Download Print this page

Afore AF2500W-HB Operation Manual

High voltage stackable energy storage battery

Advertisement

High Voltage Stackable
Energy Storage Battery
Installation and Operation Manual
+86-21-54326236
+86-21-54326136
info@aforenergy.com
Building 7, No.333 Wanfang Rd, Minhang District, Shanghai, China. 201112

Advertisement

loading
Need help?

Need help?

Do you have a question about the AF2500W-HB and is the answer not in the manual?

Questions and answers

Summary of Contents for Afore AF2500W-HB

  • Page 1 High Voltage Stackable Energy Storage Battery Installation and Operation Manual +86-21-54326236 +86-21-54326136 info@aforenergy.com Building 7, No.333 Wanfang Rd, Minhang District, Shanghai, China. 201112...
  • Page 2: Table Of Contents

    AF2500W-HB Operation Manual This Manual introduces AF2500W-HB AF2500W-HB is a High-voltage Lithium-iron Phosphate Battery energy storage system. Please read this manual before you install the nd follow the instruction carefully during the installation process. Catalogue 1 Technical Specication..........................1-2 2 Safety Information General Safety ..........................
  • Page 3: Technical Specication

    2. Technical Specication Battery Battery Battery Battery Number System System System System Power Number Battery Battery Depth of Battery Cell Operating Scalability Installation Charge Charge Discharge Discharge Display Certficates Module of battery System System Dimension (W*D*H) Net Weight Discharge power Technology Voltage Range Current...
  • Page 4: Safety Information

    2. Safety Information 2 . 1 General Safety Please read the user manual carefully and check all the safety instructions Keep the batteries away from children and pets. on the equipment and in this document. Do not touch the energized battery, the temperature of the battery enclosure The "DANGER”...
  • Page 5  Do not connect or disconnect power cables when battery is power-on. Which  may cause electric arcs and sparks, moreover fire or personal injury. Before connecting a power cable, check the positive or negative connectors  are correct. Do not connect the battery with different batteries in parallel. ...
  • Page 6: Start

    Introduction AF2500W-HB on PV system. Start DTU Link Com Link In Link Out Switch On First, open the air switch and long press the start button of the HV box (connected to the inverter) for more than 5s. The "normal" LED indicator on the front panel will flash. L1 to L5 display battery SOC, and L6 displays battery status.
  • Page 7 Press Start button of the High-voltage box (which is connected to the inverter) for more than 5s, the LED indicator on the front panel will flash, and then release the button, the master pack will shut down after all the slave packs shut down (Sleep Mode). Tip: lf the system does not work, keep the internal DC switch on the battery cluster closed.
  • Page 8 To position...
  • Page 9 Super five categories RJ45 Crystal RJ45 shielded crystal head head High voltage box connection cable...
  • Page 13 DANGER Make sure you hear the connection terminal harness and According to the number of battery layers used by the customer, the link harnesses are self-locking plug nut click into the slot to secure the connection. connected from top to bottom. Finally, self- locking plug nut to complete the circuit. The clicking sound applies to both the battery interconnect The wiring harness must be connected in the sequence shown in Figure 9.1-9.2-9.3.
  • Page 14 Single cluster connection method: Multi-clusters connection method: Connect the power through P+ and P- 1. Connect the first High-voltage box Link Com Terminal to the inverter BMS port for Connect the first High-voltage box Link Com Terminal to the inverter BMS port for communication beween inverter and battery.
  • Page 15: Disassembly, Addition Of New Modules, Or Replacement Of Units

    4.4 Disassembly, Addition of New Modules, or Replacement of Units DANGER Regardless of whether a battery module is being added or whether the battery system is being temporarily or permanently disassembled, certain sections of the battery system will be required to be disconnected and taken apart.
  • Page 16: Commissioning Procedure

    5. Commissioning Procedure 6. Maintenance After all the cable (power and communication) connections are completed, please ensure the following: Recharge Requirements During Normal Storage • Ensure the DC switch on the inverter is OFF Battery should be stored in an environment with temperature range between -10°C ~ +45°C •...