User Manual Hybrid Inverter Applicable models H1PL-2J3K-EU H1PL-2J3.6K-EU H1PL-2J4.6K-EU H1PL-2J5K-EU H1PL-2J6K-EU Qingdao Nahui Energy Technology Co., LTD. Address:Room303,Entrance1,No.4Building, Lan Gu Entrepreneurship Center Phase 1,No.7,Keji Yilu Road, Aoshanwei Sub district Office,Jimo District Office,Jimo District,Qingdao,Shandong Applicable System The information in this manual is subject to change without notice.
1. Introduction 1. Introduction 1.1 Product Description The Haier H1PL-2J Series is designed for residential hybrid systems, which can work with batteries to optimize self-consumption. The unit can operate in both off-grid and WARNING: on-grid modes. Please refer to the specification of the battery before configuration.
Electrical installations must be done in accordance with the local and WARNING: national electrical safety standards. AC BACKUP Port of Haier H1PL-2J Series is not allowed to connect to the grid. WARNING: Do not touch any inner live parts until 5 minutes after disconnection from the utility grid and the PV input.
2. Safety & Warning 3. Overview 3.1 Screen Haier H1PL-2J Series adopts 7 inch color screen, it displays the status, operating information WARNING: and settings of the inverter. The Haier H1PL-2J Series does not support parallel (three- and single-phase) 3.2 Keypad operation on the AC-BACKUP port.
4. Installation 4. Installation 4.1 Select a Location for the Inverter Install on a wall or strong structure capable of bearing the weight of the machine (18.3kg). To select a location for the inverter, the following criteria should be considered: Install vertically with a maximum incline of +/- 5 degrees, exceeding this may cause Exposure to direct sunlight may cause output power derating.
4. Installation 4. Installation 4.2 Mounting the Inverter Dimensions of mounting bracket: Suitable fixing screws Φ6.8 Bracket 11.8 Locking screw Figure 4.4 Fix bracket on the wall WARNING: The inverter must be mounted vertically. 2. Lift up the inverter (be careful to avoid injury), and align the back bracket on the inverter with the convex section of the mounting bracket.
4. Installation 4. Installation 4.3 PE Cable Installation 4.4 PV Input Cable Installation An external ground connection is provided at the right side of inverter. Prepare OT terminals: M4. Use proper tooling to crimp the lug to the terminal. Before connecting inverter, please make sure the PV array open circuit Connect the OT terminal with ground cable to the right side of inverter.
Page 9
4. Installation 4. Installation 3. Pass the stripped DC cable through the nut and waterproof rubber ring. 6. Measure PV voltage of DC input with multimeter, verify DC input cable polarity. Positive terminal Negative terminal Figure 4.9 Figure 4.12 4. Connect the wire part of the DC cable to the metal DC terminal and crimp it with a special DC terminal crimping tool.
4. Installation 4. Installation 4.5 Battery Power Cable Installation 4.5.1 Normal battery cable installation 4.5.2 Extended battery cable installation If the battery cable size is required to be changed by the battery manufactuer, please refer to following content for the cable preparation. Otherwise, you may skip these steps. NOTE: External battery switch must be installed between the battery and inverter for safe maintenance purpose if the battery does not have built-in DC breaker.
Page 11
4. Installation 4. Installation Step 2: Un-assemble Grommet and Back shell over the cable as shown. Step 4: Crimping the lug as shown. Crimping heigth is 7.5+0/-0.2mm Grommet Back shell Gap is 1.0 mm Ref. ± Crimping length is 7.5 0.5 Correct direction: The chamfer in the rear position Figure 4.20 Wrong direction: The chamfer at the front position...
4. Installation 4. Installation 4.6 AC Cable Installation Step 5: Install grommet and back shel. There are two AC terminals and the assembly steps for both are the same. Take out the AC connector parts from the packaging. Assemble the grommet onto the connector body firstly Describe Numerical value Cable diameter...
4. Installation 4. Installation 4.7 Communication Cable Installation 4. Push Housing into Body. 4.7.1 Communication Port Definition Picture Port Function Click 1. Used for CAN communication between inverter and lithium battery BMS. CAN Port 2. (Optional) Used for battery temperature sensor connection when lead-acid battery is used.
Page 14
If lead-acid battery is used and battery temperature sensor is needed, please contact your distributor or Haier sales to purchase individually. Figure 4.32 1. Insert the RJ45 terminal end to the CAN port at the bottom of the inverter and fasten the swivel nut.
Page 15
4.7.4 DRM Port Connection (Optional) 4.7.4.1 For Remote Shutdown Function NOTE: Haier inverters support remote shutdown function to remotely control the inverter Haier hybrid inverter is designed to provide 12V power for DRED. to power on and off through logic signals.
Smart Meter. 2. One Smart Meter can be used with only one hybrid inverter. The Haier H1PL-2J Series inverter is able to connected Acrel meters or Eastron meters to fuilfill the control logic of the self-consumption mode, export power control, monitoring, etc.
Page 17
4. Installation 4. Installation 4.8.1 Single phase meter installation .29. .30.
Page 18
4. Installation 4. Installation 4.8.2 Three phase meter installation .31. .32.
5.1 Preparation of Commissioning Ensure all the devices are accessible for operation, maintenance and service. To protect the inverter’s AC grid connection conduction conductors, Haier recommends Check and confirm that the inverter is firmly installed. installing breakers that will protect against overourrent. The following table defines Space for ventilation is sufficient for one inverter or multiple inverters.
Page 20
5. Commissioning 5. Commissioning 4. Enter advanced settings (do not repeat this step for all subsequent operations). 5. Select the local grid standard code. Settings Menu Advanced Settings Settings Select Standard 2015-02-23 19 35 2015-02-23 19 35 2015-02-23 19 35 Information Export Power Set Select Standard...
Page 22
Recommended settings - Self-Use Mode. This mode can maximize the use of Setting photovoltaic power generation directly for household electricity, or store it in batteries HLS-1X5/10/15/20K Haier Select "Haier-LV” and use it for household electricity.If the other mode need to be used, please follow HLR-1x5/10/15/20K 6.6.6.4. Battery Select...
5. Commissioning 5. Commissioning 8. Please check in the accessory package and confirm the meter type first. 9. Switch on the inverter DC switch. 10. Switch on battery breaker. If the default meter is Acrel ACR10R16DTE, please select the meter type as "1PH Meter". 11.
6. Operation 6. Operation After setting the language, press "ESC" to access the main page. Pressing the ESC main menu key calls back the previous menu information UP/DOWN 0.00kW 2.526 0.00kW settings 0.00kW ENTER Monthly Energy UP/DOWN Main interface 0.00kW advanced info.
6. Operation 6. Operation 6.2 Main Menu There are four submenu in the Main Menu: Information 2015-02-23 19 35 1. Information Total Energy: 0000000kWh D evice Status : Generating 2. Settings This Year: 0000000kWh Battery Status : Normal 3. Advanced Information Backup Status : Last Year: 0000000kWh Normal This Month: 0000kWh...
Charge Power: Positive value indicates charging, negative value indicates affects the daily yield calculation. (If Haier monitoring system is used, must set discharging. the correct time zone of the system, otherwise datalogger will update the inverter time based on the time zone of the system.)
6. Operation 6. Operation 6.4.2 Set Address 6.5 Advanced Information Set the slave address of the inverter. The default address is 01. Detailed information can be viewed in this section: 1.Alarm Message Set Address Settings 2015-02-23 19 35 2.Running Message 3.Version Slave Address:01...
Page 28
6. Operation 6. Operation 6.5.2 Running Message 6.5.4 Communication Data This function is for maintenance person to get running message such as internal Internal communication data can be viewed in this section. For maintenance person only. temperature, Standard NO. etc.(Values are for reference only). Values are for reference only.
Page 29
6. Operation 6. Operation 6.5.6 Monthly Energy 6.5.8 Total Energy The screen shows the inverter monthly energy detail of different month. The screen shows the inverter total energy detail. Settings Total Energy Settings Monthly Energy 2015-02-23 19 35 2015-02-23 19 35 6 0 0 5 0 0 4 0 0 3 0 0 2 0 0 1 0 0 00.01...
6. Operation 6. Operation 6.6 Advanced Settings - Technicians Only Advanced Settings 2015-02-23 19 35 NOTE: This function is for authorised technicians only. Improper access Export Power Set Select Standard and operation may result in abnormal results and damage to the inverter. Password required –...
Page 31
This following list illustrates the grid standard options in the inverter which are subject to change. It is for your reference only. If customer has any doubts or uncertainty, please consult Haier service department for confirmation. Detailed protection limits can be viewed when choosing the code.
Page 32
6. Operation 6. Operation 6.6.4 Reset Password Reset Password: In this page, user can reset the inverter password, but the admin Total Energy password is always valid. Adjusting total generating power Total Energy : 0000056kWh 2015-02-23 19 35 Settings Reset Password 2015-02-23 19 35 Please Input New Password YES= <ENT>...
Page 33
Please refer to the battery compatible list on Haier company website for YES= <ENT> NO= <ESC> information on latest compatible battery models.
Page 34
6. Operation 6. Operation Settings Battery Select 2015-02-23 19 35 NOTE: 5G products support lead-acid battery. Select "Lead-Acid" in the ForceCharge SOC: 004% "Battery Select" and configure the following parameters according to different lead-acid batteries. ForceChg Plmt: 300.0W Settings Lead Acid Battery 2015-02-23 19 35 Power limit On: From Grid...
Page 35
Meter Type8 Due to the inconformity between battery cells, damages will be less likely 1Ph Meter to be avoided. Haier is not responsible for any potential damages caused by the use of lead-acid batteries. YES= <ENT> NO= <ESC> DOWN Figure 6.37 Meter Select...
Page 36
6. Operation 6. Operation 6.6.6.3.2 Meter Placement Mode 1: Self-Use Mode Logic(Maximize the usage of PV) PV Power Using Priority: Load>Battery>Grid Grid: Meter is installed at the grid connection point. Load Support Priority: PV>Battery>Grid Load: Meter is installed at the load branch circuit. Battery Charging Power comes from PV.
Page 37
6. Operation 6. Operation Mode 2: Feed In Priority Mode Logic(Feed the excess PV to Grid in order to gain Mode 3: Backup Mode Logic(Keep the Battery at a certain SOC and only use it subsidies) during power outage) PV Power Using Priority: Load>Grid>Battery Backup Mode Logic: Keep the Battery at a certain SOC and only use it during power Load Support Priority: PV>Battery>Grid outage.
Page 38
6. Operation 6. Operation Mode 4: Off-Grid Mode Logic(For Off-grid use and AC-Grid Port Disconnected) 6.6.7 Export power Set OverDischg SOC for Off-Grid Setting Range: From Battery “Forcecharge SOC” to 100% This function is to set the export power control. PV Power Using Priority: Load>Battery 1.
Page 39
6. Operation 6. Operation 6.6.7.2 Backflow Power 6.6.8 HMI Update Determine the allowed backfeed power. (System export to the grid) This function is used to update HMI software. Values are for reference only. Settings Backflow Power 2015-02-23 19 35 HMI Update 2015-02-23 19 35 B ackflow Power :...
Page 40
6. Operation 6. Operation 6.6.10 BaudRate RS485 6.6.11.1 AFCI Set This function is to change the internal communication Baudrate. Inverters have the built-in AFCI function which can detect the arc fault on the DC circuit and shut down the inverter to prevent a fire disaster. Settings BaudRate RS485 2015-02-23 19 35...
Page 41
6.6.11.2 EPS Mode During the normal operation, if an DC arc is detected, the inverter will shut down and EPS Mode needs to work with external Haier NPS switching box to achieve ATS give out the following alarm: switching function.
7. Maintenance 8. Troubleshooting Haier H1PL-2J Series inverter does not require any regular maintenance. However, cleaning the The inverter has been designed in accordance with international grid tied standards for heatsink will help inverter dissipating heat and increase the lifetime of inverter. The dirt on the safety, and electromagnetic compatibility requirements.
Page 43
8. Troubleshooting 8. Troubleshooting Message Name Information Description Troubleshooting Suggestion Message Name Information Description Troubleshooting Suggestion 1. Turn on the device in the ON/OFF Setting. Control device to shutdown 1. Grid side fault, restart the device. Surge Alarm On-site grid surge If it is still not eliminated, please contact the 1.
Page 44
8. Troubleshooting 8. Troubleshooting Message Name Information Description Troubleshooting Suggestion Message Name Information Description Troubleshooting Suggestion 1. Confirm that the grid is abnormal. 1. Confirm whether the battery model selection Wrong battery brand selection BatName-FAIL 2. Confirm that the AC cable connection is not is consistent with the actual one.
Please keep ready with you the following information before contacting us. Rated output power 1. Serial number of Haier Single Phase Inverter; Max. apparent output power 4.5 kVA, 10SEC 2. The distributor/dealer of Haier Single Phase Inverter (if available); Back-up switch time <20ms 3. Installation date. Rated output voltage 4.
Page 46
9. Specifications 9. Specifications Technical Data H1PL-2J3K-EU H1PL-2J3.6K-EU Technical Data H1PL-2J3K-EU H1PL-2J3.6K-EU Output AC(Grid side) General data Rated output power 3.6kW Dimensions(W/H/D) 333*505*249mm Max. apparent output power Weight 18.3kg 3.3kVA 4kVA Operation phase Topology High frequency insolation (for battery) 1/N/PE -25℃...
Page 47
9. Specifications 9. Specifications Technical Data H1PL-2J4.6K-EU H1PL-2J5K-EU Technical Data H1PL-2J4.6K-EU H1PL-2J5K-EU Input DC (PV side) Output AC(Grid side) Recommended max. PV power 8000W 8000W Rated output power 4.6kW Max. input voltage Max. apparent output power 600V 4.6kVA 5.5kVA Rated voltage Operation phase 330V 1/N/PE...
Page 48
9. Specifications 9. Specifications Technical Data H1PL-2J4.6K-EU H1PL-2J5K-EU Technical Data H1PL-2J6K-EU Input DC (PV side) General data Dimensions(W/H/D) 333*505*249mm Recommended max. PV power 8000W Weight 18.3kg Max. input voltage 600V Topology High frequency insolation (for battery) Rated voltage 330V -25℃ ~ +60℃ Operation temperature range Start-up voltage 120V...
Page 49
9. Specifications 9. Specifications Technical Data H1PL-2J6K-EU Technical Data H1PL-2J6K-EU Output AC(Grid side) General data Rated output power Dimensions(W/H/D) 333*505*249mm Max. apparent output power Weight 18.3kg 6.6kVA Operation phase Topology High frequency insolation (for battery) 1/N/PE -25℃ ~ +60℃ Rated grid voltage Operation temperature range 220 V/230 V The grid voltage range...
Need help?