Download Print this page
AEMC instruments HAZMAT 2155.01 Instruction Manual

AEMC instruments HAZMAT 2155.01 Instruction Manual

Static ground test system

Advertisement

Quick Links

Hazmat Grounding & Bonding
Site Considerations
Locate grounding points on the tankers and transfer pump.
Make
connections
When possible,
Hot Zone.
Resistance measurement should be
usually follows NFPA 472
always
better.
Higher resistance means longer static discharge time.
Installing the Grounding System
STEP 1:
WARNING:
Make sure the ground
Extractor tool before driving it into the ground to avoid thread damage.
Install/establish three
tanker
(X1),
one
pump
is not mounted to the fire truck. They should
• The grounding sites should be uphill and upwind, as well as
distressed tanker's Hot Zone.
NOTE:
One or more rods may be needed for each grounding system to obtain an
acceptable grounding
connected to
each
Distressed Tanker
grounding (to be
connected to the tanker)
X1
to damaged tanker first to avoid a potential
grounding
systems should be established uphill and outside of the
@ 1000Ω
separate static grounding
for
the recovery tanker
resistance.
Multiple rods should be
other
via jumper
Pump grounding (to
be connected to the
pump apparatus)
X3
Minimum 10' Spacing
compliant
with
your
or less, or NEC @
rod
is fully screwed tight into the Driver/
systems,
(X2), and a
third
be at least
cables.
Minimum 10' Spacing
5 Commonwealth Ave
Woburn, MA 01801
Phone 781-665-1400
Toll Free 1-800-517-8431
Visit us at www.TestEquipmentDepot.com
spark.
local jurisdiction
which
25Ω
or
less;
lower is
one
for the distressed
for
the pump
(X3) when
10 feet apart.
outside of the
3
6
to
feet
apart and
Take Off Tanker grounding (to be
connected to the tanker)
X2
99-MAN
the
100438v3

Advertisement

loading
Need help?

Need help?

Do you have a question about the HAZMAT 2155.01 and is the answer not in the manual?

Questions and answers

Summary of Contents for AEMC instruments HAZMAT 2155.01

  • Page 1 5 Commonwealth Ave Woburn, MA 01801 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.TestEquipmentDepot.com Hazmat Grounding & Bonding Site Considerations • Locate grounding points on the tankers and transfer pump. Make connections to damaged tanker first to avoid a potential spark.
  • Page 2 Testing the Grounding System STEP 2: Conduct independent Fall-of-Potential tests on each of the grounding systems. 1. Insert the auxiliary test electrode H(z) a few inches into the ground and away at a location that is central three rod grounding systems.
  • Page 3 Connect to the Grounding System STEP 3: Following the diagram, perform the steps below the following order: Connect grounding cable to the distressed tanker first and then to its grounding system Connect a grounding cable recovery tanker first and then to ground system Connect grounding...
  • Page 4 Static Ground Test System HAZMAT Kit Cat. #2155.01 PRODUCT PACKAGING Ships with: Waterproof Utility Case with inserts Cat. #2135.13 Ground Tester Model 6422 Cat. #2135.55 Set of 2, 14.5” T-shaped Auxiliary Ground Electrodes Cat. #2135.39 Ground Tester Driver/Extractor Tool Cat. #2155.11 50’...