Download Print this page
SH Scientific SH-FU-50TH-WG Manual

SH Scientific SH-FU-50TH-WG Manual

1500c tube furnace gas flow package

Advertisement

Quick Links

Version : 2020 Rev.0
1500°C
TUBE FURNACE
Gas Flow Package
SH-FU-50/80/100/120TH-WG
1

Advertisement

loading
Need help?

Need help?

Do you have a question about the SH-FU-50TH-WG and is the answer not in the manual?

Questions and answers

Summary of Contents for SH Scientific SH-FU-50TH-WG

  • Page 1 Version : 2020 Rev.0 1500°C TUBE FURNACE Gas Flow Package SH-FU-50/80/100/120TH-WG...
  • Page 2: Table Of Contents

    Table of Contents Keep this manual on-hand so it can be used by all operators of the unit. Use the unit only in the way described in this manual. Failure to follow the instruction in this manual may cause wrong operation.
  • Page 3: General Description

    01. General Description Thank you for purchasing our product. We know that in today's competitive marketplace, customers have many choices when purchasing laboratory equipments. We appreciate your choosing our quality product. We stand behind our products and want to let you know we are here if you need us. Before you use the unit, read this entire manual carefully to understand how to install, operate and maintain the unit in a safe manner.
  • Page 4: Graphic Symbols

    02. Graphic Symbols BE SURE THAT YOU UNDERSTAND ALL OF THESE SYMBOLS BEFORE OPERATING THE UNIT. Important operating and / or maintenance instruction. Read the accompanying text carefully. This symbol indicates items and procedures that are STRICTY PROHIBITED with regards to the unit. Potential electrical hazards.
  • Page 5: The Outward

    03. The Outward < 50/80/100/120TH >...
  • Page 6: Key Feature

    04. Key Feature • Digital display of temp and time • Auto back up • Multi key-in (100Ω(DIN Pt100Ω), KPt100Ω(JPt100Ω), K(CA)) • Precise temperature control • Alarm when timer ends • Separated body and control box design • Over-temperature protection protecting from thermal shock(FU-xxTG) function(FU-xxTG)
  • Page 7: Installation

    05. Installation...
  • Page 8 05. Installation <Fig-1> Refer to above fig-1, level the equipment by adjusting the feet. Serial label shows the electric power specification of the unit. Connect power and turn on the main switch(E.L.B). Please do not raise up it high temp at once. It case to decline durability.
  • Page 9 05. Installation -How to use assemble pipe lines 1) Please check if all parts are in the package; -1 panel of 1 Flow meter and valve, -3 pipe lines with nuts, -1 Gas gauge with valve Fig-3) Fig-2) Fig-3) In case of Pipe parts for 2 gas channels; 1 panel of 2 Flow-meters and valves, 4 pipe lines with nuts, 1 Gas gauge with valve.
  • Page 10 05. Installation 2) Screw down the panel of flow meter and valve, connect 3 pipe lines each(Fig-4, -5, -6). Tighten the each bolt and nut with spanner. Fig-4) Fig-5) Fig-6)
  • Page 11: Setting And Operation

    06. Setting and Operation 1) Controller...
  • Page 12 06. Setting and Operation...
  • Page 13 06. Setting and Operation...
  • Page 14 06. Setting and Operation...
  • Page 15 06. Setting and Operation...
  • Page 16: Specification

    07. Specifications 1500℃ Tube Furnace Gas Flow Package - 50/80/100/120TH-WG...
  • Page 17 Memo...
  • Page 18 Memo...
  • Page 19 Memo...

This manual is also suitable for:

Sh-fu-80th-wgSh-fu-100th-wgSh-fu-120th-wg