and secure installation on Convenient for keeping your uneven surfaces charging cable organized For more information, For instruction videos, please scan the QR code or visit us: please scan the QR code or visit us: https://raedian.com/support https://raedian.com/support...
Need help?
Do you have a question about the NEO and is the answer not in the manual?
Questions and answers