TABLE OF CONTENTS Keep this manual on-hand so it can be used by all operators of the unit. Use the unit only in the way described in this manual. Failure to follow the instruction in this manual may cause wrong operation. 1.
1. General description Thank you for purchasing our product. We know that in today's competitive marketplace, customers have many choices when purchasing laboratory equipment. We appreciate your choosing our quality product. We stand behind our products and want to let you know we are here if you need us. Before you use the unit, read this entire manual carefully to understand how to install, operate and maintain the unit in a safe manner.
2. Graphic symbols BE SURE THAT YOU UNDERSTAND ALL OF THESE SYMBOLS BEFORE OPERATING THE UNIT. Important operating and / or maintenance instruction. Read the accompanying text carefully. This symbol indicates items and procedures that are STRICTY PROHIBITED with regards to the unit. Potential electrical hazards.
4. The outward Vacuum port(KF25) Body cooling Vent out port Temp Controller Heater S/W Pressure gauge Ampere Meter MFC, BPR Body cooling Power Socket in port Voltage Meter Main S/W Over Temp. Control Door Door cooling Gas valve Gas in Gas out condensation port...
5. Installation ① Once the product is ③ Lift the box as shown in ② Unscrew the bottom of delivered, place the the picture. the box. package on a flat location. ④ Unwrap the bag. ⑤ Place the equipment on ⑥...
Page 8
Level controller Level controller <Clockwise> <Counter clockwise> Stopper <Lock position> <Unlock position> • When stopping moving • When moving equipment or installing equipment When installing equipment, fix the stopper to the floor by turning the level controller clockwise or counterclockwise. Serial label shows the electric power specification of the unit.
Page 9
< Configuration of Gas connection > ▶ Standard ▶ MC (MCV, MCS), BPR (Optional)
Page 10
< How to connect Pump to the Vacuum Port > Installation of Ball Valve & Clamp towards to Furnace Installation of Ball Valve & Clamp towards to Pump...
Page 11
< Configuration of coolant connection > Door cooling Door cooling in port out port Door condensation water drain 10¢ Compressor fitting Please connect a chiller in the door in case of running furnace at higher than 1500°C. Body cooling out port Body cooling in port Body condensed water drain x 3...
Please watch this tutorial 6. Vacuum Setting and Operation video for more information. 6.1 Standard ① Connect the input gas to the Gas in port(1/4” Tube Look) and Vent port(1/4” Tube). ② Connect the Pump to the Vacuum port. ③...
Page 13
6. Vacuum Setting and Operation 6.2 MC (MCV, MCS), BPR (Optional) ① Connect the input gas to the Gas in port(1/4” Tube Look) and Vent port(1/4” Tube). ② Connect the Pump to the Vacuum port. ③ Close the Gas valves & Vent valve. Vacuum Pressurization [Gauge status]...
Please watch this tutorial video for more information. 7. Temperature Setting and Time Programming example) Step 1. Ramp up to 800℃ for 2hours Step 2. Hold at 800℃ for 30minutes Step 3. Ramp up to 850℃ for 30minutes Step 4. Hold at 850℃ for 30minutes Press SET for 3 sec Press SET for 1 sec Press SET for 3 sec,...
Page 15
Changing setting After setting Changing setting After setting press for 1 sec press for 1 sec press SET for 1 sec press SET for 1 sec 1.LC has 4 ending modes of your 1.SSP means the starting temperature. pattern 1or 2 you input RST-Stop operating after last step HOLD-Keep temp of last step PTH1-Endless repeat of No.1 pattern...
Page 16
Changing setting After setting After setting press for 1 sec press SET for 1 sec press SET for 1 sec Keep 1.tS1 as oFF always. 1.SP2 means the second temperature you want to reach or hold Changing setting After setting After setting press for 1 sec...
Page 17
Changing setting After setting Changing setting After setting press for 1 sec press for 1 sec press SET for 1 sec press SET for 1 sec 1.SP3 means the third temperature you 1.tm3 means the time you want want to reach in order to reach at 1.SP3 Changing setting After setting...
Page 18
After setting Changing setting After setting press for 1 sec press SET for 1 sec press SET for 1 sec 1,tm4 means the time you want in order Keep 1.tS4 as oFF always to reach at 1.SP4 or hold Changing setting After setting After setting press...
Page 19
After setting After setting press SET for 1 sec press SET for 1 sec 1.rPt means how many time you what to Keep 1.rEn as 0 always repeat the pattern I. ※ 0 means infinite repeat. Operating program 2 After setting Operating press SET for 3 sec program 1...
Page 20
Present Temp (PV) Program 1 lamp lighting Check operating status Setting Temp SET 1 sec Push ON button so the furnace starts heating. (SV) (This step is only for vacuum muffle furnace. Tube furnace doesn’t have this step) Displaying current step Displaying heater output ( 0.- - 2 means 2%) Program 1...
Page 21
Displaying remaining time STEP "OFF" Do not change Program 1 Program 1 lamp lighting lamp lighting Check operating Check operating SET 1 sec SET 1 sec ※ STEP OFF-Do not change "HOLD OFF" Present Temp Do not change (PV) Setting Temp (SV) Program 1 Program 1...
8. Specifications (SH-FU-4.5MSV / 10MSV / 20MSV) Model SH-FU-4.5MSV SH-FU-10MSV SH-FU-20MSV Without vacuum - 1650C or below With vacuum - 1400C or below Operating Temperature With vacuum and gas - 1650C or below Temp Controller Programmable Controller(SP590) Sensor B type Heater Capa 2.9KW...
Need help?
Do you have a question about the SH-FU-4.5MSV and is the answer not in the manual?
Questions and answers