Manual 2-post lift TW280W / TW280W-G Table of contents General ............................. 1 Identification of the instructions for use ..................... 1 Technical data ........................... 1 Modification of the product ....................... 2 Safety-related information......................... 2 5.1 Safety instructions ............................2 5.2 Monitoring and testing of the safety equipment..................3 5.3 Warnings and symbols ..........................
Page 3
Manual 2-post lift TW280W / TW280W-G Further appendix: EU Declaration of Conformity ⋅ TW280W_TW280W-G_2-post lift_Instruction_manual_uk_04_20240722.pdf Version -04, 22.07.2024...
Page 4
Manual 2-post lift TW280W / TW280W-G Important information: ASSEMBLY Find the assembly video for this lift You on YouTube: www.youtube.com/watch?v=hs8M7hzx9Nc or scan the QR code. PRODUCT PRESENTATION You can find the product presentation video for this lift on YouTube: www.youtube.com/watch?v=IeLa2uAqvLY or scan the QR code.
Page 5
24/7 Service Center: Our 24/7 Self-Service Center is a mobile website designed for self-diagnosis of issues with your Twin Busch lift. Here, we provide an extensive video collection covering a wide range of relevant topics for your Twin Busch lift, from fine-tuning and maintenance to component replacement.
With a lifting capacity of 8.0 tonnes and symmetrically telescoping double-jointed support arms in M-support arm design, the TW280W / TW280W-G is our most powerful power package in the 2-post range. Thanks to its extremely wide adjustment range, everything from small cars (e.g. Smart) to vans, even with a long wheelbase (e.g.
Likewise, improper use will invalidate the CE certification and the validity of the expert opinion. If there are any modification requests, please contact your dealer or the expert personnel of the Twin Busch GmbH beforehand.
Manual 2-post lift TW280W / TW280W-G 5.2 Monitoring and testing of the safety equipment Swing arm locking device Ensure that the lifts are locked and do not swing in the raised position. Mechanical locking device Catching and supporting the carriages in the event of a hydraulic failure.
Manual 2-post lift TW280W / TW280W-G 5.3 Warnings and symbols All warning labels are clearly visible on the lift to ensure that the user uses the equipment in a safe and appropriate manner. The warning signs must be kept clean and replaced if they are damaged or missing. Please read the signs carefully and memorise their meaning for future operations.
Page 10
Manual 2-post lift TW280W / TW280W-G Be sure to check the After a short lift Centre of gravity Support arm lock distribution check! pay attention! Lifting platform to the lifting in CAUTION! the safety catches Electrical voltage! (Safety Lock). Page | 5...
Manual 2-post lift TW280W / TW280W-G 6. Conformity with the product The TW280W / TW280W-G 2-post lift is CE-certified and is compliant with the Machinery Directive 2006/42/EC, fulfilling the standards EN 1493:2022, Safety of machinery EN 60204-1:2018 (look at: EU Declaration of Conformity, at the end of the user manual).
Manual 2-post lift TW280W / TW280W-G 8. Structure of the lifting platform 8.1 Before installation 8.1.1 Tools and equipment required ⋅ Suitable lifting tool for bulky and heavy components ⋅ Hammer ⋅ Phillips and slotted screwdriver ⋅ Torque spanner ⋅ Spanner attachments and open-end spanners ⋅...
Page 13
Manual 2-post lift TW280W / TW280W-G Using the floor plan, draw the outlines of two base plates on the floor with chalk to determine the installation positions for the two columns. 4) Erect and secure the post a) Use proper means to erect the post and make the posts face towards each other.
Page 14
Manual 2-post lift TW280W / TW280W-G Anchoring bolt (foundation (drilling (anchoring depth) thickness) depth) M20x220 ≥300 mm 180 mm 160 mm 240 mm 280 mm 225 mm 195 mm ≤60 mm Illustration: Work steps for fixing the pillars 5) Fix the holder for power unit and motor housing.
Page 15
Manual 2-post lift TW280W / TW280W-G 6) Fix the locking device. Orientation block Locking plate Cylinder head screw with Hex socket M6x8 Electromagnet Cylinder head screw with Hex socket M6 x15 a) Install the locking device. b) Connect the wires of the microswitch and the electromagnets to the terminals provided in the switch box.
Page 16
Manual 2-post lift TW280W / TW280W-G 7) Install the power unit and the control unit. Hex head screw with full thread M10x35 Anti-shock cushion Aggregate Washer M10 Spring washer M10 Hexagon nut M10 Switch box Hexagon socket cylinder head screw M6x12 8) Connect the electrical system.
Page 17
Manual 2-post lift TW280W / TW280W-G 8108 Limit switch Cross recessed flat head screw M5x10 Wire of the limit switch Motor cable Line of the solenoid valve Hydraulic power unit Wire of the electromagnet Wire of the rope sensor Control box...
Page 18
Manual 2-post lift TW280W / TW280W-G Set the position of the hexagon nut on the lower unit correctly so that the centre arm lock can be released automatically in the lower position. If the nut is not set correctly, there is a risk of...
Page 19
Manual 2-post lift TW280W / TW280W-G 11) Bleed the hydraulic line and make the mains connection. 1. Log in the setting system. Turn on the Main Switch. Push the button at the bottom of the screen, log in and reset the lifting system.
Page 20
Manual 2-post lift TW280W / TW280W-G 3. Pairing First switch on the main switch on both columns. Push the “Network” button at the first column, build a new network and you will get a key number. An example key number in the following is 6350. It is given randomly by the system.
Page 21
Manual 2-post lift TW280W / TW280W-G Go back to the first column and push the button "Done". Return to the main setting page and push the button "Pair" to enter pair control mode. Page | 16 Misprints, errors and changes excepted.
Manual 2-post lift TW280W / TW280W-G 8.4 Test points after assembly Check Screw torque of the expansion screws: 80-100Nm (63-74b.ft) Climbing speed ≥20mm/s (7/8"/s) Earthing resistance: not greater than 4Ω Height difference between the two slides ≤5mm (3/16") Mechanical locks are robust and synchronised when running at rated load? All control buttons function as "hold to run"?
Manual 2-post lift TW280W / TW280W-G Before lifting the vehicle and when carrying out any work on the vehicle, make sure that it has been properly stopped with the handbrake. 9.2 Description of the control unit (control box) Description Function...
Manual 2-post lift TW280W / TW280W-G 9.3 Structure of the touchscreen Symbol Function The signal intensity display. The signal is weak if the value followed by is less than 160. The display of the communication channel code. Two paired columns show the same channel code.
Page 25
Manual 2-post lift TW280W / TW280W-G Symbol Function Press this button to enter single control mode, in which you can control a single column. Press this button to enter pair control mode after the network setting has been completed. In pair control mode, lower the columns completely and press this "All to zero"...
Manual 2-post lift TW280W / TW280W-G 9.4 Lifting and lowering process flow chart Lifting process Lowering process Start Start Switch on the power Switch on the power Press the UP button (push-button) Press the DOWN Press the DOWN button (push-...
Manual 2-post lift TW280W / TW280W-G 9.5 Operating instructions 9.5.1 Lifting process 1. Read and understand the operating instructions before starting work. 2. Connect the power supply and switch the main switch to ON. 3. Park the vehicle with its centre of gravity in the middle between the two pillars.
10. Troubleshooting Attention: Do not hesitate to contact the expert staff of Twin Busch GmbH if you are unable to rectify an error yourself. We will be happy to assist you in rectifying the problem. In this case, document the error and send us pictures and a precise description of the error so that we can identify and remedy the cause as quickly as possible.
Manual 2-post lift TW280W / TW280W-G 11. Maintenance Regular maintenance of your lift will ensure a long and safe use of the lift. The following are suggestions for the maintenance intervals and the activities to be carried out. How often you service your lift depends on the environmental conditions, the degree of contamination and, of course, the stress and load on the lift.
Page 30
Manual 2-post lift TW280W / TW280W-G Components Methods Period Press the UP button to raise the lifts and check Swivel arm locking units that the four swivel arms are locked in position. Every day Add lubricant if necessary. Check the pads and remove any objects that slip...
Page 31
Manual 2-post lift TW280W / TW280W-G Components Methods Period Remove any dirt or other solid objects stuck under Ball bearing Every week the ball. Button Tighten the rotary knob. Every month Gear wheel Lubricate with lithium-based grease NO.1. Every 3 months If you comply with the above maintenance requirements, the lift will always remain in good working order and its service life can be extended.
If the lift malfunctions, simple faults may be the cause. Use the following list for troubleshooting *). If the cause of the error is not listed or cannot be found, please contact the expert Twin Busch GmbH team. Never attempt to carry out repairs yourself, especially on safety devices or electrical system parts.
Manual 2-post lift TW280W / TW280W-G 13.2 Foundation requirements and working area Requirements for the concrete: - Concrete C20/25 according to DIN 1045-2 (previous designation: DIN 1045 concrete B25). - The floor must be level and have a flatness of less than 5 mm/m.
Page 35
Manual 2-post lift TW280W / TW280W-G Other requirements: - The surrounding soil must be suitable for the load, e.g. no sandy soils, etc. - Reinforcements in the concrete are not mandatory for proper use of the lifting platform, but are recommended.
Page 38
Manual 2-post lift TW280W / TW280W-G Pos. Code Name of the component Specification Quantity 320204254 Motor (380V-3Ph) 380V-2.2kW-3Ph 320204232 Motor (400V-3Ph) 400V-2.2KW-3PH 320204277 Motor (220V-1Ph) 220V-2.2KW-1PH 330404007 Clutch 46mm(LBZ-T202BK-1) 330304007 Pressure relief valve YF08-40 207101100 Sealing ring type O EKM,6.5*1.5...
Manual 2-post lift TW280W / TW280W-G 13.4 Circuit diagrams (Note: Depending on the specific voltage requirements, the actual voltage of your lift may differ from the following diagram). Page | 34 Misprints, errors and changes excepted.
Page 48
Manual 2-post lift TW280W / TW280W-G Folding arm A: Pos. Code Description Specification Quantity 615035022 Round adapter assembly 6214EKZ-A4-B4-V0 410150121 Pressure spring 6254E-A2-B4 203204106 Hexagon nut with long head CLM-M16X30 614901612 1st section of the arm assembly E28-A20-B1 614901613 2nd section of the arm assembly...
Page 49
Manual 2-post lift TW280W / TW280W-G Folding arm B: Pos. Code Description Specification Quantity 615035022 Assembly of the lifting platform 6214EKZ-A4-B4-V0 410150121 Pressure spring 6254E-A2-B4 203204106 Hexagon nut with long head CLM-M16X30 614901612 1st section of the arm assembly E28-A20-B1...
Need help?
Do you have a question about the TW280W and is the answer not in the manual?
Questions and answers