Advertisement

1.材料:70g胶版纸,正反面印刷;
2.印刷为黑白色单色印刷;
3.所有印刷内容正确、清晰,不得有漏印、误印,无印刷缺陷;
4.幅面:(210±3)X(145 ±3),(单位:mm);
5.未注公差按照GB/T 1804-m;
6.颜色及整体效果必须经过研发部确认后方能生产,产品检验以封样件为准;
7.符合RoHS现行标准要求和REACH指令。
8.说明书警示语部分的文字大写字母高度必须大于3mm。
2268778
WFQE7012
A
赵蕾洁 2022.03.31
刘松2022.03.31
刘泽旺2022.03.31
程⽊聪2022.03.31
70g
第1张
第1张
崔维明2022.03.31
说明书
X08061436

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the WFQE6012EVM and is the answer not in the manual?

Questions and answers

Summary of Contents for Hisense WFQE6012EVM

  • Page 1 1.材料:70g胶版纸,正反面印刷; 2.印刷为黑白色单色印刷; 3.所有印刷内容正确、清晰,不得有漏印、误印,无印刷缺陷; 4.幅面:(210±3)X(145 ±3),(单位:mm); 5.未注公差按照GB/T 1804-m; 6.颜色及整体效果必须经过研发部确认后方能生产,产品检验以封样件为准; 7.符合RoHS现行标准要求和REACH指令。 8.说明书警示语部分的文字大写字母高度必须大于3mm。 2268778 WFQE7012 说明书 赵蕾洁 2022.03.31 刘松2022.03.31 第1张 第1张 共 X08061436 刘泽旺2022.03.31 崔维明2022.03.31 程⽊聪2022.03.31...
  • Page 2 14.1mm 83.6mm 92.2mm 138.3mm 168mm 字体:Hisense Alfabet 字号:21pt USER’S OPERATION MANUAL 字体:Hisense 字号:10pt 25.5mm Before operating this unit, please read this manual thoroughly, 字体:Hisense Alfabet and retain for future reference 字号:12-10pt 53.7mm 起始位置 WFQE6012EVM WFQE6012EVMS 型号排列 WFQE6012EVMT 35mm 区域 WFQE7012EVM...
  • Page 4 QUICK USER MANUAL...
  • Page 5: Safety Information

    SAFETY INFORMATION...
  • Page 10: Description Of The Washing Machine

    DESCRIPTION OF THE WASHING MACHINE EMERGENCY DOOR OPENING...
  • Page 11: Before The First Wash Cycle

    BEFORE THE FIRST WASH CYCLE PREPARATION OF THE WASHING...
  • Page 15 Ensure that the water has...
  • Page 20 Fault Code List a. “F01” displayed on screen b. “F03” displayed on screen...
  • Page 21 nb” is shown...
  • Page 24 Important: Transport bolts which are not removed can cause damage to the appliance.
  • Page 25 The appliance must be installed on a solid and level floor surface (if necessry use a spirit level). If the appliance is to be installed on a wooden floor, distribute the weight by placing it on a 60x60cm sheet of plywood at least 3cm in thickness and secure it to the floor.
  • Page 26 CONNECT THE DRAIN HOSE In case the drain hose is installed as shown below:...
  • Page 27 2268778-X08061436A...

Table of Contents