Download Print this page

This Document; Tools/Materials Required - Rinnai RCB Series Manual

Gas conversion

Advertisement

Available languages

Available languages

WARNING
CAUTION
CAUTION
CAUTION
IMPORTANT
Before you get started, confirm that the inlet gas pressure is between the minimum and maximum pressures
allowed for this boiler.
If subsequent conversions are made, then a new conversion label must be placed on the boiler to accurately
reflect the gas type.
The following items are supplied with the conversion kit:
Table 3
VENTURI WITH ORIFICE
(PROPANE MODEL ONLY)
Orifice
Black Label

TOOLS/MATERIALS REQUIRED

Rinnai Commercial Boiler Conversion Manual
Failure to correctly assemble the components according to these instructions may result
in a gas leak or explosion.
The gas supply shall be shut off prior to disconnecting the electrical power, before
proceeding with the conversion.
Do not touch any other areas on the PC board other than the described buttons
while power is supplied to the appliance. Parts of the PC board are supplied with
120 volts AC.
Do not touch the areas at or near the heat exchanger or hot water lines. These
areas become very hot and could cause burns.
VENTURI
(NG MODEL ONLY)
White Label
Phillips head screwdriver
Tongue and Groove Plier/Adjustable wrench
4 mm and 6 mm Allen wrenches
SCREWS, GASKET,
CONVERSION LABEL
O-RING
THIS
DOCUMENT
5

Advertisement

loading

This manual is also suitable for:

Rcb301anRcb399an803000053803000048803000054803000049