Page 1
Edition 13.7 Serial no. 151912- Publ. no 1000073-00 OM 9020S 2023-02 ORWAK 9020S ORIGINAL OPERATING INSTRUCTIONS...
Page 3
English English CONTENTS CONTENTS Safety information..Safety information..Parts of the machine..Parts of the machine..Safety......Safety......Control panel ....Control panel ....Operating instruction..Operating instruction..Technical specification.. Technical specification.. Dimensional drawing..Dimensional drawing..Transport ....... Transport ....... CE......
Page 4
English OPERATOR WARNING & DUTY This manual must be available permanently near the baler. Each operator must read and follow the full instruction of this manual before being authorize. All operator must absolutely study and fully understand the operator’s manual, specifically pay a particular attention to the safety procedure section.
English PARTS OF THE MACHINE Emergency stop Hood Control panel Press unit Front cover Rail Data plate End guard Stop Hydraulic unit Chamber Buttons for brake Apron with handle Latches Latches Pedal Door and door handle Strap slots Press plate Strap hook Latches Rear cover...
English SAFETY Please read the operating instructions BEFORE operating the machine. Our Warranty and Product Responsibility require that: • instructions are followed, and that no alterations or modifications are carried out; • original spare parts, and hydraulic oils and lubricants recommended by the machine manufacturer are used;...
English RANGE OF APPLICATION The machine is a hydraulically operated baler intended for compacting bulky materials such as cardboard, paper and plastic. The machine can be set to two different pressure settings, with the lower pressure setting (12 tons) to be used for the compaction of plastic. Both pressure settings (12 or 20 tons) can be used for the compaction of cardboard and paper.
Page 8
English OPERATING INSTRUCTIONS – operation 4872248-00 (VG13) 4872305-00 (VG13HD) WARNING! Only the operator is allowed in the working area of the machine! Mounting the straps Make sure that the main power switch is on. 2 Thread the strap through the slots on the front and rear of the chamber.
Page 9
English Baling 7 The bale light flashes yellow – it is time to remove the bale. 8 Grip the two handles, press in both buttons (above the handles) and slide the press unit to one side. 9 Pull out the straps (over the bale) using the strap hook.
English TECHNICAL SPECIFICATIONS DIMENSIONAL DRAWING GENERAL DATA ELECTRICAL DATA(50Hz) Total weight 1585 kg/3495 lb Operating voltage 3x400-415V, 50Hz Chamber 528 kg/1165 lb 3x230V, 50Hz Press unit 529 kg/1166 lb 3x200V, 50/60Hz Dimensions Control voltage 24V DC Transport height 1900 mm/6’3’’ Electrical connection Height 2470 mm/8’2’’...
English English EC DECLARATION OF CONFORMITY Orwak AB Svetsaregatan 4 SE-576 33 Sävsjö, Sweden Tel: +46-382-15700 declare under our sole responsibility that the product model 4909020-00 - 4909020-99 4909020-S001 - 4909020-S999 to which this declaration relates is in conformity with the following standards or other normative documents following the provisions of Directives 2006/42/EC (Machinery Directive) 2014/30/EU (EMC Directive)
English WEEKLY INSPECTION AND MAINTENANCE NOTE! During inspection and maintenance, servicing and the removal of trapped waste, etc: 1. Always turn the main power switch to “0” and secure it with a padlock. 2. Do not work inside the machine. CLEAN THE PRESS PLATE (removal of material) AUTO...
English SAFETY CHECKS - Check that the emergency stop is working. - Check the hatch switch: the machine should not be able to start if the front or rear hatches are open or opened. - Check the end guards (there are 2) and the stops (there are 2). Make sure that they are in place and firmly attached.
English Installation Please read all the instructions before commencing the installation. Failure to follow the instructions could result in personal injury or damage to the machine. Ensure that no one except the authorised installer is in the vicinity of the machine during the installation process! Only one person may carry out the installation.
Page 15
Installation English 10. Swap back the cables Y1 and Y2. 11. Open the door and remove the wooden supports from the chamber. 12. Select the compaction pressure. If the selector lug is fitted (as it is on delivery), the compaction pressure is 20 tons (for corrugated cardboard).
Page 20
COMPACTION SOLUTIONS FOR MOST TYPES OF WASTE ORWAK develops solutions for sorting and recycling waste ORWAK develops solutions for sorting and recycling waste materials that improve business efficiency, contribute to a materials that improve business efficiency, contribute to a cleaner working and natural environment to provide the best cleaner working and natural environment to provide the best total waste handling economy.
Need help?
Do you have a question about the ORWAK 9020S and is the answer not in the manual?
Questions and answers