PVR VD 3 Operating And Maintenance Instructions Manual

PVR VD 3 Operating And Maintenance Instructions Manual

Dry rotary vane vacuum pumps

Advertisement

Quick Links

VD 3
VD 6
VD 8
Dry Rotary Vane
Vacuum Pumps
Operating and maintenance
instructions
Publication Number:
LI 4968.P1 May 2021
EN
TRANSLATION

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VD 3 and is the answer not in the manual?

Questions and answers

Summary of Contents for PVR VD 3

  • Page 1 VD 3 VD 6 VD 8 Dry Rotary Vane Vacuum Pumps Operating and maintenance instructions Publication Number: LI 4968.P1 May 2021 TRANSLATION...
  • Page 2: Table Of Contents

    Operating and maintenance instructions Index 1. General information ..................page 3 2. Product Specifications ..................page 4... 2.1 Pump description ...................page 4... 2.2 Expected use ....................page 4... 2.3 Forbidden use....................page 4... 3. Safety rules......................page 5 4. Transport - Handling...................page 5 4.1 Unpacking and components checking............page 5...
  • Page 3: General Information

    For any questions or information not included in this manual, please contact our Service Department, always providing: model (type), serial number, year of manufacture, stated on the pump name plate. PVR SRL   BV006MSA64...
  • Page 4: Product Specifications

    The characteristic data are valid up to the height of 800 m above sea level. WARNING: Any use in conditions different from the described ones should be authorized by PVR srl and only after proper technical and safety assessment. 2.3 Forbidden use...
  • Page 5: Safety Rules

    If there is no damage, proceed to the unpacking and check the machine. In case damages or defects are found, inform immediately PVR srl and the carrier. A representative will contact you or it may be dispatched to the site to inspect and file full damage report.
  • Page 6: Commissioning And Operation

    Operating and maintenance instructions 5 . Commissioning and operation 5.1 Location Check that the pipe sizes are suitable. Install the pump at least 10 cm away from the closest walls, in all direc-tions. Fix the pump to the ground through the suitable holes (1). 5.2 Electric connection WARNING: These operations must be carried out by qualified personnel.
  • Page 7: Maintenance And Spare Parts

    1000 h – replace when the height is 19mm VD 6 – VD 8 control every 1000 h – replace when the height is 21mm 6.2 Spare parts Pump sectional drawing and parts list are available upon request to PVR srl. LI 4968.P1...
  • Page 8: Troubleshooting

    Operating and maintenance instructions 7. Troubleshooting Troubles Possible Causes Solution 1. Dusty filter cartridge 1. Clean the filter cartridge may cause drop in perfor- with a blast of air. mance. If necessary, replace with a new cartridge. 2. Presence of sucked dust 2.
  • Page 9: Commissiong And Disposal

    Operating and maintenance instructions 8. De-commissiong and disposal De-commissioning does not require any specific operation. In case of disposition, separate the pump parts according to materials and proceed to their disposal respect-ing local regulations. LI 4968.P1...
  • Page 10 HEADQUARTERS: Via Santa Vecchia, 107 - 23868 Valmadrera (LC), Italy T +39 0341 1918 51 - F +39 0341 1918 599 info@pvr.it - www.pvr.it LOCAL UNIT: Via IV Novembre, 104F 23868 Valmadrera (LC), Italy...