EN ISO
9001
Quality
international
level
ProLoop2
Translation of the original instructions
General
1
Safety instructions
Thes e dev ices and their acces s o ries m ay o nl y be o p erated in co m p l iance w ith the o p erating ins tru ctio ns (intended u s e)!
Thes e dev ices and their acces s o ries m ay o nl y be co m m is s io ned by trained and q u al if ied p ers o nnel .
Thes e dev ices m ay o nl y be o p erated w ith the intended s u p p l y v o l tag e and p aram eters .
I f m al f u nctio ns o ccu r that canno t be rectif ied, s hu t do w n the dev ice and s end it in f o r rep air.
Thes e dev ices are o nl y al l o w ed to be rep aired by the m anu f actu rer. Tam p ering and al teratio ns are no t p erm itted. This w il l inv al idate al l g u arantee and
w arranty cl aim s .
Mechanical mounting in the switch cabinet
2
The 11-p in v ers io n o f the Pro L o o p is m o u nted o nto a m o u nting rail bas e (E S 12). This bas e is o rdered and del iv ered s ep aratel y as it is no t incl u ded in the
s co p e o f del iv ery .
3
Electrical connection
The l o o p co nnectio n w iring to the l o o p detecto r m u s t be tw is ted at l eas t 20 tim es p er m eter.
Pl eas e w ire the dev ice in acco rdance w ith the term inal as s ig nm ent. M ak e s u re the term inal s are as s ig ned co rrectl y .
Term inal co nnectio n diag ram , E S 12 bas e as s ig nm ent
C heck the el ectrical co nnectio n (bas e as s ig nm ent) w hen ex chang ing a l o o p detecto r f ro m ano ther m anu f actu rer.
A:
B:
Su p p l y
L o o p co nnectio n
v o l tag e
1-channel dev ice
co nnectio n
A C
A 1
1
A C
11
1)
O nl y ap p l ies to Pro L o o p 2 w ith the des ig natio n « . . . . S. 78. . . . . »
4
Value and parameter setting options
G eneral
The s etting s o f the Pro L o o p dev ices in this chap ter are s ho w n and ex p l ained f o r the 1-l o o p dev ice. The s etting s f o r l o o p 2 o f a 2-l o o p dev ice s ho u l d be
m ade u s ing the co rres p o nding m etho d.
L C D dis p l ay and co ntro l s
4.1
Standard dis p l ay Standard dis p l ay
1-l o o p dev ice
2-l o o p dev ice
1
1
2
(11-p in)
L C D dis p l ay
« M o de» -bu tto n
« Data» -bu tto n
Pl u g -in co nnectio n, 11-p in
I nf o L E D
C 2
1)
:
C 1:
L o o p co nnectio n
L o o p co nnectio n
2-channel dev ice
2-channel dev ice
2
2
1
1
C o ntro l bu tto n
C o ntro l bu tto n
Mode
Data
Sim1
Sim2
L o o p d e te c to r fo r in d u s tria l d o o rs a n d g a te s ,
c a r p a rk s a n d p a rk in g b o lla rd s
D:
E :
Rel ay co nnectio n
Rel ay co nnectio n
o u tp u t 1
o u tp u t 2
21
12
A 2
31
22
14
E x p l anatio n o f the L C D dis p l ay
L o o p 1
F u nctio n
L o o p 2
1
2
E x am p l e:
Tim e
E x am p l e:
f u nctio n s et
Param eter
« h» s et
E x p l anatio n o f the L E D
Red & g reen: Start-u p p has e
G reen:
O p eratio n
Red & g reen: C o nf ig u ratio n
Info
F l as hing g reen: L o o p activ ated
F l as hing red: E rro r
F l as hing
red + g reen: Sim u l atio n
1
Need help?
Do you have a question about the ProLoop2 and is the answer not in the manual?
Questions and answers