Advertisement

Quick Links

CUBE-SC2NN12HN1, CUBE-SC2NN12HN3,
CUBE-SC2NN12HN4, CUBE-SC2NN12HN6,
1.
GENERAL INTRODUCTION ................................................... 1
1.1. Document Purpose ............................................................... 1
1.2. Product Purpose ................................................................... 1
1.3. Product Mounting and Location ............................................ 1
2.
PRODUCT DESCRIPTION ....................................................... 2
3.
INSTALLATION ........................................................................ 8
3.1. Inspecting the Product .......................................................... 9
3.2. Following and Using Safety Precautions................................ 9
3.3. Obtaining Tools and Equipment ............................................ 9
3.4. Preparing the Installation Site ............................................... 9
3.5. Lifting the CUBE ................................................................ 10
3.6. Mounting the CUBE ........................................................... 10
3.7. CUBE Wiring and Equipment.............................................. 12
3.8. Verifying the Installation ..................................................... 15
4.
PERIODIC MAINTENANCE .................................................. 15
5.
6.
WARRANTY & CUSTOMER SERVICE ................................. 15
7.
SPECIFICATIONS ................................................................... 16
7.1. Regulatory Specifications .................................................... 16
7.2. Product Specifications ........................................................ 16

1. GENERAL INTRODUCTION

1.1. Document Purpose

This document provides general information for the CUBE-SC2NN12HNx of the Charles Industries' Universal Broadband Enclosure
(CUBE) product line. Figure 1 shows a closed front view of the enclosure.
Hereafter, the Charles Universal Broadband Enclosure CUBE-SC2NN12HN1, CUBE-SC2NN12HN3, CUBE-SC2NN12HN4, CUBE-
SC2NN12HN6, and CUBE-SC2NN12HN7 will be referred to as "SC2NN12HN1," "SC2NN12HN3," "SC2NN12HN4,""SC2NN12HN6,"

1.2. Product Purpose

This CUBE consists of a protective enclosure for an integrated system of electronic components and equipment that can serve fiber and
copper interfaces.

1.3. Product Mounting and Location

This low-profile, high power, small-cell (LP HPSC) radio shroud is suitable for outside plant-type (OSP) locations and those that may
require NEC compliance. The outdoor, weather-resistant CUBE is to be mounted on a pad. The installer connects the power, fiber and
copper connections. Detailed mounting and installation information is covered in Section 3.
©Copyright 2024 Charles Industries LLC. All rights reserved.
Availability of features and technical specifications herein are subject to change without notice.
Charles is a registered trademark of Charles Industries.
Charles Universal Broadband Enclosure
and CUBE-SC2NN12HN7
General Description and Installation
"SC2NN12HN7,"or the "CUBE."
Figure 1
-NOTE-
LT-SC2NN12HNX
7
th
Printing, April 5, 2024
Front View of the CUBE
Page 1 of 16

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Charles CUBE-SC2NN12HN1 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Amphenol Charles CUBE-SC2NN12HN1

  • Page 1: Table Of Contents

    LT-SC2NN12HNX Printing, April 5, 2024 Charles Universal Broadband Enclosure CUBE-SC2NN12HN1, CUBE-SC2NN12HN3, CUBE-SC2NN12HN4, CUBE-SC2NN12HN6, and CUBE-SC2NN12HN7 General Description and Installation GENERAL INTRODUCTION ........... 1 1.1. Document Purpose ............... 1 1.2. Product Purpose ..............1 1.3. Product Mounting and Location ..........1 PRODUCT DESCRIPTION ............
  • Page 2: Product Description

    LT-SC2NN12HNX 2. PRODUCT DESCRIPTION The CUBE consists of a single compartment that supports radios and power supplies. The SC2NN12HN1, SC2NN12HN3, and SC2NN12HN4 support two radios and two power supplies, the SC2NN12HN6 supports three radios and three power supplies, and the SC2NN12HN7 supports four radios and one power supply.
  • Page 3 LT-SC2NN12HNX 78.87 21.30 30.00 66.00 10.25 16.25 11.80 49.50 11.80 Ø2.50 HOLE (4) 0.63 MOUNTING HOLES Figure 4 SC2NN12HN6 Dimensions (in inches) Printing Page 3 of 16...
  • Page 4 LT-SC2NN12HNX (4) LIFTING BRACKETS (2) POWER SUPPLY MOUNTING BRACKETS MOUNTING BRACKET FOR NOKIA B25-RRH 4x30 RADIO MOUNTING BRACKET FOR (4) DAC FANS NOKIA B4-RRH 2x60-4R RADIO DAC VENTS (3) QUARTER TURNS 2X8 POSITION GROUND BAR 216 STYLE (NOT VISIBLE IN THIS VIEW) PADLOCKABLE NOKIA ITP4 MOUNTING BRACKET...
  • Page 5 LT-SC2NN12HNX ALARM TERMINAL BLOCK DC BREAKER BOX 2X14 POSITION GROUND BAR CABLE MANAGEMENT BAR (4) LIFTING BRACKET (2) POWER SUPPLY MOUNTING BRACKETS MOUNTING BRACKET FOR NOKIA 2x40-07-L-AT RADIO (4) DAC FANS DOOR ALARM SWITCH DAC VENTS (3) QUARTER TURNS 216 STYLE MOUNTING BRACKET FOR PADLOCKABLE NOKIA B25 4x30 or...
  • Page 6 LT-SC2NN12HNX ALARM TERMINAL BLOCK AC BREAKER BOX 2X14 POSITION GROUND BAR CABLE MANAGEMENT BAR (4) LIFTING BRACKET (2) POWER SUPPLY MOUNTING (2) MOUNTING BRACKETS FOR BRACKETS NOKIA AHxxx RADIOS (4) DAC FANS DOOR ALARM SWITCH DAC VENTS (3) QUARTER TURNS 216 STYLE PADLOCKABLE DAC VENTS...
  • Page 7 LT-SC2NN12HNX (4) LIFTING BRACKET MOUNTING SHELVES FOR DOOR ALARM SWITCH (3) DELTA 2kW PSU (6) DAC FANS MOUNTING LOCATION (3) QUARTER TURNS NOKIA AZQW RADIO 216 STYLE PADLOCKABLE DAC VENTS MOUNTING SHELF FOR (1) NOKIA AHFxx DUAL BAND RADIO MOUNTING SHELF FOR ALARM TERMINAL BLOCK (1) NOKIA AHFxx DUAL BAND RADIO OR (1) NOKIA AHLBBA TRI-BAND RADIO...
  • Page 8 LT-SC2NN12HNX MOUNTING BRACKET FOR ERICSSON 6308 POWER SUPPLY (6) DAC FANS MOUNTING BRACKET FOR ERICSSON 4467 RADIO DAC VENTS (3) QUARTER TURNS 216 STYLE PADLOCKABLE DOOR ALARM SWITCH ALARM TERMINAL BLOCK MOUNTING BRACKET FOR ERICSSON 4490 RADIO AC BREAKER BOX MOUNTING BRACKET FOR ERICSSON 4890 RADIO 2X14 POSITION...
  • Page 9: Installation

    LT-SC2NN12HNX 3. INSTALLATION 3.1. Inspecting the Product The CUBE is shipped mounted upright on a skid. Remove the bolts, unpack the unit, and dispose of the packaging material. -INSPECTION NOTE- Visually inspect the unit for damages prior to installation. If the equipment was damaged in transit, immediately report the extent of the damage to the transportation company.
  • Page 10: Lifting The Cube

    LT-SC2NN12HNX 3.5. Lifting the CUBE See Table 1 for CUBE weight. Charles recommends the following procedure for lifting the CUBE. 3.5.1. Required Equipment SPREADER BARS One derrick (crane) capable of lifting the CUBE • SHORT SLINGS/CHAINS Spreader bars • Four lifting slings or chains with each having a 2,500 lbs. capacity •...
  • Page 11 LT-SC2NN12HNX 3.6.2. Constructing a New Pad Use only concrete for new pad construction. Do not use substitute materials since they lack the rigidity for CUBE placement. • • Observe local building practices for pad construction. Charles recommends that the pad should extend a minimum of 8” beyond the CUBE base on all sides.
  • Page 12: Cube Wiring And Equipment

    LT-SC2NN12HNX 3.7. CUBE Wiring and Equipment After the CUBE is properly mounted in the desired location, apply No-Ox where bus bar and other 2-hole lug connections will be made. Install ground and power connections. Always ground the equipment first, before making any other connections. WARNING Perform all bonding and grounding connections prior to any electrical and communications connections.
  • Page 13 LT-SC2NN12HNX Alarm Block (normally closed) Door Alarm W/BL Rectif i er 208/240VAC Installer connections Rectif i er 208/240VAC BK (-) RD + -48VDC ALARM Fan wiring (x4) -48VDC Breaker Speed Control External Controller Thermistor RD BK Board 2 power pairs Figure 13 SC2NN12HN3 Electrical Diagram AC Breaker Box...
  • Page 14 LT-SC2NN12HNX AC Breaker Box Alarm Block (normally closed) Door Alarm W/OR GND BUS L2 L1 30' AC whips AC in AC in AC in Installer Connections 54VDC 54VDC 54VDC Delta Delta Delta Scotchloks Rect Rect Rect (shipped loose) DC out DC out DC out -48VDC...
  • Page 15: Verifying The Installation

    LT-SC2NN12HNX 3.8. Verifying the Installation Verify that earth ground and all grounding and bonding is complete and functional. After verifying that all installer connections are secure and complete, apply voltage. 4. PERIODIC MAINTENANCE In the event that the enclosure needs to be opened in freezing conditions, a narrow, pointed metallic object such as a screwdriver or chisel, along with a non-metallic device like a rubber mallet, may be used to remove excessive ice buildup around the door and locking mechanism.
  • Page 16: Specifications

    LT-SC2NN12HNX 7. SPECIFICATIONS 7.1. Regulatory Specifications Designed to meet GR-487 • • UL-60950 Recognized If CUBEs are field-modified, a customer provided ETL field evaluation of the modified components may be required to re-establish ETL certification to UL standards. Consult local jurisdictions for guidance on a site-by-site basis. 7.2.

Table of Contents