Download Print this page

Advertisement

Quick Links

Double Truss Building
Model# 304022T
L12.2 x W9.14x H6.7m
Assembly Instructions
Page 1

Advertisement

loading

Summary of Contents for Mytee 304022T

  • Page 1 Double Truss Building Model# 304022T L12.2 x W9.14x H6.7m Assembly Instructions Page 1...
  • Page 2: Recommended Tools

    RECOMMENDED TOOLS Equipment List Speed Wrench 22#.23#.24# Hammer (30lb) Rope (12#) Long Tape (50m) Hammer Drill*1 Lifter*2 Crane*1 Forklift*1 Protective equipment Page 2...
  • Page 3 YOU MUST READ THIS DOCUMENT BEFORE YOU BEGIN TO ASSEMBLE THE SHELTER. Thank you for purchasing our shelter. When properly assembled and maintained, this product will provide years of reliable service. These instructions include helpful hints and important information needed to safely assemble and properly maintain the shelter. Please read these instructions before you begin.
  • Page 4 Parts List of 304022 Double Truss Buildings Parts Name Parts Drawings Q'ty Box No. top truss for 3rd arch top truss for 1st arch(front wall) top truss for 5th arch (back wall) top truss for 2nd and 4th arch truss for 3rd arch truss for 1st and 5th arch(front&back wall) truss for 2nd and 4th arch...
  • Page 5 narrowed truss for 2nd and 4th arch narrowed truss for 1st arch ( front wall) corner base plate (left) for 1st and 5th arch corner base plate (right) for 1st and 5th arch middle base plate (left) for 2nd, 3rd, 4th arch middle base plate (right) for 2nd, 3rd, 4th arch...
  • Page 6 bottom tension tube for back wall-middle self adhesive felt 30+2 cable tie for fixing felt No.13 30+2 tension tube for roof cover front door bracing tube front door bracing tube-bottom expansion bolt 50+6 hex bolt for truss arches connection 120+20 hex bolt for base plate connection 40+6 hex bolt for purlins connection...
  • Page 7 back cover Φ8 nylon ropes 11+2 front cover tension straps 42+2 hanger rod(Φ48*1140mm) door beam(Φ60*1940/2050mm) winch bracket(□40*60*2010mm) 4m*8+2.3m PVC pipe winch pole for pulling door Page 7...
  • Page 8: Installation Process

    INSTALLATION PROCESS A—BASE PLATES INSTALLATION Please refer to the below diagram to mark the position of base plates The measurement is from center to center of base plates. Referring to the diagram and confirm the place of base plates. ENSURE THAT THE FOUNDATION IS SQUARE. Note: The expansion bolt (No.17) applies for fixing base plate on concrete ground.
  • Page 9 2. Find relative parts of posts and rails for front wall and assemble them according to the below diagram. Second Arch and Fourth Arch Installation 3. Find Trusses (No.1C, 2B, 3B and 4B) for second and fourth arch and connect them by hex bolt M8x70 (No.18).
  • Page 10 Third Arch Installation 4. Find Trusses (No.1, 2, 3 and 4) for third arch and connect them by hex bolt M8x70 (No.18). Page 10...
  • Page 11 Fifth Arch and Back Wall Installation 5. Find Trusses (No.1B, 2A, 3A and 4A) for fifth arch and connect them by hex bolt M8x70 (No.18). 6. Find relative parts of posts and rails for back wall and assemble them as below diagram. Purlin and Steel Wire Installation 7.
  • Page 12 9. Install steel wires (No.23, 24 and 24A) between arches by turnbuckles (No.25) and steel wire clamp (No.25A). 10. Fix the self adhesive felts (No.13) by cable ties (No.13A) on every truss joint to protect the roof cover. Page 12...
  • Page 13 C-INSTALLING COVER Roof Cover Installation NOTE: DO NOT install the cover onto the frame of your building in high wind conditions. A slight breeze is the most advantageous for cover installation. To take advantage of the breeze, pull the cover up over the arches with the breeze blowing in the cover like a sail filled with air. 1.
  • Page 14 Front Cover and Mechanical Door and Back Cover Installation 1. Install the mechanical door refer to the diagram below. 2. Install front cover (No.29) to the first arch and posts and rails on front wall by rope (No.28). 3. Install back cover (No.27) to the fifth arch and posts and rails on back wall by rope (No.28). Mechanical Door Installation Page 14...
  • Page 15 Front Cover Installation Page 15...
  • Page 16 Back Cover Installation Now your assembly is completed Page 16...