Download Print this page

Forever Redwood THE PALOMAR ROUND PAVILION Assembly Instructions Manual

Advertisement

Quick Links

619-639-7503 or 619-677-1965 -Direct Lines for the Engineering Department
7am – 5pm Pacific Time, Monday - Friday
ASSEMBLY INSTRUCTIONS FOR THE
THE PALOMAR ROUND PAVILION
(CUSTOM)

Advertisement

loading
Need help?

Need help?

Do you have a question about the THE PALOMAR ROUND PAVILION and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Forever Redwood THE PALOMAR ROUND PAVILION

  • Page 1 619-639-7503 or 619-677-1965 -Direct Lines for the Engineering Department 7am – 5pm Pacific Time, Monday - Friday ASSEMBLY INSTRUCTIONS FOR THE THE PALOMAR ROUND PAVILION (CUSTOM)
  • Page 2 NOTE: To assemble your product, you need a Hammer, a Ratch, a Drill, and an impact drill. For bigger structures, a forklift may be needed too. Required Tools (Are not included in your hardware packing). PROCESS TO INSTALL THE HARDWARE PROVIDED. To install the bolts.
  • Page 3 To install the lag bolts. Place the washers in their lag bolts. After that, insert the lag bolts into the holes and carefully tighten it using a ratchet with the necessary socket. Use the washers only for the Wood Pieces. To install the deck screws.
  • Page 4 Step 1: Install the L-Brackets to the ground with ½´´ x 4´´ anchor bolts. Step 2: Attach the floor supports with 3/8´´ x 6´´ lag bolts ( )and 3/8´´ x 8´´ lag bolts ( P| 3 MRE-Formato-4-7-043 Rev. A NCDOCT0623-096...
  • Page 5 Step 3: Attach the floor supports to the L-Brackets with 5/16´´ x 3´´ Lag Bolts. Step 4: Assemble the frame floor with 3´´ deck screws. P| 4 MRE-Formato-4-7-043 Rev. A NCDOCT0623-096...
  • Page 6 Step 5: Attach the floor boards with 2 ½´´ deck screws. Step 6: Use 3/8´´ x 4´´ lag bolts to attach the posts to the floor. P| 5 MRE-Formato-4-7-043 Rev. A NCDOCT0623-096...
  • Page 7 Step 7: Attach the supports to the posts with 3/8´´ x 5 ½´´ bolts ( ). The supports will be attached together with 3/8´´ x 8´´ bolts ( ). Step 8: Use 5/16’’ x 3’’ lag bolts to attach the railings to the posts, the floor and to the supports. P| 6 MRE-Formato-4-7-043 Rev.
  • Page 8 Step 9: Attach the braces to the posts with 3/8´´ x 8´´ bolts ( ) and 3/8´´ x 10´´ bolts ( ). Step 9.1: Use 3/8´´ x 6´´ bolts ( ) to attach the braces to the supports. Step 9.: Use 3/8´´ x 7´´ bolts ( ) to attach the braces to the railings. Step 10: Attach rafters to the supports with 3/8´´...
  • Page 9 Step 11: Use 1 5/8´´ deck screws to attach the roof boards T&G to the rafters. Step 12: Use 1 5/8´´ deck screws to attach the overlapping roof boards the rof boards T&G. P| 8 MRE-Formato-4-7-043 Rev. A NCDOCT0623-096...
  • Page 10 Step 13: Use 4´´ deck screws to attach covers to the roof boards. Step 14: Finally, use 5/16´´ x 5´´ bolts to attach the ceiling fan base. P| 9 MRE-Formato-4-7-043 Rev. A NCDOCT0623-096...
  • Page 11 This completes the Pavilion Assembly. Hope you enjoy your set for many decades. If you ever have a problem or a question, don't hesitate to call us (619-639-7503 or 619-677-1965) or email us. We are here to support you. P| 10 MRE-Formato-4-7-043 Rev.