High Voltage Stackable Energy Storage Battery Installation and Operation Manual +86-21-54326236 +86-21-54326136 info@aforenergy.com Building 7, No.333 Wanfang Rd, Minhang District, Shanghai, China. 201112...
Page 2
AF5000W-HC Operation Manual This Manual introduces AF5000W-HC AF5000W-HC is a High-voltage Lithium-iron Phosphate Battery energy storage system. Please read this manual before you install the nd follow the instruction carefully during the installation process. Catalogue 1 Technical Specificatio..........................1-2 2 Safety Information General Safety ..........................
Page 3
1. Technical Specication Battery Battery Battery Battery No.Of Number Battery Battery System System System System Battery Battery Cell High-Vo Operating Depth of Scalability Installation Charge Charge Discharge Discharge Display Certficates of battery System System Dimension (W*D*H) Net Weight Module Discharge ltage Technology Voltage Range...
Page 4
2. Safety Information 2 . 1 General Safety DANGER Please read the user manual carefully and check all the safety instructions Keep the batteries away from children and pets. on the equipment and in this document. Do not touch the energized battery, the temperature of the battery enclosure The "DANGER”...
Page 5
DANGER WARNING Before installation, ensure that the equipment is intact. Otherwise, electric shock or fire may occur. Do not connect or disconnect power cables when battery is power-on. Which may cause electric arcs and sparks, moreover fire or personal injury. Before connecting a power cable, check the positive or negative connectors ...
Page 6
Introduction AF5000W-HC on PV system. Link In Link Out Switch On First, open the air switch and long press the start button of the HV box (connected to the inverter) for more than 5s. The "normal" LED indicator on the front panel will flash. L1 to L5 display battery SOC, and L6 displays battery status.
Page 7
Switch Off Lon press the start button of the HV box (connected to the inverter) for more than 5s, the LED indicator on the front panel will flash, then release the button and the battery will be powered off. Then switched off the air switch (the system will store the SOC data when switching between the three states of charging/discharging/idling, but if the power is cut off too quickly and the system has not yet switched states, the SOC data will not be stored.) The Link Communication Port is the interface between the battery packs and the...
Page 9
Super five categories RJ45 Crystal RJ45 shielded crystal head head...
Page 11
As shown in the photos,from the third floor, each floor needs to be fixed to the wall with fixing plates...
Page 13
Single cluster connection method: Multi-clusters connection method: Connect the power through P+ and P- 1. Connect the first High-voltage box Link Com Terminal to the inverter BMS port for Connect the first High-voltage box Link Com Terminal to the inverter BMS port for communication beween inverter and battery.
Page 14
5. Commissioning Procedure After all the cable (power and communication) connections are completed, please ensure the following: • Ensure the DC switch on the inverter is OFF • Ensure the AC switch that is connected to the grid and EPS output (if used) of the inverter is OFF •...
Page 15
6. Maintenance Recharge Requirements During Normal Storage Battery should be stored in an environment with temperature range between -10°C ~ +45°C and maintained regularly according to following table with 0.5C(25A) current till 100% SOC after long storage time. Storage Relative Humidity of Storage Time Environment Storage Environment...