Download Print this page

Mytee CSB-WALL Assembly Instructions Manual

Back wall of container shelter

Advertisement

Quick Links

Assembly Instructions for
Back Wall of Container Shelter
CSB-WALL
RECOMMENDED TOOLS
Page 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the CSB-WALL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Mytee CSB-WALL

  • Page 1 Assembly Instructions for Back Wall of Container Shelter CSB-WALL RECOMMENDED TOOLS Page 1...
  • Page 2: Recommended Tools

    RECOMMENDED TOOLS Equipment List Speed Wrench 22#.23#.24# Hammer (30lb) Rope (12#) Long Tape (50m) Hammer Drill*1 Lifter*2 Crane*1 Forklift*1 Protective equipment Page 2...
  • Page 3: Safety Precautions

    YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER. Thank you for purchasing our shelter. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly maintain the shelter. Please read these instructions before you begin.
  • Page 4 Parts List of CSB-WALL 2020 Part Code Description Parts Drawings Q'ty The Lower Uprights The Middle Uprights The Upper Uprights The Middle Rails Two Sides Upper Rails The Middle Bottom Tension Pipe Two Sides Bottom Tension Pipe Two Sides Square Steel Pipe...
  • Page 5 A. Installation of Back Wall Steel Frame 1. Two sides square steel pipe #28 is fixed to the container with drilling screws #33A. 2. The rails No.24 and tension pipe No.27 is connected with the connection plate welded on both sides square steel pipe upright No.28(left&right) as the below figure.
  • Page 6 Now your installation is completed. Page 6...