Texas Instruments BQ21088EVM User Manual
Texas Instruments BQ21088EVM User Manual

Texas Instruments BQ21088EVM User Manual

Evaluation module

Advertisement

www.ti.com
EVM User's Guide: BQ21088EVM
BQ21088 Evaluation Module
Description
The BQ21088EVM evaluation module (EVM) to
evaluate the BQ21088 device. The EVM supports
charge currents up to 1A and SYS currents up to
3A. The BQ21088EVM provides an external MR
for device pushbutton functionality evaluation, a TS
potentiometer circuit for TS functionality evaluation,
and a USB2ANY port for I2C interfacing functionality.
The EVM also includes a discrete LDO for digital pull-
up rails with jumpers for configurability.
Get Started
1. Order the BQ21088EVM.
2. Order the USB2ANY.
3. Follow this step-by-step guide.
SLUUD47 – OCTOBER 2024
Submit Document Feedback
Features
1A linear battery charger
I2C configurable battery regulation voltage with
0.5% accuracy
Configurable termination current down to 0.5mA
Programmable thermal charging profile with
configurable hot, warm, cool, and cold thresholds
Power path management for powering the system
and charging the battery
30nA shutdown mode for longest shelf life
One button wake-up and reset input with
adjustable timers
I2C communication control
Applications
TWS headset and charging case
Smart glasses, AR and VR
Smart watches and other wearable devices
Retail automation and payment
Building automation
BQ21088EVM Hardware Board
Copyright © 2024 Texas Instruments Incorporated
Description
BQ21088 Evaluation Module
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BQ21088EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Texas Instruments BQ21088EVM

  • Page 1 • I2C configurable battery regulation voltage with charge currents up to 1A and SYS currents up to 0.5% accuracy 3A. The BQ21088EVM provides an external MR • Configurable termination current down to 0.5mA for device pushbutton functionality evaluation, a TS •...
  • Page 2: Kit Contents

    1 Evaluation Module Overview 1.1 Introduction The BQ21088EVM is an evaluation kit for the BQ21088 integrated battery charge management IC. The BQ21088 is an integrated battery charge management IC that integrates the most common functions for wearable devices: linear charger, regulated output, manual reset with timer, and ship mode function. The low quiescent current (IQ) during operation and shutdown enables maximum battery life.
  • Page 3: Evm Setup

    USB2ANY connector; for connecting the device to the USB2ANY evaluation board to allow computer to interface with the EVM. VIO connector to 3p3V. J8, J9 Board connector to the other module. /INT connector to 3p3V. I2C pull-up. Micro-USB connector (optional for VIN) BQ21088EVM connections. Power Power System Supply Supply Load #1 USB2ANY SLUUD47 –...
  • Page 4: Evm Connectors And Test Points

    Turn the supply PS#2 on, then turn the supply PS#1 on. The VSYS rises to 4.5V. The device begins to charge as long as the TS is left at default configuration and there are no other faults. BQ21088 Evaluation Module SLUUD47 – OCTOBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 5 If the supplies (VIN and VBAT) are turned off, then users need to restart the TI Charger GUI for the correct I C transactions to be reflected in the TI Charger GUI. Figure 2-2. TI Charger GUI Device Selection SLUUD47 – OCTOBER 2024 BQ21088 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 6 Select the BQ2518X from the charger selection. Click Quick Start or Register Map. Figure 2-3. BQ21088EVM Connected The Quick Start is shown in Figure 2-4. Figure 2-4. Quick Start BQ21088 Evaluation Module SLUUD47 – OCTOBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 7 Ship mode, hold the TS/MR button for the configured t then remove VIN. LPRESS When the voltage on the SYS (SC#2) falls to 0V, Ship mode has been enabled. Figure 2-6. SHIP_RST Register SLUUD47 – OCTOBER 2024 BQ21088 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 8 VBAT /INT 10uF TP12 10µF 0.1uF TS/MR TS/MR TP11 BQ21088YBGR 10uF 10uF 10µF 10µF BQ2518x Power Path Battery charger IC Figure 3-1. BQ21088EVM Schematic BQ21088 Evaluation Module SLUUD47 – OCTOBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 9 J1.5 J2.5 J1.6 J2.6 J1.7 J2.7 J1.8 J2.8 J2.9 J2.10 as an INT or STAT1 Connectors and Jumper Options Figure 3-2. BQ21088EVM Jumper Connectors SLUUD47 – OCTOBER 2024 BQ21088 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 10 3.2 PCB Layouts The EVM PCB layout images are shown in Figure 3-4 through Figure 3-5. Figure 3-4. Top Layer Figure 3-5. Bottom Layer BQ21088 Evaluation Module SLUUD47 – OCTOBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 11 Tactile Switch SPST-NO Top Actuated Surface SMT_TACT 4.30152E+11 Wurth Electronics Mount TP1, TP2, TP3 Test Point, Multipurpose, Black, TH Black Multipurpose Test point 5011 Keystone SLUUD47 – OCTOBER 2024 BQ21088 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 12 RES, 0, 5%, 0.1 W, AEC-Q200 Grade 0, 0402 0402 ERJ-2GE0R00X Panasonic RES, 0, 5%, 0.063 W, AEC-Q200 Grade 0, 0402 CRCW04020000Z0ED Vishay-Dale 0402 BQ21088 Evaluation Module SLUUD47 – OCTOBER 2024 Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 13: Additional Information

    Additional Information 4 Additional Information 4.1 Trademarks All trademarks are the property of their respective owners. SLUUD47 – OCTOBER 2024 BQ21088 Evaluation Module Submit Document Feedback Copyright © 2024 Texas Instruments Incorporated...
  • Page 14 STANDARD TERMS FOR EVALUATION MODULES Delivery: TI delivers TI evaluation boards, kits, or modules, including any accompanying demonstration software, components, and/or documentation which may be provided together or separately (collectively, an “EVM” or “EVMs”) to the User (“User”) in accordance with the terms set forth herein.
  • Page 15 www.ti.com Regulatory Notices: 3.1 United States 3.1.1 Notice applicable to EVMs not FCC-Approved: FCC NOTICE: This kit is designed to allow product developers to evaluate electronic components, circuitry, or software associated with the kit to determine whether to incorporate such items in a finished product and software developers to write software applications for use with the end product.
  • Page 16 www.ti.com Concernant les EVMs avec antennes détachables Conformément à la réglementation d'Industrie Canada, le présent émetteur radio peut fonctionner avec une antenne d'un type et d'un gain maximal (ou inférieur) approuvé pour l'émetteur par Industrie Canada. Dans le but de réduire les risques de brouillage radioélectrique à...
  • Page 17 www.ti.com EVM Use Restrictions and Warnings: 4.1 EVMS ARE NOT FOR USE IN FUNCTIONAL SAFETY AND/OR SAFETY CRITICAL EVALUATIONS, INCLUDING BUT NOT LIMITED TO EVALUATIONS OF LIFE SUPPORT APPLICATIONS. 4.2 User must read and apply the user guide and other available documentation provided by TI regarding the EVM prior to handling or using the EVM, including without limitation any warning or restriction notices.
  • Page 18 Notwithstanding the foregoing, any judgment may be enforced in any United States or foreign court, and TI may seek injunctive relief in any United States or foreign court. Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2023, Texas Instruments Incorporated...
  • Page 19 TI products. TI’s provision of these resources does not expand or otherwise alter TI’s applicable warranties or warranty disclaimers for TI products. TI objects to and rejects any additional or different terms you may have proposed. IMPORTANT NOTICE Mailing Address: Texas Instruments, Post Office Box 655303, Dallas, Texas 75265 Copyright © 2024, Texas Instruments Incorporated...

This manual is also suitable for:

Bq21088

Table of Contents