Download Print this page

Victorian Plumbing Arezzo 500 AZ5WCBLMBP Fitting Instructions

Wc unit

Advertisement

Quick Links

WC Unit
Fitting Instructions
Please follow them carefully and
leave this manual with end user
V2.07.24

Advertisement

loading
Need help?

Need help?

Do you have a question about the Arezzo 500 AZ5WCBLMBP and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Victorian Plumbing Arezzo 500 AZ5WCBLMBP

  • Page 1 WC Unit Fitting Instructions Please follow them carefully and leave this manual with end user V2.07.24...
  • Page 2 Before you begin: We recommend that this product is installed by a qualified tradesperson, Victorian Plumbing Ltd. accept no liability for products incorrectly installed or any damage to the floor, walls, plumbing, WC unit, or personal injury during installation. Check the chosen wall space for any pipes/cables prior to drilling Ensure the chosen cistern and toilet pan are the correct size for this unit.
  • Page 3 Installation Note: Diagrams are for illustration purposes only. Your WC Unit may superficially differ from these drawings however the installation guide steps still apply. Mounting Installation: Step 1: • Place the ‘Unit’ up against your chosen wall, then mark the positions for the holes at the back plinth of the unit.
  • Page 4 Panel Cut-Out Note: The following guide assumes that the front panel of the WC Unit and Top Fasica can be detached, however the installation guide steps still apply if your chosen WC Unit does not have this feature. Step 1: Place your chosen Pan on the finished surface floor and remove the front panel from the ‘WC Unit’...