Page 1
ASSEMBLY INSTRUCTIONS ITEM NO: I540-400 Queen Sleigh HB I540-402 Queen Rails w/ Decking I540-403 Queen Low Profile FB Thank you for purchasing this quality product. Be sure to check all packing material carefully for small parts that may come loose inside the carton during shipment.
Page 2
ASSEMBLY INSTRUCTIONS ITEM NO: I540-400 Queen Sleigh HB I540-402 Queen Rails w/ Decking I540-403 Queen Low Profile FB STEP 1: Lay the headboard face down on a soft surface. Attach the left leg and right leg to headboard by using 6 bolts(D), lock washers(E) and flat washers(F) with an allen wrench(G).
Page 3
ASSEMBLY INSTRUCTIONS ITEM NO: I540-400 Queen Sleigh HB I540-402 Queen Rails w/ Decking I540-403 Queen Low Profile FB STEP 3: Screw the bolts(H) into HB & FB. Make sure the slat bearer is in the UPPER position. Align the bolts with the holes in the end of side rails and attach the side rails to HB & FB using half moon washers(I), lock washers(J) and nuts (K).Then use a hex wrench to tighten all the nuts.
Page 4
ASSEMBLY INSTRUCTIONS ITEM NO: I540-400 Queen Sleigh HB I540-402 Queen Rails w/ Decking I540-403 Queen Low Profile FB STEP 6: Put the decking over the slats, secure decking to the slats with wood screws (N) through the pre-drilled holes in the decking as shown below.
Page 5
ASSEMBLY INSTRUCTIONS ITEM NO: I540-404 King Sleigh HB I540-406 King Rails w/ Decking I540-410 Cal King Rails w/ Decking I540-407 King Low Profile FB Thank you for purchasing this quality product. Be sure to check all packing material carefully for small parts that may come loose inside the carton during shipment.
Page 6
ASSEMBLY INSTRUCTIONS ITEM NO: I540-404 King Sleigh HB I540-406 King Rails w/ Decking I540-410 Cal King Rails w/ Decking I540-407 King Low Profile FB STEP 1: Lay the headboard face down on a soft surface. Attach the left leg and right leg to headboard by using 6 bolts(D), lock washers(E) and flat washers(F) with an allen wrench(G).
Page 7
ASSEMBLY INSTRUCTIONS ITEM NO: I540-404 King Sleigh HB I540-406 King Rails w/ Decking I540-410 Cal King Rails w/ Decking I540-407 King Low Profile FB STEP 3: Screw the bolts(H) into HB & FB. Make sure the slat bearer is in the UPPER position.
Page 8
ASSEMBLY INSTRUCTIONS ITEM NO: I540-404 King Sleigh HB I540-406 King Rails w/ Decking I540-410 Cal King Rails w/ Decking I540-407 King Low Profile FB STEP 6: Put the decking over the slats, secure decking to the slats with wood screws (N & P) through the pre-drilled holes in the decking as shown below.
Need help?
Do you have a question about the I540-400 and is the answer not in the manual?
Questions and answers