Electrical Connection - GE AZ41E09DAB Owner's Manual And Installation Instructions

Heat/cool model; heat pump model
Table of Contents

Advertisement

Installation
Instructions
230/208
VOLT ELECTRICAL CONNECTION OPTIONS
HOW TO CONNECT
1. Remove the room cabinet.
2. Connect to electrical
power.
3. Review the following
steps for applicable
supply
voltages.
4. Reinstall the room cabinet.
Power cords may include an arc fault interruption
or a leakage current detection interruption
device.
A test and reset button is provided on the plug case
or the inline case. The device should be tested on
a periodic basis by first pressing the TESTbutton
and then the RESETbutton. If the TEST button does
not trip or if the RESETbutton will not stoy engaged,
discontinue use of the Zoneline and contact a
qualified service technician.
POWER CORD
CONNECTION
A power supply kit with LCDImust be used to supply power
to the Zonelineunit. Theappropriate kit isdetermined by
the voltage, the means of electrical connection and
the amperage of the branch circuit.
Power supply kit
Connections of 208 or 230-volt circuits may be with (]
power supply kit or (] junction box kit.
All wiring, including installation of the receptacle, must
be in accordance with the NECand local codes,
ordinances and regulations. Codes require the use of
an arc fault or leakage current detection device on the
power cord except direct connect. Be sure to select the
correct cord for your installation.
Tandem
Perpendicular
LargeTandem
15Amp.
20 Amp.
30 Amp.
230/208-voltreceptacleconfiguration.
Branch
Circuit and
Proper GE Power Cord
Unit Amperage
Rating
with LCDI Device
15
RAK3153A
20
RAK3203A
30
RAK3303*
*Not Gpproved for use on 7000 BTU models.
ELECTRICAL SUBBASE
CONNECTION
230/208-volt models may be installed using one
of the following electrical subbases:
Branch
Circuit and
Proper GE
Unit Amperage
Rating
Subbase
Kit
15
RAK204D15P
20
RAK204D20P
30
RAK204D30P*
*Not approved for use on 7000 BTUmodels.
Electricalsubbases provide an enclosure for direct
connection or enclosed receptacles. Thesubbase kit
includes the power cord.
The instructions provided with the selected subbase kit
must be carefully followed. It is the responsibility of the
installer to ensure the connection of components is done
in accordance with these instructions and all electrical
codes.
13
DIRECT CONNECTION
Order the following Kit for 2:30/208-volt direct
connection
us required:
Branch Circuit and
Power Supply
Power
Unit Amperage
Rating
Accessory
Supply Kit
15
RAK4002A
RAK4157
20
RAK4002A
RAK4207
30
RAK4002A
RAK4307*
*Not approved for use on 7000 BTU models.
Skip to the "MAKE ELECTRICALCONNECTION TO THE UNIT"
section.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Zoneline 4100Zoneline 6100

Table of Contents