Electric Schematic - LEGRAND ecotap Manual

Payment box
Hide thumbs Also See for ecotap:
Table of Contents

Advertisement

Available languages

Available languages

Step 3: Close the payment box
Switch on the main circuit breaker (MCB).
Verify that the payment terminal powers up.
Close the service door, using the master key.
7. ELECTRICAL SCHEMATIC
The figure on the right presents the wiring scheme of the
payment box.
Attention: In some cases, e.g. for the Payter Apollo
terminal, adapter cables are required. If a payment box
terminal is changed with a payment terminal of another
model, consult your distributor to verify if adapter cables are
required.
36. www.ecotap.nl
10-07-24